METRO WORKS ASPENCOM TECH INC.

P U R E F I B E R T E C H N O L O G Y
ICT CONSTRUCTION INC.

CONVERGE (INSTALLATION OLT CABINET)


PROJECT FOR
AMAIA STEPS NORTH TOWER
PLARIDEL ST., MANDAUE CITY CEBU
10.339310, 123.955430

AS-BUILT PLAN

BUILDING ADMIN APPROVAL: METROWORKS P&E APPROVAL:

PRINTED NAME & SIGNATURE DATE PRINTED NAME & SIGNATURE DATE

POSITION POSITION
FTTB SYMBOLS:
N4 NAP (1x4) Riser FOC

N8 NAP (1x8) Traditional FOC

N16 NAP (2x8) Drop FOC

L4 LCP (1x4) JB Junction Box

L8 LCP (1x8) MH Manhole

Z Access Terminal Box HH Handhole

Riser Conduit SB Service Box

Fiber Splicing Enclosure

ABBREVIATIONS:
FOC - Fiber Optic Cable
LCP - Local Convergence Point
NAP - Network Access Point
ODF - Optical Distribution Frame
OLT - Optical Line Terminal
FDB - Fiber Distribution Box

CONTRACTOR:

ASPENCOM TECH INC.

Date:
Surveyed/Designed by : KLENT ENOLBA
NETWORK DESIGNER
Date:
Checked by : JEFFERSON OCAYO
ENGINEERING AND DESIGN HEAD
Date:
Noted by : RAYMUND JAMES LEGARIO
PROJECT MANAGER
Date:
Recommended by : HOEMING WONG
COUNTRY MANAGER

PROJECT TITLE

AMAIA STEPS NORTH TOWER


PLARIDEL ST., MANDAUE CITY CEBU

Revision Date
A B C

D E F

G H I

OWNER/PROPONENT:

VICINITY MAP
P U R E F I B E R T E C H N O L O G Y

UNIT 401, CEBU HOLDINGS CENTER, CARDINAL ROSALES AVE, CEBU


BUSSINES PARK, CEBU CITY

OWNER/PROPONENT:

METRO WORKS
ICT CONSTRUCTION INC.
UNIT 401, CEBU HOLDINGS CENTER, CARDINAL ROSALES AVE, CEBU
BUSSINES PARK, CEBU CITY

Date:
Checked/ Recommending
Approval by :
OSP Planning & Engineering Head

Date:
Approved by:
Engineering Head

Work Order No. Sheet Content Sheet No.

