Professional Documents
Culture Documents
Willmar Schwabe
Group of Companies
System Specification [PP] [Production Execution Process] Code: PP05
(Process) Version: 001
[SAP] Date: 09.02.2015
Page: 1 of 13
Filing Original:
Distribution List: No Distribution
Approval
Function Name Date Signature Function Name Date Signature
Author Nanhe Babu Mr.Unnikrishnan
This document contains proprietary material and is released by a company of Dr. Willmar Schwabe Group of Companies on a confidential basis. It may not - even in part - be copied, published or forwarded to third parties - including authorities - without
express permission. Dr. Willmar Schwabe GmbH & Co. KG, Karlsruhe, is authorized to exercise and enforce all rights pertaining to this document.
Dr. Willmar Schwabe
Group of Companies
System Specification [PP] [Production Execution Process] Code: PP05
(Process) Version: 001
[SAP] Date: 09.02.2015
Page: 2 of 13
Table of Contents
1 Process Assessment...............................................................................................................................................................................................3
2 Glossary..................................................................................................................................................................................................................3
4 Process Description................................................................................................................................................................................................6
This document contains proprietary material and is released by a company of Dr. Willmar Schwabe Group of Companies on a confidential basis. It may not - even in part - be copied, published or forwarded to third parties - including authorities - without
express permission. Dr. Willmar Schwabe GmbH & Co. KG, Karlsruhe, is authorized to exercise and enforce all rights pertaining to this document.
Dr. Willmar Schwabe
Group of Companies
System Specification [PP] [Production Execution Process] Code: PP05
(Process) Version: 001
[SAP] Date: 09.02.2015
Page: 3 of 13
1 Process Assessment
2 Glossary
This document contains proprietary material and is released by a company of Dr. Willmar Schwabe Group of Companies on a confidential basis. It may not - even in part - be copied, published or forwarded to third parties - including authorities - without
express permission. Dr. Willmar Schwabe GmbH & Co. KG, Karlsruhe, is authorized to exercise and enforce all rights pertaining to this document.
Dr. Willmar Schwabe
Group of Companies
System Specification [PP] [Production Execution Process] Code: PP05
(Process) Version: 001
[SAP] Date: 09.02.2015
Page: 4 of 13
This document contains proprietary material and is released by a company of Dr. Willmar Schwabe Group of Companies on a confidential basis. It may not - even in part - be copied, published or forwarded to third parties - including authorities - without
express permission. Dr. Willmar Schwabe GmbH & Co. KG, Karlsruhe, is authorized to exercise and enforce all rights pertaining to this document.
Dr. Willmar Schwabe
Group of Companies
System Specification [PP] [Production Execution Process] Code: PP05
(Process) Version: 001
[SAP] Date: 09.02.2015
Page: 5 of 13
This document contains proprietary material and is released by a company of Dr. Willmar Schwabe Group of Companies on a confidential basis. It may not - even in part - be copied, published or forwarded to third parties - including authorities - without
express permission. Dr. Willmar Schwabe GmbH & Co. KG, Karlsruhe, is authorized to exercise and enforce all rights pertaining to this document.
Dr. Willmar Schwabe
Group of Companies
System Specification [PP] [Production Execution Process] Code: PP05
(Process) Version: 001
[SAP] Date: 09.02.2015
Page: 6 of 13
4 Process Description
4.1 Triggering Process / Requirements
Production Execution process is triggered from Material Requirements Planning however in some cases manual process order will be created. For finished and
semi-finished products; Process order will be created by converting planned order to process order. In case of reprocessing; Manual process orders will be
created.
RPN
Cat.
bility / Record to SSF Consequence (C)
1. Create Process Process Orders will be created either from MRP gen- Production in COR1 / F: Wrong data entry / 2 3 2 12 A Very criti-
Order erated Planned Orders or manually for the Semi-fin- charge / Planning in COR7 selection. cal
ished or Finished Product to be Produced. charge C: Not Manufactured as
per production plan.
