Professional Documents
Culture Documents
Prepared by: S. Cervera Jr. Ref No. MS-1132-0 Reviewed by: Cesar A. Asiado
Table of Contents
No. Description
1 Mix Design
2 Compliance Check List
3 Recent Material Test Reports
4 Previous Approval with Similar Mix Design
• C 20/10 N/mm² OPC (Previous Approval with Same Mix
Design)
• C 25/10 OPC (Screed) (Previous Approval with the Same Mix
Design)
License of Manufacturer & Supplier/Agent
5
(Al Wataniya Doha Ready Mix Plant)
Certificates of Manufacturer & Supplier/Agent
(Al Wataniya Doha Ready Mix Plant)
• MOE Certificate
6
• NRMCA Certificate
• Plant Calibration Certificate
Certificate of Origin
7
Technical Data Sheet (TDS)
8 ISO Certificates
9 Method of Statement of Work
Company Profile and Other Details
10
Company Profile
MIX DESIGN
CONTRACTOR : Al Sarh Trading & Contracting INQUIRY : 1132
Design & Build Contractor : DATE : 5-Aug-19
Project Name: Roads and Infrastructure in South of Al Mashaf - Package 04 REV. No. 0
Designer :
Client : Public Works Authority (Ashghal)
Consultant : AECOM
CONCRETE MIX DESIGN
I. GENERAL INFORMATION
MIX CODE : 2010PC Concrete mix type: Mix E Compressive Strength (Mpa) : 20 fck, cube Slump (mm) : 150 -20/+40
DESCRIPTION : C 20/10 N/mm² OPC ACEC Class: AC-2 Total Cementitious (kg) : 300
CONCRETE
REINFORCED SUBSTRUCTURE CONCRETE Sulphate Class: DS-2 W/c ratio : 0.60
ELEMENT:
Maximum size of aggregate
LOCATION : ICON ISLAND / MARINE WORKS BEACH 16 GROYNE Durability level: High 10
(mm):
II. INGREDIENTS DETAILS AND BATCH WEIGHTS (kg/m³)
SSD Specific Correction
Gravity Absorption Dry Dry Batch Volume
SOURCE SUPPLIER TYPE / CONFORMITY MATERIALS Weight
(SSD) correction (%) Condition Weight (kg/m³) (Ltrs.)
(Kg/m³) (kg/m³)
QATAR QNCC CEM I,EN 197-1 OPC 300 3.15 300.0 95.24
QATAR GOVERNMENT POTABLE WATER 110.0 1.00 126.6 110.00
QATAR AL WATANIYA ICE PLANT FLAKE ICE ICE 70 1.00 70.0 70.00
QATAR SODAMCO SUPER PLASTICIZER EPSILONE HW 380 4.0 1.05 4.0 3.81
OMAN QPMC COARSE AGG., BS EN 12620 4/10 GABBRO 1017 2.90 0.50 -5.09 1012 350.69
QATAR QPMC FINE AGG., BS EN 12620 0/4 WASHED SAND 912 2.60 1.26 -11.49 901 350.77
REMARKS: * 167 kg/m³ of potable water to be added and mix by the end user at site.
* UCC shall provide the availablity of Xypex Admix C-1000 NF at Design & Build of Lusail Palace project. UCC shall also be
responsible for adding and mixing 7 kg/m3 of Xypex Admix C-1000 NF into concrete at site. Cesar Asiado
QA/QC Engineer | Al Wataniya Concrete
*Super plasticizer dosage may vary (+/- 1 kg/m³ ) due to climatic condition's affect to fresh concrete properties in accordance with NRMCA - Concrete Technologist Middle East
QCS 2014 Section 5 Parts 15.4 (1~2) and as recommended in admixture's technical data sheet. M : (+974) 6663 1702 | T : (+974) 4490 9817
*Fresh concrete shall not be placed if the shade temperature exceeds 40⁰C as per QCS 2014, Sec. 5, Part 15.2 (3). E : cezar@watancon.com
DESCRIPTION : C 25/10 OPC (Screed) ACEC Class: AC-2 Total Cementitious (kg) : 350
CONCRETE
REINFORCED SUBSTRUCTURE CONCRETE Sulphate Class: DS-2 W/c ratio : 0.57
ELEMENT:
Maximum size of aggregate
LOCATION : ICON ISLAND / MARINE WORKS BEACH 16 GROYNE Durability level: High 10
(mm):
II. INGREDIENTS DETAILS AND BATCH WEIGHTS (kg/m³)
SSD Specific Correction
Gravity Absorption Dry Dry Batch Volume
SOURCE SUPPLIER TYPE / CONFORMITY MATERIALS Weight
(SSD) correction (%) Condition Weight (kg/m³) (Ltrs.)
(Kg/m³) (kg/m³)
QATAR QNCC CEM I,EN 197-1 OPC 350 3.15 350.0 111.11
QATAR GOVERNMENT POTABLE WATER 99.5 1.00 115.6 99.50
QATAR AL WATANIYA ICE PLANT FLAKE ICE ICE 100 1.00 100.0 100.00
QATAR SODAMCO SUPER PLASTICIZER EPSILONE HW 380 3.5 1.05 3.5 3.33
OMAN QPMC COARSE AGG., BS EN 12620 4/10 GABBRO 857 2.90 0.50 -4.29 853 295.52
QATAR QPMC FINE AGG., BS EN 12620 0/4 WASHED SAND 939 2.60 1.26 -11.83 927 361.15
REMARKS: * 167 kg/m³ of potable water to be added and mix by the end user at site.
* UCC shall provide the availablity of Xypex Admix C-1000 NF at Design & Build of Lusail Palace project. UCC shall also be
responsible for adding and mixing 7 kg/m3 of Xypex Admix C-1000 NF into concrete at site. Cesar Asiado
QA/QC Engineer | Al Wataniya Concrete
*Super plasticizer dosage may vary (+/- 1 kg/m³ ) due to climatic condition's affect to fresh concrete properties in accordance with NRMCA - Concrete Technologist Middle East
QCS 2014 Section 5 Parts 15.4 (1~2) and as recommended in admixture's technical data sheet. M : (+974) 6663 1702 | T : (+974) 4490 9817
*Fresh concrete shall not be placed if the shade temperature exceeds 40⁰C as per QCS 2014, Sec. 5, Part 15.2 (3). E : cezar@watancon.com
&203/,$1&(
&+(&./,67
COMPLIANCE SHEET STATEMENT FOR CONCRETE GRADE
C 20/10 N/mm² OPC
To : AL SARH TRADING & CONTRACTING
Project: ROADS & INFRASTRUCTURE IN SOUTH OF AL MASHAF - PACKAGE 4
Supplier: Al Wataniya Concrete
Mix Code : 2010PC
Max. 32 Max. 32
QCS 2014 Sec.5
4 Fresh Concrete Temperature (°C), BS EN 12350-2 WILL COMPLY
Part 6
** Subcontracted
Max.0.60 0.57
Water : Cement Ratio QCS 2014 Sec.5
3 COMPLY
Part 6
Max. 32 Max. 32
QCS 2014 Sec.5
4 Fresh Concrete Temperature (°C), BS EN 12350-2 WILL COMPLY
Part 6
** Subcontracted
** Subcontracted
** If the Sand Equivalent valus is less than 60% and greater than or equal to 50%, the sand shall be considered non-harmful and is accepted provided that
the Methylene Blue Value is less than or equal to 1.0 (g/kg)
** Subcontracted
BS EN 196-2: 2013
4 Sulphate Content mg/L 3 Max.2000 COMPLY
Clause 4.4.2
2+
8 Zinc as Zn APHA 3125 mg/L 0.07 ≤ 100 COMPLY
2+
9 Lead as Pb APHA 3125 mg/L < 0.1 ≤ 100 COMPLY
NOT
21 Average Sieve Residue BS EN 196-6 (%) 8.10 --
SPECIFIED
NOT
22 Fineness BS EN 196-6 (m²/kg) 360 --
SPECIFIED
NOT
23 Heat of Hydration @ 7 days ASTM C186 (kJ/kg) 230 --
SPECIFIED
24 Autoclave Expansion ASTM C151 (%) 0.150 Max. 0.80 COMPLY
NOT
25 Density BS EN 196-6 (g/m³) 3.130 --
SPECIFIED
** Subcontracted
5(&(177(67
&(57,),&$7(6
~GROUP QATAR
·P · P-~ Y9P ~PJ~ !J ~gJ g.aJ ~ Ji.u>..ig5
CONSTRUCTION TECHNOLOGY LABORATORIES GROUP W.l.l.
Test Report
Aggregate Particle Size Distrubution - Sieving Method
BS EN 933-1:2012*
Sieve Size (mm) 16.0 14.0 10.0 8.0 6.3 5.0 4.0 2.0 1.0 Pan
Retained weight (g) 0.0 9.8 341 .4 1114.0 131 3.5 833.8 336.5 62.4 2.4 50.6
Retained weight (%) 0.0 0.2 8.4 27.4 32.3 20.5 8.3 1.5 0.1 1.2
Cumv. Rt (%) 0.0 0.2 8.6 36.0 68.4 88.9 97.2 98.7 98.8 100.0
Passing(%) 100.0 99.8 91.4 64.0 31.6 11.1 2.8 1.3 1.2 0.0
BS EN 12620 Limits (%) --- 98-100 85-99 -- -- -- 0-20 0-5 - -
BS EN 12620 Grading -10mm
100
r
90 + t
;,R
0
80 f -
70 ; .
' t t
v - i
Cl
.!:
1/)
1/)
60
so
t
j
+ l
I v 1
l I - - -Grading
'/
C1l 40 I I I
0..
30 r-- -
20
10
0
r
+ T
'~
/ BS EN 12620 Grading Limits
Cat egory = Ge85/20
Sieve (mm)
QCS 2010 Sec. 05, Part 02-Table 2.1 QCS 2014 Sec. 05, Part 02-Table 2.1
(Limits) (Limits)
Materials finer than 63tJm (%)
1.5% max. 2% max.
1 v"'~"''" Eng.Fot
5
oud AI Shboul
'"=~
C.T.L. G : oup w.L.L.
C'P. tJ:"' £,.90(\!1-
P. 0. 8:>.(. ~,4t1l- o ... ha- Q;'ttar .ii(" .J ]'......
End of report
..../ I · aye of 1
c(((r
I
ISO 9001: 2015
MOE/QGOSM
Certified
ISO 17025
Accredited Laboratory
(!1 qualityaustria
Oua!itv
Succeed w.th
ISO 14001 : 201 5
Certified
Auditors/Inspectors
ISO 18001: 2007
NRMCA
State of Qatar - Doha Industrial Area, Kassarat Road, R/A 41, P.O. Box 14212 I CR: 690081 Tel: 40370130 I Capital: QAR 200,000 I Email: info@ctlgroupqatar.com I Web: ctlgroupqatar.com
~GROUP QATAR
. ,0 . ,0 .:. y 9.P. lJAl.:'_J.ij ~ u ~gJ ~ ~ Ji..u.>..i gS'
CONSTRUCTION TECHNOLOGY LABORATORIES GROUP W.l.l.