02
GENERAL NOTES:

-ALL ELECTRICAL INSTALLATION WORKS HEREIN SHALL BE DONE IN ACCORDANCE WITH THE LATEST OF
1.
2.
SECURE ALL NECCESSARY PERMIT AT ALL CONCERNED AGENCY.
WORK SHALL CONFIRM WITH TELECOMMUNICATION STANDARS & BUILDING OR
OWNER REQUIREMENTS.
FTTB SYMBOLS:
PHILIPPINE ELECTRICAL CODE, THE RULES AND REGULATIONS OF THE LOCAL MUNICIPALITY AND POWER
UTILITY COMPANY. 3. PERFORM ACTUAL SITE STAKING PRIOR TO MATERAIL REQUISITION & CONSTRUCTION OCCURE.
4. ALL WORKS SHALL FOLLOW THE STANDARDS. N4 NAP (1x4) Riser FOC
WIRING METHOD: 5. SITE INSTRUCTION WILL BE FOLLOW ENGINEER/OWNER AT SITE DISCRETION & APPROVAL.
N8 NAP (1x8) Traditional FOC
-INTERMEDIATTE METAL CONDUIT (IMC) OR RIGID STEEL CONDUIT, WHICH EVER AS REQUIRED BY THE Drop FOC
1. CONVERGE TO INSTALLED 24C DROP FOC POI (AERIAL) FROM CLOSURE/LCP UPLINK GOING TO N16 NAP (2x8)
BUILDING ADMIN. SHALL BE USED FOR ELECTRICAL SERVICE AND ALL EXPOSED PORTION.
POLYVINYL CHLORIDE (PVC) PIPE SHALL BE USED FOR UNDERGROUND INSTALLATION. OLT CABINET LOCATION OF BUILDING. JB Junction Box
L4 LCP (1x4)
INSULATED WIRE FOR GROUNDING. 2. CONVERGE TO INSTALLED OLT CABINET ON MDF ROOM AT BASEMENT-1 PARKING AREA.
3. CONVERGE TO INSTALLED 24C RISER CABLE FOC FROM TOWER 1&2 FIRST LCP/NAP TO NAP AT AUX. ROOM. L8 LCP (1x8) MH Manhole
-ALL EQUIPMENT AND MATERIALS SHALL BE BRAND NEW AND SUITED TO THE REQUIRED USED. 4. CONVERGE TO INSTALLED LCP/NAP BOX INSIDE PULLBOX 16"x16"x8.5" AT AUX. ROOM ON TOWER 1&2.
ALL ELECTRICAL WORKS SHALL BE DONE UNDER THE SUPERVISION OF A DULY LICENSED REGISTERED 5. CONVERGE TO USE EXISTING BUILDING FACILITIES /CABLE TRAY/2"Ø IMC PIPE/TAPPING POINT. Z Access Terminal Box HH Handhole
ELECTRICAL ENGINEER. 6. CONVERGE TO PERFORM SPLICING & TESTING OF FOC INSIDE THE BUILDING.
Riser Conduit SB Service Box
-MINIMIUM WIRE INSTALLED SHALL BE 3.5sq.mm TYPE THHN/THWN, UNLESS OTHERWISE AS INDICATED.
Fiber Splicing Enclosure
PROTECTIVE GROUNDING - GREEN/YELLOW WITH GREEN STRIPES OR GREEN.
LINE, SINGLE PHASE - RED, YELLOW, BLUE AND BLACK. 1. COORDINATE WITH THE BUILDING ADMINISTRATION FOR THE POSSIBLE CHANGES LOCATION OF EQUIPMENT
NEUTRAL - WHITE. ABBREVIATIONS:
FOR THE SAFETY OF EXISTING CABLE.
FOC - Fiber Optic Cable
-ALL CIRCUIT BREAKERS SHALL BE SCHNEIDER OR G.E BRAND. BOLT ON TYPE IN NEMA 3R ENCLOSURE FOR LCP - Local Convergence Point
OUTDOOR LOCATION AND NEMA 1 FOR INDOOR LOCATIONS. NAP - Network Access Point
CIRCUIT BREAKERS FOR ECB AND MAIN ACPDB SHALL BE INDUTRIAL TYPE 22KAIC,. WHILE BRANCH ODF - Optical Distribution Frame
CIRCUIT BREAKERS SHALL BE COMMERCIAL TYPE 10 KAIC. OLT - Optical Line Terminal
FDB - Fiber Distribution Box
INSULATION TEST SHALL BE DONE BEFORE THE SITE IS ENERGIZED AND WITHNESSED BY THE PMI/FE.
RESISTANCE SHALL BE GREATER THAN FIVE(5) MEGAOHMS.
PULL BOX/JUNCTION BOX SHALL BE PROVIDED IF NECCESSARY EVEN IF THESE ARE NOT INDICATED IN THE
PLANS.

MOUNTING HEIGHT:

-PANELBOARDS(ACPBDB)/ECB - 1.4M FROM THE FINISH FLOOR LINE UP TO MIDDLE OF THE ENCLOSURE. CONTRACTOR:
SWITCHES - 1.4M FROM THE FINISH FLOOR LINE UP TO MIDLLE OF THE DEVICE.
CONVENIENCE OUTLETS - 0.3M FROM THE FINISH FLOOR LINE UP TO BOTTOM OF THE DEVICE.
KILOWATT-HOUR METER- 1.65M - 1.80M FROM THE FINISH FLOOR LINE UP TO MIDDLE OF THE METER BASE.

3.00M ASPENCOM TECH INC.

Date:
Surveyed/Designed by : KLENT ENOLBA
NETWORK DESIGNER
Date:
Checked by : JEFFERSON OCAYO
ENGINEERING AND DESIGN HEAD
Date:

INSTALLED OLT CABINET Noted by : RAYMUND JAMES LEGARIO


PROJECT MANAGER
2.50M

1200x650x250mm ZTE SEE ACTUAL PICTURE FOR HOEMING WONG


Date:
Recommended by :
COUNTRY MANAGER
LOCATION OF INSTALLED OLT
INSTALLED SUB-METER & BREAKER CABINET ZTE & SUB-METER /BREAKER PROJECT TITLE
AT TELCO ROOM
EXISTING PORTHOLE
AMAIA STEPS NORTH TOWER
PLARIDEL ST., MANDAUE CITY CEBU

