You are on page 1of 20

Republic of the Philippines

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


BUKIDNON SECOND
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE X
Pinamaloy, Don Carlos, Bukidnon

PROJECT:

LOCAL INFRASTRUCTURE PROGRAM


BUILDINGS and other STRUCTURES
Construction of Multi-Purpose Building
(Office Building)

LOCATION:

Barangay Kawilihan, Don Carlos, Bukidnon

DESIGNED BY : CHECKED/REVIEWED BY : RECOMMENDING APPROVAL : APPROVED :

SIDNEY H. FLORES NORMA A. OGABANG MANUEL D. VARIAS, Jr. LIBERATO S. TAN, Jr.
ARCHITECT II CHIEF, PLANNING and DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
DATE: DATE: DATE: DATE:
THIS SITE

NORTH
THIS SITE

MINDANAO MAP BUKIDNON MAP


1 K E Y M A P
G-1 SCALE NDTS

THIS SITE
COORDINATES:
7.665175, 124.856120

2 L O C A T I O N M A P
G-1 SCALE NDTS

PROJECT TITLE: SHEET CONTENTS : DRAWN BY: SURVEYED BY: CHECKED/REVIEWED BY : APPROVED : SET NO. SHEET NO.
RECOMMENDING APPROVAL :
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
LOCAL INFRASTRUCTURE PROGRAM
BUILDINGS and other STRUCTURES
G-1
Construction of Multi-Purpose Building
-KEY MAP 1
BUKIDNON SECOND
DISTRICT ENGINEERING OFFICE (Office Building) -LOCATION MAP
Date Published:
REGIONAL OFFICE X
ANNA MAE R. BALASABAS LOUDIE M. MAGANTE NORMA A. OGABANG MANUEL D. VARIAS, Jr. LIBERATO S. TAN, Jr. 1 19
Pinamaloy, Don Carlos, Bukidnon
LOCATION : Date Created:
Brgy. Kawilihan, Don Carlos, Bukidnon

2020
DRAFTSMAN ENGINEER I CHIEF, PLANNING and DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER L I P 2020
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE CITY/ MUNICIPAL
ENGINEER/BUILDING OFFICIAL

DISTRICT / CITY / MUNICIPALITY

LAND USE & ZONING

LINE & GRADE

ARCHITECTURAL

STRUCTURAL

1 P E R S P E C T I V E
A-1 SCALE NDTS

SANITARY

T A B L E O F C O N T E N T
GENERAL DRAWING ARCHITECTURAL DRAWING STRUCTURAL DRAWING PLUMBING/ SANITARY DRAWING ELECTRICAL DRAWING

G-1 -KEY MAP


A-1 -PERSPECTIVE S-1 -STANDARD DETAILS P-1 -COLD WATER LINE LAYOUT ELECTRICAL
-LOCATION MAP -SOLID & WASTE LINE LAYOUT
A-2 -FLOOR PLAN S-2 -STANDARD DETAILS
-COLD WATER LINE ISOMETRIC VIEW
A-3 -FRONT ELEVATION S-3 -STANDARD DETAILS -SOLID & WASTE LINE ISOMETRIC VIEW
-REAR ELEVATION
S-4 -FOUNDATION PLAN
-RIGHT SIDE ELEVATION P-2 -GENERAL NOTES
-ROOF BEAM FRAMING PLAN
-LEFT SIDE ELEVATION -SEPTIC TANK DETAILS
A-4 S-5 -TYPICAL BEAM DETAILS
-LONGITUDINAL SECTION
-FOOTING & COLUMN DETAILS
-CROSS SECTION
-WALL FOOTING DETAILS
-SCHEDULE OF DOORS & WINDOWS
A-5 -WALL & FLOOR FINISH PLAN
S-6 -RAMP DETAILS MECHANICAL
-ROOF FRAMING PLAN
-REFLECTIVE CEILING PLAN
S-7 -TRUSS DETAILS
A-6 -ROOF PLAN
-BASE PLATE DETAILS (TRUSS COLUMN
CONNECTION)
-GUSSET PLATE DETAILS