Test Report
Coarse Aggregate Testing & Evaluation Summary
CTLG-Q Client: AI Wataniya Concrete
Contractor: N/A
Consultant: N/A
Source: N/A
Chandra Kanta
Laboratory Supervisor
State of Qatar - Doha Industrial Area, Kassarat Road, R/A 41, P.O. Box 142121 CR: 69008 I Tel: 40370130 I Capital: QAR 200,000 I Email: info@ctlgroupqatar.com I Web: ctlgroupqatar.com
~GROUP QATAR
. p. p. :J Y9.P ~.PJ ~ !J ~gJ g.iSJ ~ jLu>..i gS
CONSTRUCTION TECHNOLOGVlABORATORIES GROUP W.l.l.
Test Report
Aggregate Particle Size Distribution - Sieving Method
BS EN 933-1:2012*
Sieve Size (mm) 8.0 6.3 5.0 4.0 2.0 1.0 0.500 0.250 0. 125 0.063 Pan
Retatned we1ght (g) 0.0 3.8 7.6 8.7 43.2 87.0 284.3 577.2 315.2 52.7 13.1
Retained weight(%) 0.0 0.3 0.5 0.6 3.1 6.2 20.4 41.4 22.6 3.8 0.9
Cumv. Rt(%) 0.0 0.3 0.8 1.4 4.5 10.8 31 .2 72.6 95.3 99.1 100.0
Passing(%) 100.0 99.7 99.2 98.6 95.5 89.2 68.8 27.4 4.7 0.9 0.0
BS EN 12620 Limits (%) - 95-100 -- 85-99 -- - 30-70 - -- - -
BS EN 12620 Grading - Sand
100
90
BS EN 12620 Grading Limits
I
l l .Y~
t I
I t
l
y 1 H- ·-
80
Category = GF85 I
0~
~~
70
C)
1:
·;;;
..
Ill
60
so
I t t j
I
1/ I -+--1-- lI - . -Grading
Cl.
40
30 ; . 1/ i t
• t
20
10
~
./
I I
H-I I
0
0 0
M
"'0
0 "'
~ "'0
N
0
"' 0 0 0 O M 0
0 0 ,....; C'i ..,: 1./)u:) cO
Sieve (mm)
QCS 2010 Sec. 05, Part 02·Table 2.1 QCS 2014 Sec. 05, Part 02-Table 2.1
(Limits) (limits)
Materials finer than 631Jm (%)
3%max. 3% max.
.ISO 17025 Accred1ted Test
••Information provided by client
Note·.
• The sample tested as per QCS 2014 requirement.
()
• This document may not be reproduced except in its entirety. The r< !suit pertain o~ the particular items test d .
1
Laboratory Supervisor u .l ~Jr.)!;.-'; ..,·· ~~ .::~ ~...:S;...;;S P a· 5s Manager
'~~
C .T. L. G . vup w.L. L .
CR Hr- 690!\P.
P. 0. Bo..c: 14~ 1 2 · Doha. 0;1 t~r
1- .A h
End of report
g I P4ge 1on-
fl1 MOE / QGOSM 1 15017025
Accredned Laborat01y
(!'] qualityaustria ISO 9001: 2015
ISO 14001 : 2015 <«(r Certified
Auditors/Inspectors
Certified SUcceed \\ith OuaJrty ISO 18001 : 2007
NRMCA
State of Qatar - Doha Industrial Area. Kassarat Road, R/A41, P.O. Box 14212 1CR: 690081 Tel: 40370130 I Capital: QAR 200,000 I Email: info@ctlgroupqatar.com I Web: ctlgroupqatar.com
~GROUP QATAR
· P · P · :J '-="' 9.P. ~.ftJ ~ !J ~gJ 9iSJ' ~ Ji.u>..i gS
CONSTRUCTION TECHNOLOGY LABORATORIES GROUP W.l.l.
Test Report
Fine Aggregate Testing & Evaluation Summary
CTLG-Q Client: AI Wataniya Concrete
Contractor: N/A
Consultant: N/A
Source: N/A
I
ASTM C289... Potential Alkali-Silica Reduction in alkalinity - RC 86.67 --
Reactivity of Aggregates (mmoi/L) I
Dissolved silica-SC by Gravimetry 3.219 --
Information ptOV1ded by chent
....As per QCS 2014 Sec.5, Part.2,Tab!e.2 1 If the Sand Equ1va1ent value IS less than 60% and greater than or equal to 50"/o, the sand shall be cons1dered non·harmtul and IS accepted prov1ded that the
Methylene Blue value is less than or equal to 1 o (glkg) (Methylene Blue Repon SN# 48046-8)
... By Jnterpreta!Jon of result as per appendix XI aggregate considered 1nnocuous (not reactive)
-··tso 17025 accredoted test
Note -
• The sample tested as per QCS 2014 requorement
l
• This document may not be reproduced except 1n its entirety The result perta1n only to the particular 1tems tested
-""'"'
..........,
Chandra Kanta I
Laboratory Supervisor (I >..)~!WUP
' f{mo.OM '"00"'
P OJects Manager
,~d
.,., .":.-;! ..~ ).:.;:..":L.:· . :> ~:.:; · ~"'-; :...:~~~JS
C .T.L. G.uup w.L.L.
CR fl o ~900P
P. 0 . B to: : J!' ~. 1 2 - 0~';:\a - Qatar "J.A A -"'. _ r1
I \ F"
e) MOE/QGOSM
Certified
1 15017025
Accred~ed Laboratory
(!1 qualityaustria
Succeed \-.ith Quaity
ISO 9001 : 2015
ISO 14001 : 2015
ISO 18001 : 2007
c«(r
NRMCA
Certified
Auditors/Inspectors
State of Qatar - Doha Industrial Area, Kassarat Road, R/A 41, P.O. Box 14212 I CR: 690081 Tel: 40370130 I Capital: QAR 200,000 I Email: info@ctlgroupqatar.com I Web: ctlgroupqatar.com
~GROUP QATAR
.p.p.:J Y9.P. ~-PJ~!J ~gJg.UJ ~ ji.u>..ig.S
CONSTRUCTION TECHNOLOGY LABORATORIES GROUP W.l.l.
Test Report
Summarv of Water
CTLG-Q Client: AI Wataniya Concrete
Contractor: N/A
Consultant: N/A
Chemical Composition
Physical Properties
V.'Pro::~"
. .,.,.,~ """"'
Noe:-
t Th'1s d acumen may not be repro uce except ·1n ·t
1 s e nf1ret y. The resu It pert.
a tn on y to the part·1cuIar 1
't ems t est ed .
/"\
.---...,.
Andrea Viola CTi.)GROUP
·f·?::..J~)>: ).!.;:i; ...;";' ...~.~;'('"; :...:S~?
~I
- 1 ;;
RPT-0262-Rev.O
c .T.L. G : u UP W.L.L.
CP. N o b9008
P. 0 . Box: 14212 - Doha - Qatar
, o• report
)
""'7 l
lA
r Page 1 of 1
(l) MOE/QGOSM
Certified
I IS017025
Accredited Laboratory
(!] qualityaustria ISO 9001 : 2015
ISO 14001 : 2015
ISO 18001: 2007
r«rr Certified
Auditors/Inspectors
Succeed with Qua!ity
NRMCA
State of Qatar - Doha Industrial Area. Kassarat Road, R/ A41, P.O. Box 14212 I CR: 690081 Tel: 40370130 I Capital: QAR 200,000 I Email: info@ctlgroupqatar.com I Web: ctlgroupqatar.com
~GROUP QATAR
.,o.,o.:J Y9.P. ~.PJ~!J ~gJg.i.SJ l)..U>.S ji..u>jg.S
CONSTRUCTION TECHNOLOGY LABORATORIES GROUP W.L.L.
Test Report
Cement Testing Summarv
CTLG-Q Client: AI Wataniya Concrete
Contractor: N/A
Consultant: N/A
Project:• Evaluation of Material
Sample type:• OPC
Sampling location:* AWC
Source: N/A
Supplier:* QNCC
Sampled by: Client Report SN. #: 48038
Client reference: N/A Issue date: 7-0ct-2019
CTLG-Q reference: SEPOS-007 Job order#: CTLGQ-J0-1-5SEP19-001
Sampling method: N/A Tested by: Andrea & Bhupindra
Sampling date: 3-Sep-2019 Environment: N/A
Testing date: 07-Sep-2019 to 05-0ct-2019 Deviation: N/A
Chemical Composition
BS EN 197-1/ QCS 2014
Test (ASTM C114) Test Result
Requirements
Silicon Dioxide- Si02 (%) 19.85 --
Aluminium Oxide- AI203 (%) 4.76 ---
Ferric Oxide- Fe20 3(%) 3.83 ---
Calcium Oxide- CaO (%) 64.30 -
Magnesium Oxide- MgO (%) 1.95 --
Sulfur Trioxide- S03 (%) 2.75 <3.5%
Loss on Ignition@ 950"C (%) 1.67 s 5.00%
Insoluble Residue (%) 0.52 s 5.00%
Tricalcium Silicate - C3S (%) 59.6 -
Dicalcium Silicate - C2S (%) 11 .9 --
Tricalcium Aluminate - C~ (%) 6.1 ·-
Tetracalcium Aluminoferrite- C4AF (%) 11.7 --
Sum of Si02 & CaO (%) 84.2 -
BS EN 1g6-2 Chloride- cr (%)*** 0.014 s 0.10%
Ratio Ca0/Si0 2 3.2 "' 2.0
Physical Properties
Test Method Test Result QCS 2014 Requirements
Initial 200 ;,; 60 minutes
BS EN 196-3 Setting time (minutes)...
Final 260 ---
BS EN 196-1 Flexural strength- average 2days 4.9 -
(MPa)*** 28days 9.7 -
BS EN 196-1 Compressive strength- 2days 22.5 "= 10.0 MPa
average (MPa)*** 28days 45.7 ;,; 42.5 & s 62.5 MPa
BS EN 196-3 Soundness (mm)'** 1 s 10mm
ASTM C451 Early Stiffening (%) 79.4 50% min.
BS EN 196-6 Average Sieve Residue(%) 8.1 -
BS EN 196-6 Fineness (m 2/kg) 360 -
ASTM C186 Heat of Hydration (kJ/kg)@ 7 days.. 230 --
ASTM C151 Autoclave Expansion (%)** 0.15 0.80% max.