TOP VIEW
INSTALLED OLT CABINET 1200x650x250mm ZTE Revision Date
A B C

INSTALLED SUB-METER DIGITAL G.E BRAND D E F

INSTALLED 30A BREAKER w/ PANEL BOX NEMA G H I


CLOSURE G.E BRAND
INSTALLED 1"Ø IMC PIPE w/ TOX & SCREW

2.50M
OWNER/PROPONENT:

INSTALLED PULLBOX 8"x8"x4.5" w/ TOX & SCREW


EXISTING PORTHOLE
P U R E F I B E R T E C H N O L O G Y

UNIT 401, CEBU HOLDINGS CENTER, CARDINAL ROSALES AVE, CEBU


BUSSINES PARK, CEBU CITY

OWNER/PROPONENT:
INSTALLED 2"Ø PVC PIPE w/ TOX & SCREW
METRO WORKS
ICT CONSTRUCTION INC.
UNIT 401, CEBU HOLDINGS CENTER, CARDINAL ROSALES AVE, CEBU
BUSSINES PARK, CEBU CITY
0M
3.0
Date:
Checked/ Recommending
2.5 Approval by :
OSP Planning & Engineering Head
0M

INSTALLED OLT CABINET INSTALLATION ON Approved by:


Date:

ISOMETRIC VIEW
Engineering Head

MDF ROOM AT GROUND FLOOR PARKING AREA Work Order No. Sheet Content Sheet No.

03
1. SECURE ALL NECCESSARY PERMIT AT ALL CONCERNED AGENCY.
FTTB SYMBOLS:
2. WORK SHALL CONFIRM WITH TELECOMMUNICATION STANDARS & BUILDING OR
OWNER REQUIREMENTS.
N4 NAP (1x4) Riser FOC
3. PERFORM ACTUAL SITE STAKING PRIOR TO MATERAIL REQUISITION & CONSTRUCTION OCCURE.
4. ALL WORKS SHALL FOLLOW THE STANDARDS. N8 NAP (1x8) Traditional FOC
5. SITE INSTRUCTION WILL BE FOLLOW ENGINEER/OWNER AT SITE DISCRETION & APPROVAL.
N16 NAP (2x8) Drop FOC

1. CONVERGE TO INSTALLED 24C DROP FOC POI (AERIAL) FROM CLOSURE/LCP UPLINK GOING TO L4 LCP (1x4) JB Junction Box
OLT CABINET LOCATION OF BUILDING.
L8 LCP (1x8) MH Manhole
2. CONVERGE TO INSTALLED OLT CABINET ON MDF ROOM AT BASEMENT-1 PARKING AREA.
3. CONVERGE TO INSTALLED 24C RISER CABLE FOC FROM TOWER 1&2 FIRST LCP/NAP TO NAP AT AUX. ROOM. Handhole
Z Access Terminal Box HH
4. CONVERGE TO INSTALLED LCP/NAP BOX INSIDE PULLBOX 16"x16"x8.5" AT AUX. ROOM ON TOWER 1&2.
5. CONVERGE TO USE EXISTING BUILDING FACILITIES /CABLE TRAY/2"Ø IMC PIPE/TAPPING POINT. Riser Conduit SB Service Box
6. CONVERGE TO PERFORM SPLICING & TESTING OF FOC INSIDE THE BUILDING.
Fiber Splicing Enclosure

ABBREVIATIONS:
EE. ROOM B 1. COORDINATE WITH THE BUILDING ADMINISTRATION FOR THE POSSIBLE CHANGES LOCATION OF EQUIPMENT FOC - Fiber Optic Cable
FOR THE SAFETY OF EXISTING CABLE. LCP - Local Convergence Point
NAP - Network Access Point
ODF - Optical Distribution Frame
OLT - Optical Line Terminal
FDB - Fiber Distribution Box

INSTALLED SUB-METER DIGITAL G.E BRAND


CONTRACTOR:
INSTALLED 30A BREAKER w/ PANEL BOX
NEMA CLOSURE G.E BRAND
INSTALLED 1"Ø IMC PIPE w/ TOX & SCREW ASPENCOM TECH INC.

