SUMMARY

DESCRIPTION UNIT QUANTITY

FIG.8 48C FOC M 4978

RESIDENCES EA 503

LCP EA 5
NAP EA 33
FOC CLOSURE EA 2
GROUNDING EA 15
INSTALLEDD POLE PCS 63

PENETRATION PERCENT 47.71

LINES LINE 264

CONTRACTOR:

LEO
TECHNOLOGIES AND INFRASTRUCTURE CORPORATION

Surveyed/Designed by : Date:
BRYAN CARL LASCOTA
OSP Surveyor / CADD Operator
Checked by : Date:
ALVIN KIM MANLA
OSP Engineer
Noted by : Date:
RONNIE VALDEZ
OSP Project Manager
Recommended by : Date:
ROMAIN ZHANG
OSP Project Director

PROJECT TITLE
OUTSIDE PLANT DESIGN
PROVINCE OF NUEVA ECIJA
MUNICIPALITY OF MUÑOZ
HORIZON PROJECT
POI-2F
BANTUG - BAGONG SIKAT
BRGY. BANTUG, BAGONG SIKAT

Revision Date
- 015 -

- 014 013

- 012 011

OWNER/PROPONENT:

CONVERGE
I C T S O L U T I O N S I N C.

# 99 Reliance Center E. Rodriguez Jr. Ave. (C-5)


Barangay Ugong, Pasig City Philippines
OWNER/PROPONENT:

METRO WORKS
ICT CONSTRUCTION INC.
#99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines

Surveyed/Designed by : Date:
VON BISMARK L. DE LEON
OSP Engineer
Checked by : Date:
ROMMEL P. CABANG
NORTH Luzon Design Engr. Head
Noted by : Date:
ALLAN Q. GO
Access Network Head
Recommended by : Date:
EDWIN C. MABITAZAN
Planning & Engineering Head

Work Order No. Sheet No.


14
GEOGRAPHICAL PLAN 19

You might also like