BS EN 196-6 Density (g/cm3)** 3.13 ---
•1nfonnat1on prov1ded by cl1ent
··subconlracled
...ISO 17025 accredned test
Note-
• The sample tested as per QCS 2014 requirement
· ThiS document may not be reproduced except 1n its entirety The result pertain only to the particular items tested
MOE/QGOSM
Certified Auditors/Inspectors
State of Qatar- Doha lndusnial Area, Kassa rat Road, R/ A 41, P.O. Box 142121 CR: 69008 I Tel: 40370130 I Capital: QAR 200,000 I Email: lnfo@ctlgroupqatar.com I Web: ctlgroupqatar.com
35(9,286$33529$/
:,7+6,0,/$50,;
'(6,*1
C 20/10 N/mm² OPC
Previous Approval with
Same Mix
C 25/10 OPC (Screed) Previous
Approval with Same Mix
~ Qat ar Rail
Document Review Sheet (Engineer)
Company Management System
NO.;
lll'LJ::
Name:
SCREED MIX DESIGN FOR FRONT OF HOUSE & BACK OF HOUSE MIX CODE
KH2520SG·MSHEIRB STATION (ALWATANIYA CONCRETE)
Prepared by Approved by
PM
Name Nabij Sh.l)laby Johan Mltr
Signature
/,&(16(V2)
0$18)$&785(5
6833/,(5$*(17
Al Wataniya DOHA
Ready Mix Plant
2019/07/17 :ad#l ~IJ
No 1 of 1 :p/)J cb6.o
11111111111111111111111111111111111
11111111111111111111111111111111111
30563 ·uw·,.:.,ll
·- ..~ ~ 1.~ ··""I -
,O.OJ 30563 :UlJl+JI J+w.]l pl)J
:o-!)1~ I iio..ulJI culwp!J '4ibgll :UljQ:ill p..wtll
10/05/ 2020 :J+w]l .cW:wl 2-/Ju 11 / 05/2005 :J+w]l .cl.W.il 2-JJu
40000000 :Jl.alllJ.l}IJ o::~gn.o d!)gl.w..o ul:3 a5.).J1> :uti gj l!iJI J5.WJ I
#> :oluu.o.JI ~ h.U>.i :J+w.]l a.Jb
0 :Eg}OJI ::~ :J..C
JlciU I u l.o g.l4o
h.UJj
19 #I 25663400009 J!~l = ulhlw =
62 #I 32384 a.Cl!lilll J!~l o.5j.lll
Page 1 of 2
30563 : ~I ,o.OJ
amber certifies that the above mentioned establishment has been registered
d.dio.Jig OJ(;ujl OJijg
Ministry of Commerce and Industry
Page 2 of2
30563 : J;uoJI flOJ
amber certifies that the above mentioned establishment has been registered
STATE OF QATAR .;.b!~JJ
Authorizers W~H~~ ~OO ~~~
General Directorate of Passport uljl~ J....lt.ll o.;\J'/1
&(57,),&$7(V2)
0$18)$&785(5
6833/,(5$*(17
DKCĞƌƚŝĨŝĐĂƚĞƐ
Al Wataniya DOHA
Ready Mix Plant
..J" .! .! ;; ·; llg .::.L.s..cl~ ~_,.b...;i.ll i:i.....IL...:.JI ~~
Qatar General Organization for Standardization
CONFORMITY CERTIFICATE
w ,-Y>IV ~ ( nA) ,-iJ ~IJ "-:!•-4-liJ-:!jJ)J"--! oJJL..:...il 4.:...\~ i.ioJ
~
According to the Ministerial Decree No. (168)/2017
0
liiiiiii
CERTIFICATE NO.
D ATE OF ISSUE :
DATE OF VALIDITY:
RM730
Oct. 28 , 2019
Oct. 28 , 2020*
LL
liiiiiii
COMPANY NAME AL W ATANYIA CONCRETE (DOHA READYMIX) CO.
P.O.Box 243 81 Doha-Qatar Tel: 40838751 Fax: 44832334
PLANT LOCATION IND. AREA ST. 41
F APPLICATION NO.
SAMPLE lD NO.
192 180-201 9
QCD-QM-RM/ 19-CS-30
w Aggregates
Type.
OPC
NORt"\fAL
M ixes.
SRC
ORMAL
Mixes.
CEMENTITIOUS MATERIALS
:\1ixes. Admixture
Standards
Of Control.
0 -Gabbro
-(20 mm)
-(10 mm)
-C45/20 - B 20/20
-C60/20 -c 30/20
• DCP
-C40/20 OPC +45%GGBS+ 5%MS PC2'1-0M
-CS0/20 OPC +55%GGBS+ 5%MS • Sodamco
At
Plant
At
Lab
>
F
-Wash Sand
-HW380
-HP540M
----
Scope of Aud1t: Qatar General Orgamzat10n for Standardization (Quahty and Conformity Department) hereby attests that test results for
Samples of materials and mixes as described above conform to the requirements of the standard specifications as per QCS 2014.
This attestation had based on the results of tests conducted on random samples selected from the above materials and mixes using sampling
----
iiiiiiiiiiiilil procedures given in the specific rules and evaluated as per Q CS 2014. It is applicable only to the materials and mixes as described in this
:2
Certificate and does not cover the entire production of the factory or others branch of the company.
Responsibilitv: Materials and mixes mentioned above or not; shall be check for quality of products at any time according to QCS 2014
with the requirements of the projects and approved by Engineer or Consultant. All mixes were marking with(*) mean Cementitious contents
in excess of 400 kg/m3, and shall not be used unless special consideration has been given to the effect for heat of hydration and reduce
0 Restrictions*: It has not permitted to use materials not listed in this certificate without approval from Quality and Conformity Department.
Condition: The above ready mixed plant/supplier had founded to be satisfactory at the time of inspection and quality audit
(In accordance with standard regimes and requirements of the QCS 2014). And this certificate will remain valid for the
IJ. Period shown above, Quality and compliance audits will carry out by Qatar General Organization for Standardization
(Quality and Conformity Department) to prove that quality procedure is satisfactory.
z Notes:
1. QS has no any responsibility for supplying of modified or poor quality by the manufacturer/supplier during the
validity period.
0 2. It is important to apply two months before expiry date of validity for renewal of this conformity certificate.
3. The required fee for this certificate has been stated according to the decision No. (112)/2019
0
u·· .: .: ;; ·; Ug .:.:.l..:i=lg..o..!J ~,.b.SJI i:i..Ak.JI ~I
Qatar General Organization for Standardization
CONFORMITY CERTIFICATE
w ~y IV ~ (I'll) ~J ~,, '-:!.>-4-JI j;!j J ) ft! ~JJL=JI .i..:...:.~
I l.aA,
~
According to t he Ministerial Decree No. (168)/2017
0 CERTIFICATE NO.
DATE OF ISSUE:
DATE OF VALIDITY :
RM 731
Oct. 28 , 2019
Oct. 28 , 2020*
LL
iiiiiiii
COMPANY NAME AL WATANYIA CONCRETE (DOHA READYMIX) CO.
P.O.Box 24381 Doha-Qatar Tel: 40838751 Fax: 44832334
PLANT LOCATION IND. AREA ST. 41
t-- APPLICATION NO.
SAMPLE ID NO.
192187-2019
QCD-QM-RM/19-CS-30
w Aggregates
Type.
OPC SRC
NORMAL NORMAL
Mixes. Mixes.
CEME"'TITIOUS MATERIALS
Mixes. Admixture
Standards
Of Control.
0 -Gabbro
-(20 mm)
-(10 mm)
-C45/20 - B 20/20
-C60/20 -c 30/20
-C40/20 OPC +45%GGBS+ 5%MS
-CS0/20 OPC +55%GGBS+ 5%MS
• DCP
~
PC2'lOM
Sodamco
At
Plant
At
Lab
iiiiiii procedures given in the specifi c rules and evaluated as per QCS 2014.1t is applicable only to the materials and mixes as described in this
:!
Certificate and does not cover the entire production of the factory or others branch of the company.
Responsibility: Materials and mixes mentio ned above or not; shall be check for quality o f products at any time according to QCS 2014
with the requirements of the projects and approved by Engineer or Consultant. All mixes were marking with (*) mean Cementitious contents
in excess of 400 kg/m3, and shall not be used unless special consideration has been given to the effect for heat of hydration and reduce
0 Restrictions*: It has not permitted to use materials not listed in this certificate ·without approval from Quality and Conformity Department.
Condition: The above ready mixed plant/supplier had founded to be satisfactory at the time of inspection and quality audit
(In accordance with standard regimes a nd requirements of the QCS 2014). And this certificate will remain valid for the
LL Period shown above, Quality and compliance audits will carry out by Qatar General Organization for Standardization
(Quality and Conformity Department) to prove that quality procedure is satisfactory.
z Notes:
1. QS has no any respons ibility for supplying of modified or poor quality by the manufacturer/supplier during the
validity period.
0 2. It is important to apply two months before expiry date of validity for renewal of this conformity certificate.
3. The required fee for this certificate has been stated according to the decision No. (112)/2019
0 ,.
, GP.?-
;xt Recommended by: ........................'1......................................
Head of CC Sectio n
v
Approved
150&$&HUWLILFDWHV
Al Wataniya DOHA
Ready Mix Plant
National Ready Mixed Concrete Association
has been inspected by the undersigned licensed professional engineer for conformance with the
requirements of the Check List for Ready Mixed Concrete Production Facilities. As of the
inspection date, the facilities met the requirements for production by
()~<2?,~:. '
,0"-~,_,00
cP--1'~
Qo:J:J.,u
• ,/".... ~«' /<<-
~.:S·
'
~
(:l-c!f.
~:}'·~,c.-<' February 01, 2018 February OJ, 2020
"'-<."-'0 v."'"""
Seal) .,.....~< Inspection Date Certification Expiration Date
,-<.,'<0 (
.c::··':.:··<· "\
This compapf\Vill maintain these facilities in compliance with the Check List requirements and will
correct promptly any deficiencies which develop.
NOTICE: The Check Ust indicates only that plant facifities are satisfacto!y for the production of concrete when properly opemed. Conformance of the
concrete itself with specification requirements must be verified by usual inspection methods in accoolance with sales agreements.
This rertificate is issued by the National Ready Mixed Concrete Association on verification thai the proruction facility conforms to the requirements of the
NRMCA Certification of Ready Mixed Concrete Production Faci~ties, QC3. Unau~ed reproduction or misuse of this rertificate may result in legal action.
National Ready Mixed Concrete Association 900 Spring Street • Silver Spring • Maryland 20910
National Ready Mixed Concrete Association
has been inspected by the undersigned licensed professional engineer for conformance with the
requirements of the CheckList for Ready Mixed Concrete Production Facilities. As ofthe
inspection date, the facilities met the requirements for production by
r~~-;~·4f ,+
Vo.;..""~<'v'<'
()0-\
,s.<~
~ v"-o:vo (}
u~~~:~0~0,~~~
,~ ·+·c~~."'"b<:)
'\
.,.6:-«i «:- February OJ, 20J8 February OJ, 2020
/{~~al) Inspection Date Certification Expiration Date
•'
/
This company will maintain these facilities in compliance with the Check List requirements and will
correct promptly any deficiencies which develop.
NOTICE: The Check Ust indicates only that plant faciUties are satisfactory for the production of concrete when properly operated. Conformance of the
concrete itself with specification requirements must be verified by usual inspection methods in accordance with sales agreements.
This certificate is issued by the National Ready Mixed Concrete Association on verification that the production facility conforms to the requirements of the
NRMCA Certification of Ready Mixed Concrete Production Facilities, QC3. Unauthorized reproduction or misuse of this certificate may result in legal action.
National Ready Mixed Concrete Association 900 Spring Street • Silver Spring • Maryland 20910
3ODQW&DOLEUDWLRQ&HUWLILFDWHV
Al Wataniya DOHA
Ready Mix Plant
LiAsTECH
CALIBRATION
LABTECH CALIBRATION SERVICES WLL
Shop No. 8, Building No. 15, Barwa Village
P.O. Box 15481 Doha, Qatar
Tel Nos.: +974 40299729 Fax Nos.: +974 40298424 Email: info@labtechqatar.com
www.labtechqatar.com
CALIBRATION PROCEDURE: M002 Industrial Balances I NPL-UK WGC04S6 Clause 5.3 Calibration Procedure using Substitute Material
CALIBRATION STANDARD/$
DESCRIPTION BRAND/MAKE MODEUTYPE ID NUMBER TRACEABILITY REFERENCE
ASCS/2018/A878-01
Standard Weight Set Adier r
.....