Date:
Surveyed/Designed by : KLENT ENOLBA
40000

INSTALLED PULLBOX 8"x8"x4.5" NETWORK DESIGNER


Date:
Checked by : JEFFERSON OCAYO
ENGINEERING AND DESIGN HEAD
Date:
RAYMUND JAMES LEGARIO
EXISTING PORTHOLE Noted by :
PROJECT MANAGER
Date:
Recommended by : HOEMING WONG
COUNTRY MANAGER
SEE ACTUAL PICTURE FOR
LOCATION OF INSTALLED PULLBOX PROJECT TITLE
PLDT ROOM and SUB-METER ON AMAIA STEPS
A CALL-OUT "A-2"
MDF ROOM
AMAIA STEPS NORTH TOWER
PLARIDEL ST., MANDAUE CITY CEBU
GLOBE ROOM

EXISTING POWER TAPPING POINT Revision Date


A B C

INSTALLED OLT CABINET D E F


1200x650x250mm ZTE
INSTALLED PULLBOX 8"x8"x4.5" G H I
INSTALLED 1"Ø IMC PIPE w/ TOX & SCREW
OWNER/PROPONENT:

INSTALLED 2"Ø PVC PIPE INSIDE


INSTALLED 24C DROP FOC INSTALLED 30A BREAKER

P U R E F I B E R T E C H N O L O G Y
EXISTING PORTHOLE
SEE ACTUAL PICTURE FOR UNIT 401, CEBU HOLDINGS CENTER, CARDINAL ROSALES AVE, CEBU
SEE ACTUAL PICTURE FOR BUSSINES PARK, CEBU CITY

LOCATION OF EXISTING TAPPING


LOCATION OF INSTALLED OLT
POINT INSIDE INSTALLED 30A OWNER/PROPONENT:
CABINET ON AMAIA STEPS
BREAKERS ON AMAIA STEPS
CALL-OUT "A-1"
CALL-OUT "B" METRO WORKS
ICT CONSTRUCTION INC.
NOTE: UNIT 401, CEBU HOLDINGS CENTER, CARDINAL ROSALES AVE, CEBU
BUSSINES PARK, CEBU CITY
- SEE RISER DIAGRAM FOR WITH LCP/NAP LOCATION.
- CONVERGE WILL PUT A CONVERGE STICKER FOR THEIR Date:

INSTALLED POWER TAPPING POINT LAY-OUT INSTALLATION INSTALLED EQUIPMENT FOR EASILY IDENTIFICATION.
Checked/ Recommending
Approval by :
OSP Planning & Engineering Head

Date:
Approved by:

FROM COMMON MDF ROOM TO EE. ROOM Work Order No.


Engineering Head

Sheet Content Sheet No.

04
FTTB SYMBOLS:
N4 NAP (1x4) Riser FOC

N8 NAP (1x8) Traditional FOC

N16 NAP (2x8) Drop FOC

L4 LCP (1x4) JB Junction Box

L8 LCP (1x8) MH Manhole

Z Access Terminal Box HH Handhole

Riser Conduit SB Service Box

Fiber Splicing Enclosure

ABBREVIATIONS:
FOC - Fiber Optic Cable
LCP - Local Convergence Point
NAP - Network Access Point
ODF - Optical Distribution Frame
OLT - Optical Line Terminal
FDB - Fiber Distribution Box

CONTRACTOR:

ASPENCOM TECH INC.


MEC002-LCP139 @ 9th FLOOR_EE. RM L 8

MEC002-LCP138 @ 5th FLOOR_EE. RM L 8


Date:
MEC002-LCP137 @ 2nd FLOOR_EE. RM L 8 Surveyed/Designed by : KLENT ENOLBA
NETWORK DESIGNER
Date:
Checked by : JEFFERSON OCAYO
ENGINEERING AND DESIGN HEAD
Date:
Noted by : RAYMUND JAMES LEGARIO
PROJECT MANAGER
Date:
Recommended by : HOEMING WONG
24F ODF#2 COUNTRY MANAGER

FOR RISER PROJECT TITLE

SEE ACTUAL PICTURE


GOING TO OLT INSTALLED ZTE OLT CABINET
UPLINK PORTS AMAIA STEPS NORTH TOWER
PLARIDEL ST., MANDAUE CITY CEBU
24F ODF#1
FOR POI
Revision Date
A B C

D E F

G H I
MEC 002

OWNER/PROPONENT:

INSTALLED 24C TRADITIONAL FOC

P U R E F I B E R T E C H N O L O G Y

UNIT 401, CEBU HOLDINGS CENTER, CARDINAL ROSALES AVE, CEBU


GF PARKING BUSSINES PARK, CEBU CITY

OWNER/PROPONENT:

METRO WORKS
ICT CONSTRUCTION INC.
UNIT 401, CEBU HOLDINGS CENTER, CARDINAL ROSALES AVE, CEBU
BUSSINES PARK, CEBU CITY

ODF PORT ASSIGNMENT Checked/ Recommending


Approval by :
OSP Planning & Engineering Head
Date:

Date:
Approved by:
Engineering Head

Work Order No. Sheet Content Sheet No.

