Professional Documents
Culture Documents
P U R E F I B E R T E C H N O L O G Y
ICT CONSTRUCTION INC.
AS-BUILT PLAN
PRINTED NAME & SIGNATURE DATE PRINTED NAME & SIGNATURE DATE
POSITION POSITION
FTTB SYMBOLS:
N4 NAP (1x4) Riser FOC
ABBREVIATIONS:
FOC - Fiber Optic Cable
LCP - Local Convergence Point
NAP - Network Access Point
ODF - Optical Distribution Frame
OLT - Optical Line Terminal
FDB - Fiber Distribution Box
CONTRACTOR:
Date:
Surveyed/Designed by : KLENT ENOLBA
NETWORK DESIGNER
Date:
Checked by : JEFFERSON OCAYO
ENGINEERING AND DESIGN HEAD
Date:
Noted by : RAYMUND JAMES LEGARIO
PROJECT MANAGER
Date:
Recommended by : HOEMING WONG
COUNTRY MANAGER
PROJECT TITLE
Revision Date
A B C
D E F
G H I
OWNER/PROPONENT:
VICINITY MAP
P U R E F I B E R T E C H N O L O G Y
OWNER/PROPONENT:
METRO WORKS
ICT CONSTRUCTION INC.
UNIT 401, CEBU HOLDINGS CENTER, CARDINAL ROSALES AVE, CEBU
BUSSINES PARK, CEBU CITY
Date:
Checked/ Recommending
Approval by :
OSP Planning & Engineering Head
Date:
Approved by:
Engineering Head
02
GENERAL NOTES:
-ALL ELECTRICAL INSTALLATION WORKS HEREIN SHALL BE DONE IN ACCORDANCE WITH THE LATEST OF
1.
2.
SECURE ALL NECCESSARY PERMIT AT ALL CONCERNED AGENCY.
WORK SHALL CONFIRM WITH TELECOMMUNICATION STANDARS & BUILDING OR
OWNER REQUIREMENTS.
FTTB SYMBOLS:
PHILIPPINE ELECTRICAL CODE, THE RULES AND REGULATIONS OF THE LOCAL MUNICIPALITY AND POWER
UTILITY COMPANY. 3. PERFORM ACTUAL SITE STAKING PRIOR TO MATERAIL REQUISITION & CONSTRUCTION OCCURE.
4. ALL WORKS SHALL FOLLOW THE STANDARDS. N4 NAP (1x4) Riser FOC
WIRING METHOD: 5. SITE INSTRUCTION WILL BE FOLLOW ENGINEER/OWNER AT SITE DISCRETION & APPROVAL.
N8 NAP (1x8) Traditional FOC
-INTERMEDIATTE METAL CONDUIT (IMC) OR RIGID STEEL CONDUIT, WHICH EVER AS REQUIRED BY THE Drop FOC
1. CONVERGE TO INSTALLED 24C DROP FOC POI (AERIAL) FROM CLOSURE/LCP UPLINK GOING TO N16 NAP (2x8)
BUILDING ADMIN. SHALL BE USED FOR ELECTRICAL SERVICE AND ALL EXPOSED PORTION.
POLYVINYL CHLORIDE (PVC) PIPE SHALL BE USED FOR UNDERGROUND INSTALLATION. OLT CABINET LOCATION OF BUILDING. JB Junction Box
L4 LCP (1x4)
INSULATED WIRE FOR GROUNDING. 2. CONVERGE TO INSTALLED OLT CABINET ON MDF ROOM AT BASEMENT-1 PARKING AREA.
3. CONVERGE TO INSTALLED 24C RISER CABLE FOC FROM TOWER 1&2 FIRST LCP/NAP TO NAP AT AUX. ROOM. L8 LCP (1x8) MH Manhole
-ALL EQUIPMENT AND MATERIALS SHALL BE BRAND NEW AND SUITED TO THE REQUIRED USED. 4. CONVERGE TO INSTALLED LCP/NAP BOX INSIDE PULLBOX 16"x16"x8.5" AT AUX. ROOM ON TOWER 1&2.
ALL ELECTRICAL WORKS SHALL BE DONE UNDER THE SUPERVISION OF A DULY LICENSED REGISTERED 5. CONVERGE TO USE EXISTING BUILDING FACILITIES /CABLE TRAY/2"Ø IMC PIPE/TAPPING POINT. Z Access Terminal Box HH Handhole
ELECTRICAL ENGINEER. 6. CONVERGE TO PERFORM SPLICING & TESTING OF FOC INSIDE THE BUILDING.