,.. ..IIIYII
, REF-Ni001 , REF-Ni002 ASCSI2018/A870-V2
REF-M003, REF-M004 ASCS/2018/A878-03
ASCS/2018/A878-04
REMARKS
1. UUC: Unit Under Calibration. Calibration set points were chosen according to customer's request.
2. LEFT AS FOUND. No adjustment done.The user should determine the suitability of the device for its intended use.
3. Standard/Manufacturer specifications including Statement of Compliance was reported according to customer's request.
4. Resuft ccmp!iance "•.'as bc.sed on comparing the sum of the error and estimated uncertainty against specifica:ticn defined by the customer
or the manufacturer.
5. Accreditation applies up to 1500 kg.
6 . Reported res:..:!ts ~tw-are those obtained at tima of calibration and shaU refer only to the part:adar device calibrated. Recatibraticn or reptacemer.t
may be required should there be abnormalities in the performance of the unit during actuai application.
7. Estimated Uncertainty stated herein are expressed at a level of confidence of not less than 95% with k=2 and is computed based on GUM and
the calibration procedure stated above.
8. Measurement/calibration results are traceable to Sl through National Metrology Institutes and ISO/IEC 17025:2005 accredited calibration facilities.
9. This report shall not be reproduced, except in full, without the authorization of Labtech Calibration Services.
10. This laboratory is accredited in accordance with the recognized International Standard ISOIIEC 17025:2005. This accreditation demonstrates technical
d
11
¥ ,'•:
~\~'
\·~ "' ', f:lf.'AT' ' ,
yc::. -~, \ -·
Kart Subramaniyan
~ ,,
>'- ~ . : ;·,
·.' .....,.. -
• ,. ~ ·
~·) " ;
I
He S. Tarun
CALIBRATION CERT I FICATE
No.: FM 2019-QS?9
AGGREGATE SCALE
Capacity : 10000 kg Resolution : S.Okg
CALl BRATION RESULTS
WATER SCALE
Capacity :800kg Resolution : 0.5kg
CALIBRATION RESULTS
.. "'""'
IUU.V "'"'"""'
IUV.U 0.0% 3(j~ PASSED
200.0 200.0 0.0% 3% PASSED
300.0 300.0 0.0% 3% PASSED
400.0 400.0 0.0% 3o/o PASSED
500.0 500.5 0.1% 3% PASSED
600.0 600.5 0.1% 3% PASSED
ESTIMATED UNCERTAINTY,± 0.3 kg
CEMENT SCALE
Capacity :2400 kg Resolution :2 kg
CALIBRATION RESULTS
Cali~gineer
CALIBRATION CERTIFICATE
P-!~.: FM 2019-0679
ICE SCALE
Capacity : 900 kg Resolution : 2 kg
CALIBRATION RESULTS
MICROSILICA SCALE
Capacity :900 kg Resolution :2 kg
CALIBRATION RESULTS
ADMIXTURE SCALE
Capac ity : 90kg Resolution : 0.05 kg
CALIBRATION RESULTS
STATEMENT OF COMPLIANCE
The UUC was f ound to be in compliance with the specifications of the fc!!o-Ning:
1. QCS 2014 Section 5 Clause 7.2 .4. i
CA L IBRATION CERTIFICATE
No.: FM 2019..()667
CALIBRATION PROCEDURE : M002 Industrial Balances I NPL-UK WGC0496 Clause 5.3 Calibration Procedure using Substitute Material
CALIBRATION STANDARD/S
DESCRIPTION BRAND/MAKE MODEUTYPE 10 NUMBER TRACEABILITY REFERENCE
TVCSPL 18106/345-02
REF-M001 , REF-M002
Standard Weight Set Adler F11M1 lVCSPL 18/061345-03
REF-M003, REF-M004
ASCS/2018/A876-04
REMARKS
1. UUC: Unit Under Calibration Calibration set points were chosen according to customer's request.
2. LEFT AS FOUND. No adjustment done.The user should determine the suitability of the device for its Intended use.
3. Standard/Manufacturer specifications InCluding Statement of Compliance was reported according to customer's request
4. Result compliance was based on comparing the sum of the error and estimated uncertainty against specification defined by the customer
or the manufacturer.
5. Accreditation applies up to 1500 kg .
6. Reported results were those obtained at time of calibration and shall refer only to the particular device calibrated. Recalibration or replacement
may be required should there be abnormalities in the performance of the unit during actual application.
7. Estunated Uncertainty stated herein are expressed at a level of confidence of not less than 95% with 1\-2 and is computed based on GUM and
the calibration proc.;dure stated abov&.
8. Measurement/calibration results are traceable to Sl through National Metrology Institutes and ISOIIEC 17025:2005 accredited calibration facilities.
9. This report shall not be reproduoed, except in full, without the authonzation of l abtech Calibration Services.
10 This laboratorY is accredited in accordance with the recognized International Standard ISOIIEC 17025:2005. This accreditation demonstrates technical
competence for a defined scope and the operation of a laboratorY quality management system (refer to the joint ISO-ILAC-IAF Communlqu6
dated JanuarY 2009).
Calibratlon Engineer
AGGREGATE SCALE
Capac1ty 10000kg Resolution 10 kg
CALIBRATION RESULTS
WATER SCALE
Capacity 500 kg Resolution 1 kg
CALIBRATION RESULTS
CEMENT SCALE
Capacity 1000kg Resolution . 2kg
CALIBRATION RESULTS
C. II~-·
P~ of 3
CAL I BRATION CERTIFICA TE
No.: FM 2019-0667
ICE SCALE
Capacity 400 kg Resolution 1kg
CALIBRATION RESULTS
MICROSILICA SCALE
Capacity : 900kg Resolution . 1 kg
CALIBRATION RESULTS
ADMIXTURE SCALE
Capacity : 90kg Resolution : 0.5kg
CALIBRATION RESULTS
SPECIFICATION RESULT
APPLIED VALUE UUC READI NG ERROR
:1: COMPLIANCE
20.0 kg 20.0kg 0.0% 15% PASSED
25 .0kg 25.0 kg 0.0% 1.5% PASSED
30.0 kg 300 kg 00% 1 5% PASSED
ESTIMATED UNCERTAINTY, :1: 0 .29kg
F COMPLIANCE
__..,=,__
The UUC was found to be in compliance with tlOftL) following
~.._V ,~'~<r\ ~
1
1 acs 2014 Section 5 Clause 7 2 41 "' 11.,.
* ff ~STECH ~\\
,.-0~ ~ ~IBRATIQN ;J J)
Ca~on Engineer ~~Doh. " k ~' Quality Ch
-,~4r
-..::::page '3 of3
&(57,),&$7(2)25,*,1
List of Raw Material Source & Suppliers
Admixture
• EPSILONE HW 380 QATAR SODAMCO
Prepared By:
S.Cervera Jr./ AWC
Representative
7HFKQLFDO'DWD6KHHW (TDS)
Date; 01.12.17
Usage Instruction;
Use appropriate respirators.
Use tight fitting goggles.
Use gloves, boots & protective clothing to protect skin from prolonged
contact with wet cement.
,Gd{
dl,)J~l
Mohd!Al i'-Af'USUtaiti'
n<: ral l\1~ n ~q_.,t. f
General Manager
Ho'Of!-
P.O. Box : 1333 DOHA-QATAR .).i - ~.Jo'l' 1333 : ...,.v-o
25: .-J.;.:....;- - -147 1 2586- ~4712585 : ,>oSU - 44712880( .1.~ 5) 4471 18 11 : ~l.)_,i;l>-..44694354 /5/6/7- 44693800 : ~)I ~~ .)~
Head office Tel. · 44693800 -44694354 / S/6/7 - Factory Tel. 447 1181 1 (5Lincs)- 44712880 - Fax : 44712585 - 4~712586- C.R. No. 25
Emai l : qatarcemenr@qatar.nct.qa Wcbsuc : http)/www.qatarcemcnt.corn
-
1/2
HW 380
NEW GENERATION POLYCARBOXYLATE ETHER
SUPERPLASTICIZER “EXTENDED SLUMP RETENTION”
DOSAGE RATES
Range of dosage rates: from 600 to 2200 ml. ml per
100 Kg of cementituous content.
PROPERTIES Dosage above the recommended values can be
• High water reducing
practiced. Still, the required dosage for a specific job
• Superior slump retention. Ease of delivery to point
with controlled delay in setting and workability should
of placement
be determined by in-situ trials
• High workability-ease of placing and compaction
Dosages varies dependant on water/cementituous
without segregation
ratio of the concrete, cement type, pozzolanic
• Reduced risk of cracks
2/2
HW 380
materials and ambient temperatures. our internal QA/QC program and quality
Trials are to be conducted prior to determine required management msystem to ensure consistency and
performances. quality.
COMPATIBILITY NOTE
EPSILONE HW 380 can be used in mixes containing: The information included on this Technical Data Sheet is the sole
• Silica fume property of SODAMCO Holding. The unauthorized disclosure, use,
• Fly Ash dissemination or copying (either whole or partial) of this data sheet
or any information it contains, is prohibited and subject to legal
• GGBFS pursuit.
• Pozzolanic Binders
EPSILONE HW 380 is not compatible with NSF & MSF Edition: 07/16-A
superplasticizers.
Consult SODAMCO's technical dept. for advice.
PACKAGING
EPSILONE HW 380 is supplied in:
1000 liter containers.
STORAGE
EPSILONE HW 380 can be stored up to 1 year from
manufacturing date, out of direct UV light and
protected from extreme temperatures.
In case of frost, the product recovers its properties
after progressive thawing and homogenizing by
agitation.
QUALITY STATEMENT
All our products are manufactured to comply with
,62&HUWLILFDWHV
AL WATAN IYA CONCRETE COMPA NY L.
Head Office: Street 41, Gate 35, Industrial Area,
P.O. Box: 24381, Doha,
STATE OF QATAR
This is a multi-site certificate, additional site(s) are listed on the next page(s)
Bureau Veritas Certification Holding SAS- UK Branch certifies that the Management System
of the above organisation has been audited and found to be in accordance with the
requirements of the management system standards detailed below
ISO 9001:2015
Scope of certification
certificate NoV 1822u1o Version: No. 1 Revision date: 29th June 2019
dt'(y,.r
Vinoth. K P- Certification Manager
Certification body address; 5'1' Floor, 66 Prescot Street, London E1 BHG, United Kingdom
Local office: G1-G3, Ground Floor, KG Building
(Bldg. No. 194, Street No. 230), C Ring Road,
~
Opposite Gulf Times, P. 0. Box: 22157,
(Doha) Qatar
UKAS
~r
....
Further clarifications regarding the scope of this certificate and the applicability of the management system
requirements may be obtained by consulting the organisation.
To check this certificate validity please call: +974 40329729
I/2
AL WATANIYA CONCRETE COMPANY L.L.
ISO 9001:2015
Scope of certification
Certificate No.IND 19.11822 U/Q Version: No. 1, Revision date: 291h June 2019
Certification body address: 5'1' Floor, 66 Prescot Street, London E1 8HG, United Kingdom
Local office: G1-G3, Ground Floor, KG Building
(Bldg. No. 194, Street No. 230), C Ring Road,
~
Opposite Gulf Times, P. 0 . Box: 22157,
(Doha) Qatar
UKAS
~VI
SlSTtM5
OJOI
Further clarifications regarding the scope of this certificate and the applicability of the management system
requirements may be obtained by consulting the organisation.
