You are on page 1of 8

SHIMIZU PHILIPPINE CONTRACTORS INC. Ref. No.

SPCI-SFTEJV-CP101-T-21-0066

5F King's Court Building 1, 2129 Chino Roces Ave., Makati City Proj. Code 290549
Tel. No. (02) 8112981 Fax No. (02) 8112985 Date: September 9, 2021

DOCUMENT TRANSMITTAL / APPROVAL FORM


To : SHIGETO GOMI Project Name : METRO MANILA SUBWAY
Attn : KIYOSHI MIMURA Response Date : September 16, 2021
From : SHINSUKE KAICHI / ISAO YOKOBORI
Subject : RFI - FOR ARCHITECTURAL

FOR:
Approval Issue`as Construction Drawings
Signature/Action & Return For Reference / Information
Review & Comments Others:

DOCUMENT TYPE:
Drawings Specification Contracts
Prints/Copies Manual Others: RFI
Report Programme
Material/Samples Proposal

Please confirm receipt of the material listed below by completing and returning a copy of the Transmittal/Approval Form to the Issuer
List of Documents / Drawings
DOC NO./DRAWING NO. DOCUMENT TITLE REVISION QTY. UNIT MEDIA
MMSP-SPCI-101-PRI-RFI-A-001 Request for Information - Discrepancy in the Pre-forcon dwg 0 7 pages SET PDF

ここにテキストを入力

MEDIA:
ISSUED BY: RECEIVED BY: D = Diskette
08 Sep 2021 P = Paper Print
ISAO YOKOBORI MICHELLE ZANTUA R = Reproductive Print
For & In behalf of Shimizu Philippine Contractors, Inc. Signature Over Printed Name T = Tape
C = CD Rom
O = Others
STATUS GIVEN: COMMENTS/REMARKS:
APPROVED
APPROVED W/ COMMENTS
REVISE AND RESUBMIT
REVIEW NOT REQUIRED

SIGNATURE OVER PRINTED NAME:


CLIENT/OWNER CONSULTANT SPCI MANAGER SPCI ENGINEER Sub-contractor

Date: Date: Date: Date: Date:

SPCI-ADM-FRM-005 Rev.00 (2016.11.15)


TITLE: Ref. No. MMSP-SPCI-101-PRI-RFI-A-001

Page No. Page 1 of 7


REQUEST FOR INFORMATION (RFI)

設計番号・プロジェクト名(Project Name) "MMSP-PRI"

発行日
To : Shigeto Gomi September 7, 2021
(Issued on)
返却希望日
Thru: Mihara Ichiro September 10, 2021
(To be returned on)
Cc: SHINSUKE KAICHI / ISAO YOKOBORI

Area: MMSP-DEPOT-PRI BUILDING


Query: Please confirm below discrepancy and my queries in the Pre-forcon dwg
1.Whether there is False ceiling above Train track.
(MMSP-SFTEJV-101-PRI-DWG-A-230003 and MMSP-SFTEJV-101-PRI-DWG-A-250001)
—In case of No False ceiling , what is True ceiling finish?

—In case of There is False ceiling, please give us the end detail at Building edge.

2.Pressurized smoke discharge system requires skim coat inside AD shaft or not. (MMSP-SFTEJV-101-PRI-DWG-A-220003)

3.What is F12 finishing at Lower Roof? (MMSP-SFTEJV-101-PRI-DWG-A-300028)

4.Behind Vertical Louver also can be changed to RC wall instead of ACP with SS frame? (MMSP-SFTEJV-101-PRI-DWG-A-300031)

5.Staircase floor finish is granite. Can change to Tile carpet? (MMSP-SFTEJV-101-PRI-DWG-A-320002)

6. Roof Crown Louver : Provide Skysign fixing detail (MMSP-SFTEJV-101-PRI-DWG-A-900037)

Discipline/s which are required to review this document.


(A) (S) (M) (E) (P) Others

Construction M&E QAQC Planning / Engineering

(PD) (PM/PIC) (Mngr/Engr) (Mngr/Engr) (Mngr/SV) (Engr) DC


S. Kaichi R. Delacruz F. Quitain Y. Shibazaki R. Guia W.Manalang
I.Yokobori

iss/chk APPR APPR CHK CHK CHK ISS ISS

Sign

Date Sep 8, 2021 08-Sep-2021 07-Sep-2021


ISS (Issuer) CHK (Check by) REF (Reference only) APPR (Approved by)

Client Designer In-Charge

(PD) (CM) (PM) (A) (S) (M) (E) (P) (FP)

Chk/Appr REF REF CHK APPR APPR APPR APPR APPR APPR

Sign

Date

Remarks(Question,Information,Others)
please see attached

SPCI-ENG-FRM-001 Rev. 02 (2021.07.12)