Riser Conduit SB Service Box
-MINIMIUM WIRE INSTALLED SHALL BE 3.5sq.mm TYPE THHN/THWN, UNLESS OTHERWISE AS INDICATED.
Fiber Splicing Enclosure
PROTECTIVE GROUNDING - GREEN/YELLOW WITH GREEN STRIPES OR GREEN.
LINE, SINGLE PHASE - RED, YELLOW, BLUE AND BLACK. 1. COORDINATE WITH THE BUILDING ADMINISTRATION FOR THE POSSIBLE CHANGES LOCATION OF EQUIPMENT
NEUTRAL - WHITE. ABBREVIATIONS:
FOR THE SAFETY OF EXISTING CABLE.
FOC - Fiber Optic Cable
-ALL CIRCUIT BREAKERS SHALL BE SCHNEIDER OR G.E BRAND. BOLT ON TYPE IN NEMA 3R ENCLOSURE FOR LCP - Local Convergence Point
OUTDOOR LOCATION AND NEMA 1 FOR INDOOR LOCATIONS. NAP - Network Access Point
CIRCUIT BREAKERS FOR ECB AND MAIN ACPDB SHALL BE INDUTRIAL TYPE 22KAIC,. WHILE BRANCH ODF - Optical Distribution Frame
CIRCUIT BREAKERS SHALL BE COMMERCIAL TYPE 10 KAIC. OLT - Optical Line Terminal
FDB - Fiber Distribution Box
INSULATION TEST SHALL BE DONE BEFORE THE SITE IS ENERGIZED AND WITHNESSED BY THE PMI/FE.
RESISTANCE SHALL BE GREATER THAN FIVE(5) MEGAOHMS.
PULL BOX/JUNCTION BOX SHALL BE PROVIDED IF NECCESSARY EVEN IF THESE ARE NOT INDICATED IN THE
PLANS.
MOUNTING HEIGHT:
-PANELBOARDS(ACPBDB)/ECB - 1.4M FROM THE FINISH FLOOR LINE UP TO MIDDLE OF THE ENCLOSURE. CONTRACTOR:
SWITCHES - 1.4M FROM THE FINISH FLOOR LINE UP TO MIDLLE OF THE DEVICE.
CONVENIENCE OUTLETS - 0.3M FROM THE FINISH FLOOR LINE UP TO BOTTOM OF THE DEVICE.
KILOWATT-HOUR METER- 1.65M - 1.80M FROM THE FINISH FLOOR LINE UP TO MIDDLE OF THE METER BASE.
Date:
Surveyed/Designed by : KLENT ENOLBA
NETWORK DESIGNER
Date:
Checked by : JEFFERSON OCAYO
ENGINEERING AND DESIGN HEAD
Date:
TOP VIEW
INSTALLED OLT CABINET 1200x650x250mm ZTE Revision Date
A B C
2.50M
OWNER/PROPONENT:
OWNER/PROPONENT:
INSTALLED 2"Ø PVC PIPE w/ TOX & SCREW
METRO WORKS
ICT CONSTRUCTION INC.
UNIT 401, CEBU HOLDINGS CENTER, CARDINAL ROSALES AVE, CEBU
BUSSINES PARK, CEBU CITY
0M
3.0
Date:
Checked/ Recommending
2.5 Approval by :
OSP Planning & Engineering Head
0M
ISOMETRIC VIEW
Engineering Head
MDF ROOM AT GROUND FLOOR PARKING AREA Work Order No. Sheet Content Sheet No.
03
1. SECURE ALL NECCESSARY PERMIT AT ALL CONCERNED AGENCY.
FTTB SYMBOLS:
2. WORK SHALL CONFIRM WITH TELECOMMUNICATION STANDARS & BUILDING OR
OWNER REQUIREMENTS.
N4 NAP (1x4) Riser FOC
3. PERFORM ACTUAL SITE STAKING PRIOR TO MATERAIL REQUISITION & CONSTRUCTION OCCURE.
4. ALL WORKS SHALL FOLLOW THE STANDARDS. N8 NAP (1x8) Traditional FOC
5. SITE INSTRUCTION WILL BE FOLLOW ENGINEER/OWNER AT SITE DISCRETION & APPROVAL.
N16 NAP (2x8) Drop FOC
1. CONVERGE TO INSTALLED 24C DROP FOC POI (AERIAL) FROM CLOSURE/LCP UPLINK GOING TO L4 LCP (1x4) JB Junction Box
OLT CABINET LOCATION OF BUILDING.