To check this certificate validity please call: +974 40329729
2/2
?!J(})(tijb>/d-e ({}/{/7{)?&Jrati,o4?/
Awarded to
at
~..____,.___ --"""'
...arfality Registrar Systems certify that the management system of the above
organization has been audited and found to be in compliance with the QRS
l~ quireme~ registration of the management system standard detailed
~ "\
~l; . ~ "-. below:
~
ISO 14001:2015
Environmental Management Systems
Scope of work
EA 16
Certificate No: AQQ-20111
Originally Registered: 15 JULY 2017
Latest Issue: 25 MAY 2019
Valid up-to: 14 JULY 2020
Quality Registrar Systems certify that the management system of the above
organization has been audited and found to be in compliance with the QRS
requirements for registration of the management system standard detailed
below:
OHSAS 18001:2007
Occupational Health and Safety Management Systems
Scope of work
EA 16
Certificate No: AQQ-30124
Originally Registered: 15 JULY 2017
Latest Issue: 25 MAY 2019
Valid up-to: 14JULY 2020
0(7+2'67$7(0(172)
:25.
I
0
AI Wataniya
P.O. Box 24381 Doha, Q<~tar I W\\'\v.watancon.com
Phone: ""974 4483 8751! Fax· +974 4483 2334
Integrated Management
System Procedure
Operational Planning
and Control
A~
Prepared by:
~5-
QMSOfftcer
Khaled AI Nuimat
Executive Manager
J
Document No. AWC-IMS-005
IMS Procedure
Revision No. 2
Table of Contents
Revision History................................................................................................................................. 3
Distribution List ................................................................................................................................. 4
1 Introduction .............................................................................................................................. 5
1.1 Purpose.............................................................................................................................. 5
1.2 Scope ................................................................................................................................. 5
2 Responsibilities .......................................................................................................................... 5
3 Terms and Definitions ................................................................................................................ 6
4 Procedure .................................................................................................................................. 7
5 Associated Documented Information ....................................................................................... 11
This document may not be copied, reproduced, stored in any form within a retrieval system or transmitted by any other means withou t the prior
permission of AWC QHSE-MR. Any printed version of this document is invalid unless stamped “CONTROLLED” in red.
Revision History
Section Change Rev Date
First issue based on the new requirements of ISO 9001:2015 and ISO
All 14001:2015; This supersedes AWC-IMS-P-06 Production and Quality 0 15 Aug 2016
Process Control_rev3 dated 10 Mar 2016
Removed the section on IMS objectives and integrated it in the IMS 1 19 Jun 2017
4 Manual; Updated reference procedures; Included controls for Health,
Safety and Environment (HSE)
This document may not be copied, reproduced, stored in any form within a retrieval system or transmitted by any other means withou t the prior
permission of AWC QHSE-MR. Any printed version of this document is invalid unless stamped “CONTROLLED” in red.
Document No. AWC-IMS-005
IMS Procedure
Revision No. 2
Distribution List
Serial
Document Holder Location
No.
1 General Manager Head Office
This document may not be copied, reproduced, stored in any form within a retrieval system or transmitted by any other means withou t the prior
permission of AWC QHSE-MR. Any printed version of this document is invalid unless stamped “CONTROLLED” in red.
Document No. AWC-IMS-005
IMS Procedure
Revision No. 2
1 Introduction
1.1 Purpose
To establish and define a documented plan for the production and delivery of ready-mixed concrete
and ensure that these processes are carried out under controlled conditions, in consideration of
applicable requirements for quality, health & safety, and environment
1.2 Scope
This procedure is applicable to all processes directly affecting the product and service quality, as well
as relevant support processes for product realization and fulfilment of customer, statutory,
regulatory, and other requirements.
2 Responsibilities
2.1 The Technical and Sales Manager shall be responsible for the set-up and implementation
of controls in the receipt and inspection of raw materials and the inspection of final
product prior to dispatch.
2.2 The Production Manager shall be responsible for the set-up and implementation of
controls during the actual batching process and in the transportation and delivery of
ready-mixed concrete.
2.3 The QHSE Manager shall be responsible for the set-up and implementation of controls
related to Health, Safety and Environment (HSE).
2.4 The HSE Officer shall be responsible for the verification of the effective implementation
of HSE controls and programs.
2.5 The Technician shall be responsible for the inspection of raw materials and final product.
2.6 The QA/QC Engineer shall be responsible for the disposition of final product.
2.7 The Laboratory Supervisor shall be responsible for the retention of documented
information related to raw materials inspection and product testing.
This document may not be copied, reproduced, stored in any form within a retrieval system or transmitted by any other means withou t the prior
permission of AWC QHSE-MR. Any printed version of this document is invalid unless stamped “CONTROLLED” in red.
Document No. AWC-IMS-005
IMS Procedure
Revision No. 2
Customer
Person or organization that could or does receive a product or a service that is intended for or
required by this person or organization
Hazard
Source, situation, or act with a potential harm in terms of human injury or ill health, or a
combination of these
Ill-health
Identifiable, adverse physical or mental condition arising from and /or made worse by a work activity
and/or work-related situation
Incident
Work-related event(s) in which an injury or ill health (regardless of severity) or fatality occurred or
could have occurred
Nonconformity
Non-fulfillment of a requirement
Performance
Measurable result
Quality
Degree to which a set of inherent characteristics of an object fulfills requirements
Regulatory requirement
Obligatory requirement specified by an authority mandated by a legislative body
Release
Permission to proceed to the next stage of a process or the next process
Requirement
Need or expectation that is stated, generally implied or obligatory
Review
Determination of the suitability, adequacy or effectiveness of an object to achieve established
objectives
This document may not be copied, reproduced, stored in any form within a retrieval system or transmitted by any other means withou t the prior
permission of AWC QHSE-MR. Any printed version of this document is invalid unless stamped “CONTROLLED” in red.
Document No. AWC-IMS-005
IMS Procedure
Revision No. 2
Risk
Effect of uncertainty
Specification
Document stating requirements
Statutory requirement
Obligatory requirement specified by a legislative body
Test
Determination according to requirements for a specific intended use or application
4 Procedure
4.1 Controls for Quality
4.1.1 The Technical and Sales Manager shall ensure that controls are in place for the receipt
and inspection of incoming materials. This is covered by AWC-IMS-011 Control of
Externally Provided Products and Services.
4.1.2 The QA/QC Engineer shall ensure that the specifications and acceptance criteria for the
final product (i.e. fresh concrete) are clearly defined and communicated with the
operations personnel.
4.1.3 In case of planned changes, i.e. updates in the customer requirements or amendment in
the contract, the QA/QC Engineer with the Technical and Sales Manager shall facilitate
the review of the changes in consideration of the organization’s capability to meet the
new requirements. Refer to AWC-IMS-006 Contract Management and AWC-IMS-021
Change Management.
4.1.4 The Production Secretary shall communicate the production schedule to relevant
personnel.
4.1.5 The Production Manager and the Technical and Sales Manager shall respectively
implement the controls for the actual batching process for concrete production and
delivery, and the inspection of the fresh concrete to ensure conformance to customer,
legal and other applicable requirements. These include the controls related to the risks
identified in AWC-IMS-008 Risk Management and logged in AWC-F-MR-16 Risk Register
for Quality Management System (QMS). Refer to Figure 1 Al Wataniya Process Flow
Chart for an overview of the processes with corresponding check points.
4.1.6 Once the batching process is complete, the Technician shall conduct the testing of fresh
concrete according to AWC-TE-QCTP-01 Quality Control Test Plan for Concrete and
Constituents. Where necessary, samples shall be taken and sent for third-party analysis.
This document may not be copied, reproduced, stored in any form within a retrieval system or transmitted by any other means withou t the prior
permission of AWC QHSE-MR. Any printed version of this document is invalid unless stamped “CONTROLLED” in red.
Document No. AWC-IMS-005
IMS Procedure
Revision No. 2
4.1.7 Should workability adjustment be applicable, the Technician, with the Laboratory
Supervisor’s or QA/QC Engineer’s advice, may re-temper the concrete by adding up to
1L/m3 of the same admixture.
4.1.8 Once the desired characteristics are attained, the test results shall be endorsed to the
QA/QC Engineer, who shall review the data against the customer specifications and
provide approval to release the concrete for dispatch to the designated site.
4.1.9 The Laboratory Supervisor or Technician shall retain documented information as
evidence of product conformity to the specified requirements.
4.1.10 In case of nonconformity, the product shall be handled according to AWC-IMS-012
Control of Nonconforming Products and Materials.
4.1.11 The Services Manager and Plant Maintenance Manager shall ensure that all plants,
equipment and vehicle necessary for the production and delivery of concrete are
properly maintained. Refer to AWC-IMS-014 Plant, Equipment and Vehicle Maintenance.
4.1.12 The Laboratory Supervisor shall ensure that all equipment used for the measurement
and testing of raw materials and final products are calibrated and maintained for
suitable use as outlined in AWC-IMS-010 Control of Measuring and Test Equipment.
This document may not be copied, reproduced, stored in any form within a retrieval system or transmitted by any other means withou t the prior
permission of AWC QHSE-MR. Any printed version of this document is invalid unless stamped “CONTROLLED” in red.
Document No. AWC-IMS-005
IMS Procedure
Revision No. 2
Receipt of Material
Materials from Transfer to
Material Allocation
tion /
Approved Storage Bins
Inspection ment
Assignment
Supplier and Silos
OPC Water
(Ordinary Portland (Chilled or Normal)
Cement)
GGBS
(Ground Central Ice
Granulated Blast Mixer (Flaked)
furnace Slag)
Fly Ash
Sampling and
Testing of Fresh
Dispatch to Site
Ready-Mix
Concrete
The concrete supply and delivery is planned according to customer demand. Only approved materials (aggregates, OPC, GGBS, micro-
silica, water, ice, and admixture) are used in the concrete batching process. The material inputs are sequenced as follow:
- Aggregates (10 mm Gabbro or Limestone, 20 mm Gabbro or Limestone, and Washed Sand): Weighed separately in a hopper scale
and conveyed into the central mixer
- Ice (flaked): Weighed and added into the conveyor
- OPC, GGBS, fly ash, and micro silica: Transferred from the cement silos through a screw conveyor installed at the bottom of the silos
and into a separate weighing scale, then dumped into the central mixer
- Water and admixture: Weighed separately then dumped into the central mixer through a pipe
Mixing is continued until the concrete properties (i.e. slump) are achieved, i.e. not less than 60-90 seconds from the time all ingredients
are in the mix. The freshly-mixed concrete are then dumped into the awaiting transit mixer. Once batching is completed, the loaded transit
mixers are sent to a checkpoint area where the concrete properties are verified prior to dispatch to end-user.
This document may not be copied, reproduced, stored in any form within a retrieval system or transmitted by any other means withou t the prior
permission of AWC QHSE-MR. Any printed version of this document is invalid unless stamped “CONTROLLED” in red.
Document No. AWC-IMS-005
IMS Procedure
Revision No. 2
This document may not be copied, reproduced, stored in any form within a retrieval system or transmitted by any other means withou t the prior
permission of AWC QHSE-MR. Any printed version of this document is invalid unless stamped “CONTROLLED” in red.
