Professional Documents
Culture Documents
COMPANY :JONT OPERATIONS. PROJECT : JO-SC459-MM19 - Maintenance of Tanks, Vessels & Welding Services
CONTRACTOR: GULF SPIC.
PROCEDURE NO: LOCATION: MGC/WAFRA DATE:
REPORT NO: O1.
Description Of Work : MATT INSPECTION FOR BOTTOM PLATE PRIOR TO TISSUE APPLICATION AT TK-103 A.
(as per attached drawing)
Instruments Used
DATE TIME DRY DEW POINT RH% ST
Instruments Instrument No. Calibration
Used Status
Bacth No
Paint Used Manufacturer Color WFT Avg. DFT Thinner No % Of Thinner
Base Curing Agent
E-GLASS - 1250 NA NA
CHOPPED Saint Gobain. SGV-1220 WHITE.
STRAND MAT
Designation
Signature
Date:-
Abbreviation: Prep - Preparation, A/S - Air Less Spray, C/S - Conventional Spray