MIDEAST DEVELOPMENT CONSTRUCTION

FIRE FIGHTING WORKS Main Consultant


INDUSTRIES CAR SERVICE CENTER PROJECT
Fire Consultant: ELGohary Consult M A CONSULTANTS

‫المستخلص السابق‬ ‫المستخلص الحالى‬ ‫المستخلص االجمالى‬


Item Description Qty Unit Rate Amount QTY UNIT RATE percentage % AMOUNT QTY UNIT RATE percentage % AMOUNT QTY UNIT RATE percentage % AMOUNT

L.E L.E L.E L.E L.E L.E L.E L.E


DIVISION 15
FIRE FIGHTING - -
FIRE PUPMS - -
- -
A Supply & installation and commissioning of black - -
seamless steel pipes (Sch. 40 ) , distribution piping - -
networks C/W all fittings , supports / hangers , sleeves , - -
painting & all coupling and adapters as per ASTM – A – - -
53-106 Sch.40 as shown on plans :- - -
Pipes Ø 4`` ( grooved). 190 m 418.0 79,420.0 186 m 418.0 85% 66,085.8 186 m 418.0 15% 11,662.2 186 m 418.0 100% 77,748.0
Pipes Ø 3`` ( grooved). 110 m 325.0 35,750.0 108 m 325.0 85% 29,835.0 108 m 325.0 15% 5,265.0 108 m 325.0 100% 35,100.0
Pipes Ø 2.5`` ( grooved). 45 m 270.0 12,150.0 48 m 270.0 85% 11,016.0 48 m 270.0 15% 1,944.0 48 m 270.0 100% 12,960.0
Pipes Ø 2`` 20 m 153.0 3,060.0 24 m 153.0 85% 3,121.2 24 m 153.0 15% 550.8 24 m 153.0 100% 3,672.0
Pipes Ø 1.5`` 55 m 118.0 6,490.0 126 m 118.0 85% 12,637.8 126 m 118.0 15% 2,230.2 126 m 118.0 100% 14,868.0
Pipes Ø 1.25`` 350 m 105.0 36,750.0 348 m 105.0 85% 31,059.0 348 m 105.0 15% 5,481.0 348 m 105.0 100% 36,540.0
Pipes Ø 1`` 300 m 88.0 26,400.0 300 m 88.0 75% 19,800.0 300 m 88.0 25% 6,600.0 300 m 88.0 100% 26,400.0
Pipes Ø 1``(‫) تــــم تـــورـيدهم اــلىاــلموقعـ‬ 240 m 88.0 75% 15,840.0 240 m 88.0 25% 5,280.0 240 m 88.0 100% 21,120.0
- -
Install only - -
B install zone control station includes os&y - -
with tamper switch, check valve, flow switch, - -
test and drain with sight glass UL/FM . - - 2 Item 500 100% 1,000.0 2 Item 500 100% 1,000.0
-Z.C.S. 3in. 2 Item 500.0 1,000.0 1 Item 700 100% 700.0 1 Item 700 100% 700.0
-Z.C.S. 4in. 1 Item 700.0 700.0
- -
Install only - -
C install fire hose cabinet FHC ( BAVARIA) or - -
approved equal C/W:- - -
3`` ball valve (isolating) (300psi)UL/FM. - -
Hose reel assembly (swing type). - -
2.5`` angle fire hydrant.(300psi) Moris Type. - -
Hose 2.5`` x 30m long with coupling. - -
Multipurpose nozzle 2.5``. - -
Pressure gauge. - -
ABCD fire extinguishers dry powder 6kg. - -
Steel cabinet. 1 No. 780.0 780.0
- -

- -
- -
Install only - -
D install fire hose reel FHR ( BAVARIA) or - -
approved equal C/W:- - -
1” ball isolating-300psi UL/FM. - -
Hose reel assembly (swing type). - -
Hose 1” × 30m long with coupling. - -
Multipurpose nozzle 1 in. - -
1” pressure reducer valve UL/FM. - -
Pressure gauge. - -
ABCD fire extinguishers dry powder 6kg. - -
Steel cabinet. 5 No. 645.0 3,225.0 6 NO 645 90% 3483 6 NO 645 10% 387 6 NO 645 100% 3870
- -
Install only - -
E install concealed pendent sprinkler - -
head, quick response, 175psi, k=5.6, 68 oC, chrome- - -
Enloy, UL/FM. 185 No. 23.0 4,255.0 185 No. 23 100% 4255 185 No. 23 100% 4255
Install only - -
F install upright sprinkler head, brass, 175psi, - -
k=5.6, 68 oC, UL/FM for parking areasand 79 oC for - -
for mechanical rooms 10 No. 23.0 230.0 10 No. 23 100% 230 10 No. 23 100% 230
Install only - -
G install extended coverage horizontal - -
side wall sprinkler head with gaurd, - -
quick response, 175psi, k=8.1, 68 oC, UL/FM. 2 No. 23.0 46.0 2 No. 23 100% 46 2 No. 23 100% 46
- -
- -
‫اعمال اضافية‬ - -
‫فك شبكة الحريق الموجودة بالميزنين ذو اقطار مختلفة‬ - - 1 ‫مقطوعية‬ 1500 100% 1500 1 ‫مقطوعية‬ 1500 100% 1500
‫ خط حريق وتعديل مكانهم بناء على تعليمات مهندس جورج‬2 ‫فك وتركيب عدد‬ - - 1 ‫مقطوعية‬ 1000 100% 1000 1 ‫مقطوعية‬ 1000 100% 1000
‫اعادة استخدام وتركيب شبكة المواسير القديمة التى تم فكها من الميزنين‬ - - 1 ‫مقطوعية‬ 1000 100% 4000 1 ‫مقطوعية‬ 4000 100% 4000
‫فك صندوق حريق بالدور االول واعادة تركيبه وفك المواسير الخاصة بة وكذلك فك‬
‫خط رئيسى من الشبكة العمومية وذلك فى الدر االول بناء على تعليمات مهندس‬
‫محمد طة وذلك بسبب تكبير حجرة السريفر وبالتالى طلب مننا فك جميع المواسير‬
‫داخل الحجرة واعادة تركيبها خارج الحجرة‬ - - 1 ‫مقطوعية‬ 4000 100% 4000 1 ‫مقطوعية‬ 4000 100% 4000
- -
- -
DEVISION 15 FIRE FIGHTING 7,756.00
Total L.E 210,256.00 203,377.8 45,631.2 249,009.0

Bills of Quantities - Rev - 02 DEVISION 15 - FIRE FIGHTING