Document No. AWC-IMS-005
IMS Procedure
Revision No. 2
This document may not be copied, reproduced, stored in any form within a retrieval system or transmitted by any other means withou t the prior
permission of AWC QHSE-MR. Any printed version of this document is invalid unless stamped “CONTROLLED” in red.
~
Quality Control Test Plan Document No. AWC-TE-QCTP-01
I. Aggregates
Item Frequency (Internal) Reference Frequency (External)
Properties I Characteristics Standard Method
No. Coarse Fines Form Coarse Fines
1 Grading BS EN 933-1 Daily Daily AWC-F-TE..()S Monthly Monthly
2 Material finer than 63~-tm and 75~-tm BS EN 933· 1 Daily Dally AWC-F-TE..()S Monthly Monthly
II. Water
Item Reference
Properties I Characteristics Standard Method Frequency (Internal) Frequency (Externa l)
No. Form
Compressive Strength BS EN 196-1 Weekly
1 '
2 Setting Time BS EN 196-3 N/A Nii. Weekly
BS 6068· 1.37
3 Chloride (CI) Weekly
(IS09297)
4 Sulphates (S042') 85 EN 196· 2 N,A Nfi Weekly
BS 6068·2.51
Sa Alkali Carbonates & Bicarbonates A Weekly
BS EN 1509963·11 2
Sb Alkali Equivalent Sodium Oxides 85 EN 196-2 "',A "1/A Weekly
6 Total Dissolves Ions, including 3, 4, & 5 above BS 1377: Part 3 ~ --.;ti. Weekly
7 pH BS 6068-2.50 ..,A ~ Weekly
8 coo SM 5220 8 "'iA NA Weekly
SM 4500 P 8, C
9 Phosphate (PO/" - P) SM4500 PO by .., weekly
Subtraction
10 Nitrate (NO) -N) ISO 7890-1 '1/A -;w, Weekly
11 Lead (Pb2") SM 31258 {ICP/MS) "1/A "1 /A Weekly
12 Zinc (2n2') SM 31258 (ICP/MS) '17<\ ~ Weekly
IV. Admixture
Item Reference
Properties I Characteristics Standard Method Frequency (Internal) Frequency (External)
No. Form
1 Water Soluble Chloride Content 6S EN480·10 Each type I Every 6 months
3 Alkali Content of Admixtures BS EN 480 - 12 N/A '1/A Each type I Every 6 months
5 Specific Gravity ASTMC494 As per delivery AWC.f-TE-09 Each type I Every 6 months
V. OPC/ SRC
Item Reference
Properties I Characteristics Standard Method Frequency (Internal) Frequency (External)
No. Form
1 Compressive Strenght of Hydraulic Cement (Mortars) 6SEN 196 - 1 Monthly
VI. GGBFS
Item Reference
Properties I Characteristics Standard Method Frequency (Internal) Frequency (External)
No. Form
ASTMC989 Monthly
1 Physical Properties as per QCS 2014''
BS EN 15167-1
2 Chemical Properties as per QCS 2014 • • NiA Monthly
6S EN 15167·2
VII.PFA
Item Reference
Properties I Characteristics Standard Method Frequency (Internal) Frequency (External)
No . Form
ASTM C311, C618 Monthly
1 Physical Properties as per QCS 2014''
6S EN450
2 Chemical Properties as per QCS 2014 • • BS EN451 ~-- A Monthly
2 Chemical Properties as per QCS 2014' ' ASTM METHOD N/A N/A Monthly
Notes
'These rests ore carried our as moy be required based on projecr specijicotions or conrroct sllpulorlons.
• 'Where applicable, these tests ore carried ovr in addition ro regvlor tests specified In PoiT V OPC/SRC.
> All rest methods ondfreqvencies ore based on QCS 2014 Section 5 (Concrete) and Section 2 PoJT 14 (Qvolity Assvronce and Quality Control).
>All internal resrs ore performed by Lobo~ry Technicians, while thhLoboroto Ap;;~::~e in charge of sample preparation for exrernol tests.
CONTROLLED
AWC·TE·QCTP·01 Quality Control Test Plan rev. 7 1 Page 2 of2
&203$1<352),/($1'
27+(5'(7$,/6
KDWEzWZK&/>
PRE QUALIFICATION SUBMITTAL
P.O. Box: 24381 Doha – State of Qatar Tel. No:. +974 44838751 Fax. No:. +974 44832334 - Website: www.watancon.com
Item Table of Contents
5 Certificates of Recognition
6 Documentation Hierarchy
11 Current Projects
15 Appreciation Letters
i. Company Profile
Through an uncompromising approach to Quality and Services and with
unrivalled industry experience, Al Wataniya Concrete has become the leading
producer and supplier of Ready-Mixed Concrete and its related products in
Qatar.
The Company established in July of 2005; is a group of a very well Qualified and
Experienced Engineers and Professionals in the Ready-Mixed Industry. Al
Wataniya prides itself for being the first company in the market to acquire the
NRMCA Certification, in addition to QGSM (Qatar General Organization for
Standard and Metrology) Certification. Al Wataniya’s commitment to excellence
and quality is sustained and empowered by the dedication of its team-oriented,
high-qualified and long-experienced team of Engineers and Professionals, who
knowledgeably utilize their know how of the gulf market dynamics to deliver
efficiently and in a timely manner.
To this effect, Al-Wataniya Concrete has positioned itself strongly as one of the
leading producers and suppliers of ready mix concrete in Qatar. Al-Wataniya
currently operates its batching plants that are spread across the State of Qatar
to fulfill Qatar’s escalating demand to Good Concrete, by persistently optimizing
its Quality Control Program to deliver Durable and High performance Concrete
(HPC).
iii. Certification
The first in the market to achieve National Ready Mix Concrete Association
(NRMCA) accreditation in addition to quality and conformity certificate from
ministry of environment. The Company’s commitment to total quality
management has resulted in recent certification of the Quality Management
System ISO 9001:2015 and the organization is also certified to OHSAS
18001:2007, ISO 14001:2015, BES 6001 (BRE), and Gulf Green Mark
(GORD)
ii. Mission
Al Wataniya Concrete Mission is to manufacture, provide and deliver quality of
Ready-Mixed Concrete with innovative development and services to meet and
exceeds customer’s satisfaction in terms of service and quality for a long-term
profitability and continuity of the company.
3. AWC - IMS POLICY / QUALITY, HEALTH & SAFETY, and ENVIRONMENT
(QHSE) POLICY
4. AWC - COMPANY-WIDE ORGANIZATIONAL CHART
5. AWC - CERTIFICATES OF RECOGNITION
ISO 9001:2015 (QUALITY MANAGEMENT SYSTEM)
ISO 14001:2015 (Quality Management System)
OHSAS 18001:2007 (Occupational Health and Safety Management System)
Al Seer Plant No. I & II
AWC - NRMCA Certificate of Conformance for Concrete Production Facilities
Doha Ready Mix Plant No. I & II
Al Dayen-Smaisma Plant No. I & II
AWC - Quality & Conformity Certificates Doha Ready Mix Plant I & II
AWC - Quality & Conformity Certificates Al Seer Ready Mix Plant I & II
AWC - Quality & Conformity Certificates SMAISM AREA PLANT I & II
Environmental Product Declaration (EPD)
GORD – Gulf Organization for Research & Development
Computer Card (2020)
Company Registration 2020 (CR)
a.cli.o.Jig OJ~I OJijg
Mini:sb'y of Commerce ~Mt tndusuy
IMS LEVEL 1
MANUAL
PROCEDURES/ LEVEL 2
PROCESS DOCUMENTS
WORK INSTRUCTION/
METHOD STATEMENT/PROCESS LEVEL 3
FLOWCHART/DO'S & DON'TS POLICY
STANDARDS/FORMS/RECORDS LEVEL 4
7. RAW MATERIALS
a. Cementitious Materials
• OPC (Ordinary Portland Cement)
• SRC (Sulfate Resistant Cement)
• Micro silica
• PFA (Fly Ash)
• GGBS (Ground Granulated Blast Furnace Slag)
b. Aggregates and Sand
• Coarse Aggregate
¾ 20mm Gabbro, 20mm Limestone
¾ 10mm Gabbro, 10mm Limestone
• Fine Aggregates
¾ Washed Sand
c. Admixture
8. PLANT CALIBRATION CERTIFICATION
a. Weighing Scale
• Cement Scale ● Admixture Scale
• Ice Scale
• Silica Scale
• Water Scale
• Aggregate Scale
9. FLEET DETAILS / EQUIPMENT LIST
SUPPLY
No. PROJECTS CONSULTANT CONTRACTOR CLIENT
STARTED
1 Tower (A) Pearl Qatar Global Design Afrina The Land May-06
2 Tower (C) Pearl Qatar Global Design Afrina The Land May-06
3 Tower (D) Pearl Qatar Global Design Afrina The Land May-06
4 Tower (9a) Pearl Qatar The Land Al Arrab Cont. The Land Jul-06
5 Tower (9b) Pearl Qatar The Land Al Arrab Cont. The Land Jul-06
6 Tower (2b) Pearl Qatar The Land Al Arrab Cont. The Land Aug-06
7 Tower (2b) Pearl Qatar The Land Al Arrab Cont. The Land Aug-06
8 Shk. Saoud Bin Mohd.
Doha High Rise Building Dar Handasah China State Sep-06
Bin Ali Al-Thani
9 The State Mosque SMEC Contraco Al Diwan Al Amiri Aug-06
10 Al Merqab Tower RMJM Contraco H.E. Hamad Bin Khalifa Jul-06
11 Dubai Tower (400m) RMJM Al Jaber-Al Habtoor (JV) Sama Dubai Feb-06
12 Salwa International Road AWS Al Jaber Engineering Ashgal Nov-06
13 Al Alawi Tower A.E.B. JTC Alawi Real Estate May-06
14 Ministry of Awqaf Ashgal JTC Ashgal May-06
15 Al Khor Housing maunsell/eacom JTC Barwa May-06
16 QREIC Office Building KEO JTC Al Aqaria Jul-06
17 West Bay Infrastructure SMEC JTC Ashgal Aug-06
18 Tower 16A The Pearl Qatar The Land Simplex The Land Apr-07
19 Tower 10A The Pearl Qatar The Land Simplex The Land May-07
20 Al Noor Tower A.E.B. AL Madar Mr. Ali Mashadi Jan-07
21 Mr. Khlifa Abdullah Al
Building at C-Ring Road AL SADD AL Madar Feb-07
Khulaifi
22 Tower at West Bay 108 Adiljaida AL Madar Fahad Al-Thani Apr-07
23 Al Emadi Tower GHD CAT-MAN (JV) Mr. Mohammad Al Emadi Aug-06
24 STP KEO MAN QP, QF Jun-07
25 The Gate Development Halcrow MAN Al Salam Mar-07
26 AL Baker Tower JCB PCSI TASHEED May-07
27 SAHARA TOWER JCB PCSI TASHEED Sep-07
28 Parcel 14 Pearl Qatar JCB QACC Capital Investment Sep-07
29 Parcel 11 Pearl Qatar EHAF QACC First Qatar Real Estate Jun-07
30 Diplomatic Area Pumping E.B & Alami Ashgal QBC Ashgal Jul-07
31 Shk. Abdullah Khalid Al-
Station AKH Tower Syna Ramco Apr-07
Thani
32 7 School at Doha Ministry of
EHAF Ramco Ashgal Sep-07
Finance
33 Sidra Medical Center KEO MAN QF Oct-07
34 H.E. shk. Hamad Bin
Lagoon Plaza MZ and Partners Al Seal Feb-06
Jasim Bin Jaber Al-Thani
35 Al Majed Tower MZ and Partners Al Seal Mr. Hamad Al Majed Aug-07
SUPPLY
No. PROJECTS CONSULTANT CONTRACTOR CLIENT
STARTED
36 Aqar Real Estate Invest.
Al Aqar Tower MZ and Partners Al Seal Sep-06
& Dev.