05
FTTB SYMBOLS:
N4 NAP (1x4) Riser FOC

N8 NAP (1x8) Traditional FOC

N16 NAP (2x8) Drop FOC

L4 LCP (1x4) JB Junction Box

L8 LCP (1x8) MH Manhole

Z Access Terminal Box HH Handhole

Riser Conduit SB Service Box

Fiber Splicing Enclosure

ABBREVIATIONS:
FOC - Fiber Optic Cable
LCP - Local Convergence Point
NAP - Network Access Point
ODF - Optical Distribution Frame
OLT - Optical Line Terminal
FDB - Fiber Distribution Box

CONTRACTOR:

ASPENCOM TECH INC.

Date:
Surveyed/Designed by : KLENT ENOLBA
NETWORK DESIGNER
Date:
Checked by : JEFFERSON OCAYO
ENGINEERING AND DESIGN HEAD
Date:
Noted by : RAYMUND JAMES LEGARIO
PROJECT MANAGER
Date:
Recommended by : HOEMING WONG
COUNTRY MANAGER

PROJECT TITLE

AMAIA STEPS NORTH TOWER


PLARIDEL ST., MANDAUE CITY CEBU

Revision Date
A B C

D E F

G H I

OWNER/PROPONENT:

P U R E F I B E R T E C H N O L O G Y

UNIT 401, CEBU HOLDINGS CENTER, CARDINAL ROSALES AVE, CEBU


BUSSINES PARK, CEBU CITY

OWNER/PROPONENT:

METRO WORKS
ICT CONSTRUCTION INC.
LOAD SCHEDULE UNIT 401, CEBU HOLDINGS CENTER, CARDINAL ROSALES AVE, CEBU
BUSSINES PARK, CEBU CITY

SCALE NTS Checked/ Recommending


Date:
Approval by :
OSP Planning & Engineering Head

Date:
Approved by:
Engineering Head

Work Order No. Sheet Content Sheet No.

06
FTTB SYMBOLS:
WASHER EXPSION SLEEVES
N4 NAP (1x4) Riser FOC
EXPANSION BOLT
N8 NAP (1x8) Traditional FOC

N16 NAP (2x8) Drop FOC

L4 LCP (1x4) JB Junction Box

mm
6 50 L8 LCP (1x8) MH Manhole

Z Access Terminal Box HH Handhole

Riser Conduit SB Service Box

Fiber Splicing Enclosure

ZTE CABINET (EC90 w/ C610 OLT) ABBREVIATIONS:


650mm(L)x1200mm(H)x250mm(W) FOC - Fiber Optic Cable
LCP - Local Convergence Point
NAP - Network Access Point
ODF - Optical Distribution Frame
OLT - Optical Line Terminal
FDB - Fiber Distribution Box

1200mm
EXPANSION BOLT WITH
EXPANSION SLEEVES

EXPANSION BOLT CONTRACTOR:

EXPANSION SLEEVES

TOX SCREW WITH TOX


ASPENCOM TECH INC.
TOX SCREW
m Date:
0m Surveyed/Designed by :
25 TOX KLENT ENOLBA
NETWORK DESIGNER
Date:
Checked by : JEFFERSON OCAYO
ENGINEERING AND DESIGN HEAD
WALL MOUNTING DETAILS Date:
Noted by : RAYMUND JAMES LEGARIO
PROJECT MANAGER
Date:
Recommended by : HOEMING WONG
COUNTRY MANAGER
650mm 250mm
PROJECT TITLE
FAN

AMAIA STEPS NORTH TOWER


OLT SWITCH PLARIDEL ST., MANDAUE CITY CEBU

RECTIFIER

ODF PORT
Revision Date
1200mm

1200mm

A B C

D E F

G H I

DC PDU
OWNER/PROPONENT:

P U R E F I B E R T E C H N O L O G Y

UNIT 401, CEBU HOLDINGS CENTER, CARDINAL ROSALES AVE, CEBU


4PCS BATTERY BUSSINES PARK, CEBU CITY

OWNER/PROPONENT:

ZTE CABINET (EC90 w/ C610 OLT) DETAILS METRO WORKS


ICT CONSTRUCTION INC.
UNIT 401, CEBU HOLDINGS CENTER, CARDINAL ROSALES AVE, CEBU
BUSSINES PARK, CEBU CITY

Date:
Checked/ Recommending
Approval by :
OSP Planning & Engineering Head

Date:
Approved by:
Engineering Head

Work Order No. Sheet Content Sheet No.

07