You are on page 1of 2

Epit NON CONFORMANCE REPORT

Engineering and Consulting.

QC-NC / 007

REQUESTING PARTY
Company: EPIT Department: Construction Supervision

Name: Date:
NON-CONFORMANCE
Works Concerned /
Location / Section:
REQUIREMENT(S)
/References:
D TS
E
I:1P

DESCRIPTION OF
C
ITA E
IFITN

NON-
O
N

CONFORMANCE:
Material
POSSIBLE ROOT Manpower
CAUSE: Design
Method
Process
Other
Attached
Documents:

REMEDIAL WORKS
PROPOSAL / REPAIR
CORRECTION:
DEMOLISH / REJECT

USE AS IS
CLOSURE DATE:
STEP 2 : REMEDY

CORRECTIVE
ACTION (to avoid
recurrence):
REVIEW by DESIGNER (if required):

Name: Position: Date: Signature:


CLIENTS APPROVAL ON REMEDIAL WORKS / CORRECTION
Comments:

Name: Date: Signature:

COMPANY:
RESPONSIBLE FOR THE CLOSURE OF NCR:
PERSON:
STEP 3 : CLOSURE

VERIFICATION OF CLOSURE OF THIS NCR / INSPECTION


Attachments
:

RESPONSIBLE PERSON CONTRACTOR CLIENT


Comments:

Name:
Date:
Signature:

D.o.D&C._Hydro
Epit NON CONFORMANCE REPORT
Engineering and Consulting.

QC-NC / 007

D.o.D&C._Hydro

You might also like