37 H.E. shk. Hamad Bin
Al Palm Tower MZ and Partners Al Seal Oct-06
Jasim Bin Jaber Al-Thani
38 Al Seal Tower MZ and Partners Al Seal Mr. Mohammad Al Aqar Mar-06
39 53 Villas at Mesameer - Al Seal Aqar Real Estate Invest Feb-08
40 Residential Buildings - Al Emara Eslamiya - Oct-07
41 10 RGS - Al Darwish Engineering Ashgal Mar-07
42 10 Schools - Redco-Pearl NLC JC Ashgal Oct-07
43 Laffan Tower CICO Al Darwish Engineering - Oct-06
44 Interim Doha Convention
W.S. Atkins Amana Steel Barwa Oct-06
Center
45 IDC Plant Pearl Qatar Dar Handasah Mamco CAT Group Dec-06
46 Hotel EHAF Mamco Al Jaber Group Dec-06
47 Ramada Hotel Ext. W.S. Atkins JTC Ganim Al-Thani Holdings Jan-07
48 Shk.Sultan Bin Suhim Al-
Sultan Plaza Dara Eng'g Imperial Trading Jan-07
Thani
49 GTC/123/2008 Transmission
EFC Gulf Housing Kahraomaa Jan-07
(Seimens)
50 Package 7 EFC Gulf Housing Kahraomaa Feb-07
51 GTC/123/2008 Transmission
EFC Gulf Housing Kahraomaa Feb-07
(Seimens) Package 2,3,4
52 Al Madar Hotel - Econpile - Jan-08
53 Architectural
Beach Tower Commodore Golden planner Sep-07
Consulting grp.
54 Qatar University Roads Arab Architectural Boom Construction Qatar University Aug-07
55 Residential Buildings - Jassim Engineering - Feb-08
56 Al Ruwais Park - Al Noors Engineering - Aug-08
57 240 Villas - Athar Building - Jul-07
58 Grand Hyatt Hotel EHAS Al Majal Contracting - Aug-07
59 Al Balagh Trading &
Public Service Building AEB Ashgal Dec-06
Cont.
60 Al Jazeera Islamic Company CICO MAN ENT. - Aug-06
61 Ceremonia Court KEO MAN ENT. QP Aug-06
62 The Pearl Qatar Par Al Handasah Simplex UDC Sep-06
63 The Pearl Qatar Par Al Handasah Zublev Foundation UDC Nov-06
64 Residential Buildings - Ramco - Feb-07
65 The Pearl Qatar Par Al Handasah Ammico The Land May-06
66 Youhan Tower SYWA Arabian Forasd - Jun-08
67 Qatar Club Training Halls Arab Consulting JTC Qatar Club May-08
68 Qatar Tower 3BTG + 32 CEG Al Huda Engineering Saeed Bin Zaid Apr-09
69 Mohamad Zafeer Bin
Salwa Compound 57 Villas ACE Al Huda Engineering Feb-07
Ahmad
70 City Tower CEG Al Huda Engineering Mohamad Bin Zajeed Dec-06
SUPPLY
No. PROJECTS CONSULTANT CONTRACTOR CLIENT
STARTED
71 Building B+12 Assal Consulting Al Huda Engineering Shekha Husa Nov-06
72 Building B+G+7 Assal Consulting Al Huda Engineering Shekha Husa Nov-06
73 Building B+G+9 Assal Consulting Al Huda Engineering Shekha Husa Nov-06
74 Al Bidda Tower Hill Int'l. Higgs & Hill QACC (JV) Platinum Tower Dec-06
75 65 Villa at Markiya Gulf Design JTC Borouq Trdg. Co. May-07
76 Al Maha Sofitel Hotel KEO NIBRO Follath Bin Jasim Apr-07
77 Sheik Hamad Bin
Commercial Center M.Z. & Partners Ramco Mar-07
Mohmad Bin Al-Thani
78 Tower Pearl Qatar Par Al Handasah QACC UDC Apr-07
79 Sillhoute Tower CICO EL SEIF Mohamad Ajjaj Al Kubaifi Feb-07
80 Al Hitmi Tower - Arabian Forasol - Jan-07
81 Pearl Qatar Tower II PVCJACS SWISSBORING - Apr-07
82 Tower 1,2 KEO CDC AL SARDAN Mar-07
83 Power supply to high rise
AEB Gulf Housing Kahraomaa Aug-07
Bldg.
84 Al Saad Complex AEB Midmac Contracting Barwa Jul-07
85 George Town University KEO Midmac Contracting Qatar Petroleum Nov-08
86 Mohamed Abdulazez Al
Al Baker Towers James Cubitt C.R.C Dora Nov-08
Baker
87 Al Atiah office Tower Top Design C.R.C Dora - Jun-08
88 Panasonic Showroom James Cubitt C.R.C Dora - Jan-09
89 Yohan Tower SYNA Commodore Qatar - Jun-08
90 Car Parking (B+G) SWG KEO Commodore Qatar - Feb-09
91 Qatar University School of
The Arab Architect Amana Contracting Qatar University Jan-08
Business
92 Cooling Plant @ Barwa
- Amana Contracting Barwa Mar-09
District
93 Uniceramic Factory @ St.41
- Amana Contracting - Aug-08
Industrial Area
94 German Switch Gear - Amana Contracting - Mar-09
95 Multi Store Car Parking Boom General
C.E.G Ashgal Apr-08
(G+6F) Contractors
96 International Trdg.
UCV-Q Expansion Project KEO Qatar Petroleum Nov-08
Contg.
97 GTC/Substation @ Al lusail
- Gulf Contracting Kahramma Dec-08
area
98 Al Khore Housing Package 6 Munsil Acom I.T.C.C Al Eqaria Mar-09
99 Arwa Tower Diwan Al Habtoor Engineering Sheikh Faisal Al Thani Jun-09
100 Al Marmur Palace AEB Al Ali Projects - Jan-09
101 Al Mamura Complex - Al Ali Projects - Jan-09
102 Souq Waqif - Al Ali Projects - Feb-09
103 Residential Bldg.@ Bin
- Al Ali Projects - Jan-09
Umran
104 VB17 @ Pearl Qatar AEB Redco Construction - Mar-09
105 VB11 @ Pearl Qatar AEB Redco Construction - Mar-09
SUPPLY
No. PROJECTS CONSULTANT CONTRACTOR CLIENT
STARTED
106 Doha Convention Center Hyder International Ammico (Pilling) Qatar Diar Jun-08
107 Bilal Plaza GHD Harinsa Qatar - Oct-08
108 Al Muhana Trade Center - Extreme Pilling Dr. Najeb Al Nuaime Mar-08
109 Insha Contracting - Al Shamal Sport Ashgal Feb-08
110 Training Sport@Abu Hamour - Marbu Contracting Ashgal Jan-08
111 Res.Bldg (G+4F) @ Al saad Diwan Modern Construction Sheikh Faisal Al Thani Feb-09
112 Convention center ext. & link Joannou &
KEO Qatar Petroleum Apr-09
Bridge Paraskevaides
113 Heart Of Doha Phase 1A Burns Macdonalds Bauer International Doha Land Dec-09
114 Sheik Faisal Bin Qasim Al
Al Samiria Tower Diwan Al Imara Al Habtoor engineering Dec-09
Thani
115 North Site Central Plant
KEO Gulf contracting Qatar foundation Mar-10
CP3,CP6
116 QatarPower transmission Qatar general electric &
- Gulf contracting Mar-10
Phase 8 water co.
117 Qatar general electric &
RAF Water Plant - JEC 2008
water co.
118 EPIC Service @ Ras laffan QP JEC Qatar Petroleum Dec-09
119 Student housing male &
KEO Man enterprise Qatar Foundation Dec-09
female
120 Barwa Commercial Avenue Aecom JTC Barwa Real state Aug-09
121 Qatalum Qatalum JEC Qatalum Dec-08
122 Qatalum Qatalum Simplex Qatalum Dec-08
123 Central Plant CP 7 QP UNICORP Qatar Foundation 2010
124 South Site Utilities Tunnel QP Zublin international Qatar Foundation 2008
125 Student housing male & Joannou &
QP Qatar Foundation 2009
female Paraskevaides
126 Learning Center QP JTC Qatar Foundation 2009
127 North Site Infra. Priority QP Man Enterprise Qatar Foundation 2009
128 Heart of Doha Infra. 1A B&M Cat International Mesherab (Doha Land) 2009
129 Heart of Doha Infra. 1A B&M HBK Contracting Mesherab (Doha Land) 2009
130 Transmission main to Al
General Al Jaber Engineering Ashghal 2010
Rakhiya Farm
131 Refurbishing & upgrading
General Al Jaber Engineering Ashghal 2012
Phase 8
132 Boom general
Al Khor Park CEG Ashghal 2009
Contracting
133 Ramco trading
Regent Hotel KEO Al Ghanem Holding 2010
contracting
134 Ramco trading
Al Ghanem Apartment KEO Al Ghanem Holding 2010
contracting
135 Sheikh Hamad Bin Jasim
Nobu Restaurant DARA Terna Qatar 2009
(Prime ministry)
136 Construction &
Al Khor Complex AEB Al Khor & Al Dakhera 2010
Reconstruction Eng.
137 Al Lusail Infrastructure
AECOM Combined Group Co. AJARA 2009
Package 5
138 Umsaeeid Community Area QP Al Jaber Engineering QP 2008
139 EPIC of Wet Utilities Network
QP Al Jaber Engineering QP 2010
at RLC
140 Al Shemokh Twin Towers EHAF SEG Qatar Real State Service Group 2008
SUPPLY
No. PROJECTS CONSULTANT CONTRACTOR CLIENT
STARTED
141 Ministry of Interior CEG WCT BERHAD Private Engineering 2010
142 Refurbishment & upgrading for
PARSONS Al Jaber Engineering ASHGHAL 2010
various pumping stations Ph. 8
143 Customer and Technical Care - Amana Steel Q-Tel 2010
144 Duty free ware house facilities GHD Zublin International NDIA 2010
145 Security Complex at Al Wakra MMAA Al Madar Group Ministry of Municipal Affairs 2011
146 55 Villas at Al Rayyan - Al Madar Group - 2010
147 Office Building QAFCO Al Madar Group QAFCO 2010
148 Bojamhoor Trdg &
National Security Shield QDC NSS 2011
Contg.