S-8 -PURLIN CONNECTION DETAILS


-PURLIN SPLICE
-DETAIL OF PURLIN TO SAGROD
CONNECTION FIRE SAFETY

PROJECT TITLE: SHEET CONTENTS : DRAWN BY: DESIGNED BY: CHECKED/REVIEWED BY : APPROVED : SET NO. SHEET NO.
RECOMMENDING APPROVAL :
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
LOCAL INFRASTRUCTURE PROGRAM
BUILDINGS and other STRUCTURES
A-1
-PERSPECTIVE 2
BUKIDNON SECOND Construction of Multi-Purpose Building PDS
DISTRICT ENGINEERING OFFICE (Office Building) Date Published:
REGIONAL OFFICE X
ANNA MAE R. BALASABAS SIDNEY H. FLORES NORMA A. OGABANG MANUEL D. VARIAS, Jr. LIBERATO S. TAN, Jr. 6 19
Pinamaloy, Don Carlos, Bukidnon
LOCATION : Date Created:

2020
Brgy. Kawilihan, Don Carlos , Bukidnon DRAFTSMAN ARCHITECT II CHIEF, PLANNING and DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER L I P 2020
A B C D

12.13m

3.91m 4.01m 3.91m

W W W W W W
3 4 4 3 3 4

1
1.25m
D
PANTRY PANTRY
1.70m 2
D D
PANTRY 2 2

1.25m

4.81m W 5.11m
2 OFFICE 1 OFFICE 2 OFFICE 3 W
2

2 W
D
1
D
1
W W
D
1
1 1 1

2.36m
L O B B Y 2.36m

3
PLANT BOX

LANDING

1 F L O O R P L A N
SCALE 1:50m
A-2

PROJECT TITLE: SHEET CONTENTS : DRAWN BY: DESIGNED BY: CHECKED/REVIEWED BY : APPROVED : SET NO. SHEET NO.
RECOMMENDING APPROVAL :
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
LOCAL INFRASTRUCTURE PROGRAM
BUILDINGS and other STRUCTURES -FLOOR PLAN A-2
BUKIDNON SECOND Construction of Multi-Purpose Building PDS 3
DISTRICT ENGINEERING OFFICE (Office Building) Date Published:
REGIONAL OFFICE X
ANNA MAE R. BALASABAS SIDNEY H. FLORES NORMA A. OGABANG MANUEL D. VARIAS, Jr. LIBERATO S. TAN, Jr. 6 19
Pinamaloy, Don Carlos, Bukidnon
LOCATION : Date Created:

2020
Brgy. Kawilihan, Don Carlos , Bukidnon DRAFTSMAN ARCHITECT II CHIEF, PLANNING and DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER L I P 2020
100mm THK. CHB WALL W/ 25mm THK. 100mm THK. CHB WALL W/ 25mm THK.
PASTER BOTH SIDE W/ WATER PROOFING; PASTER BOTH SIDE W/ WATER PROOFING;
PAINTED W/ 3 COATS ELASTOMERIC PAINT
A B C D
PAINTED W/ 3 COATS ELASTOMERIC PAINT
3 2 1
0.40 mm THK. PRE-PAINTED 0.40 mm THK. PRE-PAINTED
G.I CORRUGATED ROOFING G.I CORRUGATED ROOFING
SHEET LONG SPAN SHEET LONG SPAN

ROOF ROOF
4.71m APEX 4.71m APEX

3.40 m FCL 3.40 m FCL

0.40 m FFL 0.40 m FFL


0.00 m FGL 0.00 m FGL

1 FRONT ELEVATION 3 RIGHT SIDE ELEVATION


SCALE 1:60m
A-3 SCALE 1:60m A-3

100mm THK. CHB WALL W/ 25mm THK.


PASTER BOTH SIDE W/ WATER PROOFING;
PAINTED W/ 3 COATS ELASTOMERIC PAINT 100mm THK. CHB WALL W/ 25mm THK.
PASTER BOTH SIDE W/ WATER PROOFING;
PAINTED W/ 3 COATS ELASTOMERIC PAINT
A B C D 1 3
2
0.40 mm THK. PRE-PAINTED 0.40 mm THK. PRE-PAINTED
G.I CORRUGATED ROOFING G.I CORRUGATED ROOFING
SHEET LONG SPAN SHEET LONG SPAN

