SPCI-SFTEJV-CP101-T-21-0066
5F King's Court Building 1, 2129 Chino Roces Ave., Makati City Proj. Code 290549
Tel. No. (02) 8112981 Fax No. (02) 8112985 Date: September 9, 2021
FOR:
Approval Issue`as Construction Drawings
Signature/Action & Return For Reference / Information
Review & Comments Others:
DOCUMENT TYPE:
Drawings Specification Contracts
Prints/Copies Manual Others: RFI
Report Programme
Material/Samples Proposal
Please confirm receipt of the material listed below by completing and returning a copy of the Transmittal/Approval Form to the Issuer
List of Documents / Drawings
DOC NO./DRAWING NO. DOCUMENT TITLE REVISION QTY. UNIT MEDIA
MMSP-SPCI-101-PRI-RFI-A-001 Request for Information - Discrepancy in the Pre-forcon dwg 0 7 pages SET PDF
ここにテキストを入力
MEDIA:
ISSUED BY: RECEIVED BY: D = Diskette
08 Sep 2021 P = Paper Print
ISAO YOKOBORI MICHELLE ZANTUA R = Reproductive Print
For & In behalf of Shimizu Philippine Contractors, Inc. Signature Over Printed Name T = Tape
C = CD Rom
O = Others
STATUS GIVEN: COMMENTS/REMARKS:
APPROVED
APPROVED W/ COMMENTS
REVISE AND RESUBMIT
REVIEW NOT REQUIRED
発行日
To : Shigeto Gomi September 7, 2021
(Issued on)
返却希望日
Thru: Mihara Ichiro September 10, 2021
(To be returned on)
Cc: SHINSUKE KAICHI / ISAO YOKOBORI
—In case of There is False ceiling, please give us the end detail at Building edge.
2.Pressurized smoke discharge system requires skim coat inside AD shaft or not. (MMSP-SFTEJV-101-PRI-DWG-A-220003)
4.Behind Vertical Louver also can be changed to RC wall instead of ACP with SS frame? (MMSP-SFTEJV-101-PRI-DWG-A-300031)
Sign
Chk/Appr REF REF CHK APPR APPR APPR APPR APPR APPR
Sign
Date
Remarks(Question,Information,Others)
please see attached