149 Piazza Building at Lusail United Consultant Draieh-Damac Group DAMAC 2012
150 Qatar Steel Factory MN Dastur Navayuga Engineering Qatar Steel Factory 2011
151 Barwa Financial District KEO Bouygues-Midmac-Jec JV Barwa 2009
152 Supreme Education Council KEO Al Huda Engineering QP 2012
153 Multipurpose hall at al sadd sport Qatar Olympic
KEO AKTOR 2013
club pack.2-Main Bldg. Committee
154 Internal Security Force Camp at
KEO QD-SBG Construction ISF 2013
Duhail Package-07A
155 Northeast Underground Carpark
KEO Terna-Qatar QF 2012
at Qatar Foundation
156 Al Rayyan Shopping Mall KEO KCT HILL INTERNATIONAL 2013
157 Union residential tower westbay MZ KCT MZ 2014
158 White Square Tower MZ Ezdan Trdg. & Contg. - 2014
159 Souq Waqif Car Park KEO UCC PRIVATE ENG. OFFICE 2014
160 Viva bahriya tower2b pearl Qatar KHATIB & ALAMI UCC UDC 2015
161 Doha Express Way Package 12 F–
Ring Road
KEO CCC / TEYSEER ASHGAL 2013
162 Fire house–artist Inn Residence AEB UCC QATAR MUSEUM 2015
181 Souq Al Najadah Renovation Dar Al Handasah UCC PRIVATE ENG.OFFICE 2014
Corniche and Al Qassar Stations–
182 JACOBS Como Construction QATAR RAIL 2017
Redline
Umm Al Houl Power &
183 UMM Al Houl Water Project Mott MacDonald Gulf Contracting Co. 2016
KAHRAMAA
184 Jerry Al Samur Dorsch Qatar Infraroad trading Contg LLC MANATEQ 2016
Construction of CP07A-1C: Infraroad trading
185 Dorsch Qatar LUSAIL 2016
Infrastructure Contracting LLC
360 – District Cooling Plant 3 at
186 Dar Al Handasah JEC Al Jaber Engineering QATAR COOL 2014
West bay
380 – Retrofit/Modification Work
187 Dorsch Qatar JEC Al Jaber Engineering LUSAIL 2017
for Bridges
188 Transfer package CP01 Dorsch Qatar QDVC LUSAIL 2015
189 Lusail Infrastructure CP3A PARSONS SAMSUNG Qatari Diar 2013
190 CP5B Lusail Development DORSCH SAMSUNG Qatari Diar 2015
191 CP4 Lusail Development DORCH Midmac - Yuksel J.V Qatari Diar 2013
QIRP-Gold Line Underground – Louis Berger–Egis
192 ALYSJ JV Q-Rail 2015
East Package Rail JV
Roads & Infrastructure in Al
193 Hyder Consulting CGC Combined Group ASHGAL 2015
Khessa North
194 Umm Al Houl Water & Power Project Mott Macdonald Samsung / Hitachi UHP 2015
Construction of 4 Schools Around
195 AEB Amana Contracting ASHGHAL 2015
Doha
BP #15 design build of marina
196 MZ and Partners Ceinsa – JTC JV Qatari Diar 2014
yacht Club
Sub-contract Umm Al houl power
197 Mott MacDonald DYK Incorporated UMM AL HOUL 2016
& water Project
Horse owners Complex at Al Khor Al Jaber Trading Contracting
198 Dar Al Handasah QATAR OLYMPIC 2014
– Phase 2 LLC
New Access Road to UMM Birkah,
199 ASHGHAL Tadmur Contracting Trdg. ASHGHAL 2015
Al Khor
Holliday Inn Hotel 3B+G+M+7 @ Trans Oriental
200 AEB Man Enterprises 2014
Al Najma Establishment
201 Building at Air Port Al Saad Contracting PRIVATE 2015
Bypass from Rawdat Rashid to Um
AECOM Al Cat Contracting ASHGHAL
202 Garn–Pack 1 2015
1 Dev’p. of ISF camp at duhail Phase Works CPC 2 Dar Al handasah Aktor S.A JEC JV ISF
2 Louis Berger–Egis Samsung-OHL-QBC JV /
Doha Metro–Major Stations Q-Rail
Rail JV CCC Offshore
3 New Orbital Highway Truck Route Project AECOM Leighton-JEC JV ASHGAL
4 Construction of Mega reservoir PRPSS Hyder Consulting CCC - Teyseer KAHRAMAA
5 Musheireb Downtown Doha Proj-Phase 4 Louis Berger-Egis CCC - Teyseer MSHEIREB Property
6 Pipeline Project at various Location in Doha Hyder Consulting CAT - Boom JV KAHRAMAA
7 Pipeline for mega reservoir–umm birka ras laffan Hyder Consulting CAT – Boom JV KAHRAMAA
8 Al Jaber Trading Sheikh Abdullah
Mixed used development Project at Airport Road ECG
Contracting LLC Abdulrahma Althani
9 Improvement of Roads Surrounding Duhail ISF SALFO Al Jaber Makhlouf ASHGHAL
10 Lusail Marina Al Jaber Twin Tower Adnan Safarini Jefferson Contracting Co. AL JABER GROUP
11 Apartment Building at Fox Hills, Lusail Area Adnan Safarini Jefferson Contracting Co. AL JABER GROUP
12 Lusail LRT 2C2 – QDP – DEPOT Hill International QDVC QATAR RAIL
13 Lusail LRT 2C2 – QUG – Underground Hill International QDVC QATAR RAIL
Dara Engineering Sheikh Abdullah
14 Boulevard Mall (LB+B+G+M) Al Kharaitiyat SEG Qatar
Consultants Abdulrahma Althani
Diwan Al Emara SEG Contractor Group / Al
15 Hermas Development LUSAIL
Architects Kamal
16 Design Build of Infrastructure Roads Land ASTAD SACYR UCC JV MANATEQ
South Car Park, Kiosks and Landscaping Works INFRAROAD TRDG. & Qatar Musuem
17 ASTAD
(Design & Build) for national museum of Qatar CONTG. LLC Authority
Roads & Infrastructure South of Wukair QS036 –
18 PARSONS UCC – INFRAROAD JV ASGHAL
package1
Road Improvement of Immigration Interchange
19 PARSON UCC – INFRAROAD JV ASGHAL
Roundabout and 22nd February street - ASHGHAL
20 Construction of East Industrial Road Between Al
PARSONS TEKFEEN CONSTRUCTION ASHGHAL
Muntazah Street and West Corridor (P017 C2)
21 Supreme Committee
Stadium at Al-Thumaama AEB JEC-TEKFEN JV
for Delivery & Legacy
22 383-Strategic Food Security Facilities (SFSF) New
DORSCH JEC NEW PORT PROJECT
Port Project NPP0085
23 Constructuion of residential tower viva bhariya 8 UCC - URBACON CONTG. Assets Real State
LACASA
@ the Pearl CO Dev’t.
24 Qatar Musuem
Build & Fitout @ Museography @ Khalifa Staduim Luis-Berger Egis UCC- URBACON
Authority
25 James cubitt &
Construction of Pearl Showroom UCC-URBACON Unitede Development
partner
26 Design & Construction of Duhail Project ERGA Qatar UCC-URBACON Private
27 Doha Metro Green Line Hill International PORR-SBG-HBK JV Q-RAIL
28 387 – Al rayyan Staduim SC2022 Suppork works
Dar Al Handasah JEC - JABER ENG. ASHGHAL
pkg.6
29 386 – Development ISF Camp Duhail – Package
Dar Al Handasah JEC – JABER ENG. QPM – ISF
CPC14
30 384- Stormwater drainage works al khor express
KEO JEC – JABER ENG. ASHGHAL
way
31 ACS International School, Al Kheesa Campus CEG INT’L. AL JABER TRDG. AL JABER GROUP
32 Northcroft Middle BIN Al Sheikh
Design & Build of Bin Al Sheikh Towers - Doha AL JABER TRDG.
East LLC Holdings
33 Renovation of Somerset ECG AL JABER TRDG. Katara Hospitality
34 Supreme Committee
Education City Stadium Project ASTAD JPAC Join Venture
for Delivery & Legacy
35 A – Ring Road Project ITAL Boom Construction ASHGHAL
No. PROJECTS CONSULTANT CONTRACTOR CLIENT
Al Wataniya Concrete operates Three (3) commercial location plants around Qatar
State as follows.
1. Smaisma Plant
Located in Simaisima near at Al Khor High-way, for Lusail Palaces Project Consisted of two
(2) fully computerized plants with automatic control systems and provided with the latest
technology of electronics and data processing system. One (1) plant manufactured by
Command Alkon (Spectrum VI) - USA with a capacity of 270 m3 per hour and one (1)
manufactured by IMER (ORU) – Italy with a capacity 120m3 per hour. Total production for
the 2 plants is 390m3 per hour.
3. Messaieed Plant
Located in messaieed consist of two (2) fully-computerized plants with a fully automated
system, manufactured by (ORU-brand) – Italy. The branch holds a total production capacity
of 240 m³ per hour.
13. BATCHING PLANTS LOCATION MAP
~ ~~
~ [~
~
~
~~
~;
*~ ~l'r~ . . .a~..
~:
::
~ .......... ¥-<uU . . . ......, l:
x~ Oue 21· ~~. 2016
[~
8
~ ~ftfo LUS CP07AlC·UCC l£T-A\Y.OOOJS l!
~ ;:
~ At WATAM'YA 1:
~ l>o/1<~, Qc>f.., !!
~ [~
x PtOJtG• ll'lfr~\Niet u r• w~ •t w~ Cronlnc ~Sed l.IHM SowU> & ~cc - CP07A.1C l:
~
~ S..b~: ~CONW;a~;a f:~~
*~ ~atSH,
):~~
~ ~ ~ UCC.,..., '" •nt i' tN"' •t C1>7-A• JC lrtfr"a>vucture ' lor'u Crow,..~
at \Y.c:ll ;;
~ l\I!W•1 SoYct't. -~ •'OUid 14 -.-e to -r-t•nd our •ppreo.:~uon to .,-ou tor- t,_. egeJ...,.,. ur~ t.-sutts ~:
~ aci'U«Wd. so br. l'cw I.MC7S concnu. SI.IPpl~ 10 "'-~0-"'Cl li
~ v - NY!> cOft\l\t.,..t.y .._.. rtu." lftt' m~ ~ cha~ ...._..,........,. :anc~ ...,. IOo" l!
~ fo,_.., to~~~ thh f<>< 1N dur.otlol'> of liW rYo;C'Ct ~..., ~t'Ond l!
I~ ~
lf/\111 nel "-1J;arch, j!
I ;
* ~~
Ii i;
* ~~
I i
I ~
~ ~~
~ f~
~ ~~
~ f~
~ ~~
~ f~
~ ~~
~ f~
~ ~~
I ~~
~ 1•• •97.. u:tJ )). 4•x; n;,a 1 '•• •01• ·u:->,.:.-.e ll...,., '"'seumupo trx:•m:n !i
~ PO O'C'UI..a [)ojt <l•tH I - UfbolO" ..... (~ ;:
~ :.:~~:0 U. Ol ~~
X v~~u ~1
~~-·······························································~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~······························································~~~~~~~~~~~~
Afrina Trading & Contracting
Qatar University- Department of Civil & Agricultural Engineering
SAMSUNG C&T CORPORATION
16. OFFICE ADDRESS AND SALES KEY PERSONNEL
P.O Box: 24381 Doha – State of Qatar Tel.No.: +974 44838751 Fax No.: +974 44832334 AWC
official website: www.watancon.com
VALUES..
GOOD QUALITY..
DELIVERING EXCELLENCE..
TO MEET CUSTOMER SATISFACTION
IS OUR MAIN
PRIORITY!