ROOF ROOF
4.71m APEX 4.71m APEX

3.40 m FCL 3.40 m FCL

0.40 m FFL 0.40 m FFL


0.00 m FGL 0.00 m FGL

2 R E A R E L E V A T I O N
SCALE 1:60m
A-3 4 LEFT SIDE ELEVATION
SCALE 1:60m
A-3

PROJECT TITLE: SHEET CONTENTS : DRAWN BY: DESIGNED BY: CHECKED/REVIEWED BY : APPROVED : SET NO. SHEET NO.
RECOMMENDING APPROVAL :
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
LOCAL INFRASTRUCTURE PROGRAM
BUILDINGS and other STRUCTURES -FRONT ELEVATION A-3
BUKIDNON SECOND Construction of Multi-Purpose Building -REAR ELEVATION PDS 4
DISTRICT ENGINEERING OFFICE (Office Building) -RIGHT SIDE ELEVATION Date Published:
REGIONAL OFFICE X -LEFT SIDE ELEVATION ANNA MAE R. BALASABAS SIDNEY H. FLORES NORMA A. OGABANG MANUEL D. VARIAS, Jr. LIBERATO S. TAN, Jr. 6 19
Pinamaloy, Don Carlos, Bukidnon
LOCATION : Date Created:

2020
Brgy. Kawilihan, Don Carlos , Bukidnon DRAFTSMAN ARCHITECT II CHIEF, PLANNING and DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER L I P 2020
PLAN
0.40 mm THK. PRE-PAINTED
G.I CORRUGATED ROOFING
SHEET LONG SPAN
3 2 1
100mm THK. CHB WALL W/ 25mm THK. 0.90m 0.80m 1.21m
PASTER BOTH SIDE W/ WATER PROOFING; MODEL 0.80m 0.70m 1.15m
PAINTED W/ 3 COATS ELASTOMERIC PAINT

1.23m 1.16m
ROOF

2.15m

2.15m
2.10m

2.10m
4.71m APEX

0.90m 0.54m 0.54m

FINISH FLOOR LINE


3.40 m FCL W
D D
DESIGNATION 1 2
1

SINGLE-LEAF SINGLE ACTING PRE-FAB. SINGLE-LEAF SINGLE ACTING PRE-FAB.


WOOD PANEL DOOR W/ COMPLETE PVC DOOR W/ FIXED LOVER BELOW SLIDING TYPE WINDOW W/ FIXED TRANSOM
HARDWARE & ACCESSORIES COMPLETE HARDWARE & WINDOW W/ 6mm THK. GLASS ON ANALOK
DESCRIPTION ACCESSORIES ALUMINUM FRAME

NO. OF SETS THREE (3) SETS THREE (3) SETS THREE (3) SETS

0.40 m FFL LOCATION OFFICE 1, 2 & 3 TOILET OFFICE 1, 2 & 3

0.00 m FGL

3a SCHEDULE OF DOORS AND WINDOWS


SCALE 1:50m
CROSSECTION SECTION A-5
1
SCALE 1:60m
A-4

PLAN
A B C D
100mm THK. CHB WALL W/ 25mm THK.
PASTER BOTH SIDE W/ WATER PROOFING;
PAINTED W/ 3 COATS ELASTOMERIC PAINT
2.41m 1.20m
0.40 mm THK. PRE-PAINTED MODEL 2.35m 1.13m
0.60m

G.I CORRUGATED ROOFING


SHEET LONG SPAN ROOF
4.71m APEX 0.60m 0.55m 0.60m 0.54m

1.23m 1.16m

0.47m 0.47m 0.46m


3.40 m FCL 1.50m 1.50m

0.90m 0.54m 0.54m 0.54m 0.54m

FINISH FLOOR LINE


W W W
DESIGNATION 2 3 4

SLIDING TYPE WINDOW W/ FIXED TRANSOM AWNING TYPE WINDOW w/ 12mm AWNING TYPE WINDOW w/ 12mm
WINDOW W/ 6mm THK. GLASS ON ANALOK TEMPERED GLASS ON FD 100 TEMPERED GLASS ON FD 100
ALUMINUM FRAME ALUMINUM FRAME
DESCRIPTION ALUMINUM FRAME