L8 LCP (1x8) MH Manhole
2. CONVERGE TO INSTALLED OLT CABINET ON MDF ROOM AT BASEMENT-1 PARKING AREA.
3. CONVERGE TO INSTALLED 24C RISER CABLE FOC FROM TOWER 1&2 FIRST LCP/NAP TO NAP AT AUX. ROOM. Handhole
Z Access Terminal Box HH
4. CONVERGE TO INSTALLED LCP/NAP BOX INSIDE PULLBOX 16"x16"x8.5" AT AUX. ROOM ON TOWER 1&2.
5. CONVERGE TO USE EXISTING BUILDING FACILITIES /CABLE TRAY/2"Ø IMC PIPE/TAPPING POINT. Riser Conduit SB Service Box
6. CONVERGE TO PERFORM SPLICING & TESTING OF FOC INSIDE THE BUILDING.
Fiber Splicing Enclosure
ABBREVIATIONS:
EE. ROOM B 1. COORDINATE WITH THE BUILDING ADMINISTRATION FOR THE POSSIBLE CHANGES LOCATION OF EQUIPMENT FOC - Fiber Optic Cable
FOR THE SAFETY OF EXISTING CABLE. LCP - Local Convergence Point
NAP - Network Access Point
ODF - Optical Distribution Frame
OLT - Optical Line Terminal
FDB - Fiber Distribution Box
Date:
Surveyed/Designed by : KLENT ENOLBA
40000
P U R E F I B E R T E C H N O L O G Y
EXISTING PORTHOLE
SEE ACTUAL PICTURE FOR UNIT 401, CEBU HOLDINGS CENTER, CARDINAL ROSALES AVE, CEBU
SEE ACTUAL PICTURE FOR BUSSINES PARK, CEBU CITY
INSTALLED POWER TAPPING POINT LAY-OUT INSTALLATION INSTALLED EQUIPMENT FOR EASILY IDENTIFICATION.
Checked/ Recommending
Approval by :
OSP Planning & Engineering Head
Date:
Approved by:
04
FTTB SYMBOLS:
N4 NAP (1x4) Riser FOC
ABBREVIATIONS:
FOC - Fiber Optic Cable
LCP - Local Convergence Point
NAP - Network Access Point
ODF - Optical Distribution Frame
OLT - Optical Line Terminal
FDB - Fiber Distribution Box
CONTRACTOR:
D E F
G H I
MEC 002
OWNER/PROPONENT:
P U R E F I B E R T E C H N O L O G Y
OWNER/PROPONENT:
METRO WORKS
ICT CONSTRUCTION INC.
UNIT 401, CEBU HOLDINGS CENTER, CARDINAL ROSALES AVE, CEBU
BUSSINES PARK, CEBU CITY
Date:
Approved by:
Engineering Head
05
FTTB SYMBOLS:
N4 NAP (1x4) Riser FOC
ABBREVIATIONS:
FOC - Fiber Optic Cable
LCP - Local Convergence Point
NAP - Network Access Point
ODF - Optical Distribution Frame
OLT - Optical Line Terminal
FDB - Fiber Distribution Box
CONTRACTOR:
Date:
Surveyed/Designed by : KLENT ENOLBA
NETWORK DESIGNER
Date:
Checked by : JEFFERSON OCAYO
ENGINEERING AND DESIGN HEAD
Date:
Noted by : RAYMUND JAMES LEGARIO
PROJECT MANAGER
Date:
Recommended by : HOEMING WONG
COUNTRY MANAGER
PROJECT TITLE
Revision Date
A B C
D E F
G H I
OWNER/PROPONENT:
P U R E F I B E R T E C H N O L O G Y
OWNER/PROPONENT:
METRO WORKS
ICT CONSTRUCTION INC.
LOAD SCHEDULE UNIT 401, CEBU HOLDINGS CENTER, CARDINAL ROSALES AVE, CEBU
BUSSINES PARK, CEBU CITY
Date:
Approved by:
Engineering Head
06
FTTB SYMBOLS:
WASHER EXPSION SLEEVES
N4 NAP (1x4) Riser FOC
EXPANSION BOLT
N8 NAP (1x8) Traditional FOC
mm
6 50 L8 LCP (1x8) MH Manhole
1200mm
EXPANSION BOLT WITH
EXPANSION SLEEVES
EXPANSION SLEEVES
RECTIFIER
ODF PORT
Revision Date
1200mm
1200mm
A B C
D E F
G H I
DC PDU
OWNER/PROPONENT:
P U R E F I B E R T E C H N O L O G Y
OWNER/PROPONENT:
Date:
Checked/ Recommending
Approval by :
OSP Planning & Engineering Head
Date:
Approved by:
Engineering Head
07