No. Process Step Description Room / Responsi- T-Code Reference Possible Failure (F) / D O I RA
RPN
Cat.
bility / Record to SSF Consequence (C)
This document contains proprietary material and is released by a company of Dr. Willmar Schwabe Group of Companies on a confidential basis. It may not - even in part - be copied, published or forwarded to third parties - including authorities - without
express permission. Dr. Willmar Schwabe GmbH & Co. KG, Karlsruhe, is authorized to exercise and enforce all rights pertaining to this document.
Dr. Willmar Schwabe
Group of Companies
System Specification [PP] [Production Execution Process] Code: PP05
(Process) Version: 001
[SAP] Date: 09.02.2015
Page: 8 of 13
No. Process Step Description Room / Responsi- T-Code Reference Possible Failure (F) / D O I RA
RPN
Cat.
bility / Record to SSF Consequence (C)
Batch Number :
Batch Number will be automatically generated at the time
of Process Order Release. Manufacturing date, Expiry
date & MRP will be calculated at the time of Process Or-
der Release and Excise Batch Number will be entered
manually at the time of Label printing and Excise Batch
number will be automatically flown to the batch classifica-
tion.
o Bulk Batch (MT) :
Batch Number will be automatically generated at the time
of Process Order Release. Manufacturing date & Expiry
date & MRP will be automatically captured during
process order. Alcohol % , Excise Batch Number and Ag-
ing completion date will be entered manually after Goods
Receipt is done against Process.
No. Process Step Description Room / Responsi- T-Code Reference Possible Failure (F) / D O I RA
RPN
Cat.
bility / Record to SSF Consequence (C)
o Reprocessing batch :
Reprocessing is done for the product for Ex-
port Products. In this case Original Batch
number and other batch classification de-
tails remain same. In label printing of repro-
cessed products additional text is printed.
3. Print Process Or- Specialties , Tables , Bulk MT, Semi finished & Production in COR2/ ZSSF_PP01 F: Wrong Order is 1 1 1 1 C Not Criti-
der Sorted Herbs : charge / Planning in COPI/ printed. cal
Process Order and pick list will be printed after release. charge ZPP01 C: Not as per plan
Printout layout details are mentioned in the SSF template
Cumulative Process Order Print : Dilution , MT Filling COR2/ ZSSF_PP02
and LM : COPI/
Cumulative Process Order List will be printed after re- ZPP02
lease.
Printout layout details are mentioned in the SSF template
5. Print Pick List Cumulative Process Order Print : Dilution , MT Filling Production in COR2/ ZSSF_PP03 F: Wrong Order is 1 1 1 1 C Not Criti-
and LM : charge / Planning in COPI/ printed. cal
Pick list will be printed after process order release charge ZPP03 C: Not as per plan
Cumulative process order will be printed for calculat-
ing Total Alcohol qty required for the day.
Printout layout details are mentioned in the SSF tem-
plate.
This document contains proprietary material and is released by a company of Dr. Willmar Schwabe Group of Companies on a confidential basis. It may not - even in part - be copied, published or forwarded to third parties - including authorities - without
express permission. Dr. Willmar Schwabe GmbH & Co. KG, Karlsruhe, is authorized to exercise and enforce all rights pertaining to this document.
Dr. Willmar Schwabe
Group of Companies
System Specification [PP] [Production Execution Process] Code: PP05
(Process) Version: 001
[SAP] Date: 09.02.2015
Page: 10 of 13
No. Process Step Description Room / Responsi- T-Code Reference Possible Failure (F) / D O I RA
RPN
Cat.
bility / Record to SSF Consequence (C)
6. Print Master Master sticker label will be printed for Liquid products. Production in ZPP04 ZSSF_PP04 F: Wrong Master label 1 1 1 1 C Not Criti-
Sticker Label. charge / Planning in is printed. cal
charge C: Not as per plan
7. Create Stock Stock transfer reservation will be created for transferring Production in MF60 F: Wrong Master label 1 1 1 1 C Not Criti-
Transfer Reserva- BOM items from Store to production location charge is printed. cal
tion C: Not as per plan
8. Post Stock trans- BOM items will be transferred to production location w.r.t Store in charge MB1B/ F: Wrong batch trans- 2 1 2 4 C not critical
fer from Store to transfer reservation LT03/ ferred
production loca- MF65 C: FIFO not followed.
tion.
9. Post Goods Issue Goods can be issued manually with reference to process
(Manually)-Op- order however this step is option since goods (BOM
tional items) will be consumed (backflushed) during process or-
der confirmation. This process can be used in two sce-
narios i) Extra Material Issue ii) Issue of Non Backflush
items.
No. Process Step Description Room / Responsi- T-Code Reference Possible Failure (F) / D O I RA
RPN
Cat.
bility / Record to SSF Consequence (C)
This document contains proprietary material and is released by a company of Dr. Willmar Schwabe Group of Companies on a confidential basis. It may not - even in part - be copied, published or forwarded to third parties - including authorities - without
express permission. Dr. Willmar Schwabe GmbH & Co. KG, Karlsruhe, is authorized to exercise and enforce all rights pertaining to this document.
Dr. Willmar Schwabe
Group of Companies
System Specification [PP] [Production Execution Process] Code: PP05
(Process) Version: 001
[SAP] Date: 09.02.2015
Page: 12 of 13
No. Process Step Description Room / Responsi- T-Code Reference Possible Failure (F) / D O I RA
RPN
Cat.
bility / Record to SSF Consequence (C)
19. Print Manufactur- Manufacturing record will be printed for Dilution , LM , Production supervi- ZPP06 ZSSF_PP06 F: 0 0 0 0 - Not GxP
ing Record and MT filling sor / in charge C: Relevant
Printout layout details are mentioned in the SSF template
20. QA after Goods Quality Inspection lot is created if GR after production is Will be mapped in QA32
receipt activated for the product and stock is moved to Quality QM
stock after final process order confirmation. This process
is applicable for Finished Product only.
21. Generate Transfer For finished Goods, transfer request will be generated in Production supervi- ZPP07 ZSSF_PP07 F: Wrong Transfer Re- 1 1 1 1 C Not Criti-
request system for transferring stock from production location to sor / in charge quest created cal
Finished goods warehouse location. C: Not as per plan
Details of Transaction are given in SSF template.
22. Print Transfer Re- Stock Transfer request will be printed and will be handed Production supervi- ZPP08 ZSSF_PP08 F: Wrong Stock Trans- 1 1 1 1 C Not Criti-
quest over to store person for acknowledging the receipt of sor / in charge fer Request printed. cal
This document contains proprietary material and is released by a company of Dr. Willmar Schwabe Group of Companies on a confidential basis. It may not - even in part - be copied, published or forwarded to third parties - including authorities - without
express permission. Dr. Willmar Schwabe GmbH & Co. KG, Karlsruhe, is authorized to exercise and enforce all rights pertaining to this document.
Dr. Willmar Schwabe
Group of Companies
System Specification [PP] [Production Execution Process] Code: PP05
(Process) Version: 001
[SAP] Date: 09.02.2015
Page: 13 of 13
No. Process Step Description Room / Responsi- T-Code Reference Possible Failure (F) / D O I RA
RPN
Cat.
bility / Record to SSF Consequence (C)
This document contains proprietary material and is released by a company of Dr. Willmar Schwabe Group of Companies on a confidential basis. It may not - even in part - be copied, published or forwarded to third parties - including authorities - without
express permission. Dr. Willmar Schwabe GmbH & Co. KG, Karlsruhe, is authorized to exercise and enforce all rights pertaining to this document.