0.40 m FFL
0.00 m FGL NO. OF SETS TWO (2) SETS THREE (3) SETS THREE (3) SETS

OFFICE 1 & 3 PANTRY TOILET


LOCATION

2 L O NG I T UD I NA L S E CT I O N
A-4 SCALE 1:60m 3b SCHEDULE OF DOORS AND WINDOWS
SCALE 1:50m
A-5

PROJECT TITLE: SHEET CONTENTS : DRAWN BY: DESIGNED BY: CHECKED/REVIEWED BY : APPROVED : SET NO. SHEET NO.
RECOMMENDING APPROVAL :
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
LOCAL INFRASTRUCTURE PROGRAM
BUILDINGS and other STRUCTURES -LONGITUDINAL SECTION A-4
BUKIDNON SECOND Construction of Multi-Purpose Building -CROSS SECTION PDS 5
DISTRICT ENGINEERING OFFICE (Office Building) -SCHEDULE OF DOORS & WINDOWS Date Published:
REGIONAL OFFICE X
ANNA MAE R. BALASABAS SIDNEY H. FLORES NORMA A. OGABANG MANUEL D. VARIAS, Jr. LIBERATO S. TAN, Jr. 6 19
Pinamaloy, Don Carlos, Bukidnon
LOCATION : Date Created:

2020
Brgy. Kawilihan, Don Carlos , Bukidnon DRAFTSMAN ARCHITECT II CHIEF, PLANNING and DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER L I P 2020
LEGEND/S:
FLOOR FINISHES:
FF-1 600 x 600mm HOMOGENEOUS GRANITE FLOOR TILES

FF-2 600x600mm CERAMIC FLOOR TILES (NON-SKID)

FF-3 600x600mm CERAMIC TILES (NON-SKID)

FF-4 400x400mm CERAMIC FLOOR TILES

FF-5 PLAIN CEMENT FLOOR TOPPING WITH HARDINER (NON-SKID)

A B C D A B C D FF-6 NON SKID PLAIN CEMENT FLOOR FINISH


W/ 6mm x 6mm GROOVE x 100mm DIST. OC.

WALL FINISHES:
WF-1 FROM FLOOR TO CEILING: 150x600mm GRANITE BASE TILES

(SAME AS FLOOR TILES); REST OF THE WALL ABOVE

PAINTED w/ 3 COATS OF SEMI-GLOSS LATEX PAINT

CF-1

WF-2 FROM FLOOR TO CEILING: 5 LAYERS OF 300x600 WALL TILES w/


1 WF-1
WF-2 WF-2
WF-1 WF-1
WF-2 1 10mmx10mm GROOVE MOLDING TERMINAL; REST OF THE WALL
CF-2 CF-2 CF-2

WF-2
WF-2
WF-2

FF-3 FF-3 FF-3 CF-2 CF-2 CF-2 ABOVE PAINTED w/ 3 COATS OF SEMI-GLOSS LATEX PAINT

WF-2 WF-2 WF-2 (TILES AND WALL FINISH ON SAME PLUMB)

WF-3 FROM FINISH GRADE LINE TO TOP OF PARAPET: 300mm LEDGE

STONE CLADDING; REST OF THE WALL CLAD w/ 4.5mm THK.

CF-2

CF-2

CF-2
CF-1

CF-1
CF-2

CF-2

CF-2
FF-1 FF-1 FF-1 CF-1 CF-1
WF-1

CF-1

WF-1

WF-1

WF-1
WF-1

WF-1

ALUMINUM COMPOSITE METAL SHEET ON ALUMINUM BATTENS

CF-2 CF-2 CF-2


WF-1 WF-1 WF-1
2 2
LEGEND/S:
CEILING FINISHES:
CF-1 610X610x16mm THK. ACOUSTICAL BOARD, NON-SAG MINERAL
FF-1
CF-1 FIBER ON SUSPENDED T-RUNNER CEILING FRAMES

CF-2 4.5mm THK. HIGH DENSITY FIBER CEMENT BOARD ON LIGHT


3 3 METAL FRAMES w/ 150mm WIDE RECESSED CORNER;

PAINTED w/ 3 COATS GLOSS LATEX PAINT

FF-6
CF-3 4.5mm THK. HIGH DENSITY FIBER CEMENT BOARD ON

LIGHT METAL FRAMES; PAINTED w/ 3 COATS GLOSS LATEX

PAINT

FF-6

WALL & FLOOR FINISH FLOOR


1 P L A N 2 REFLECTIVE CEILING PLAN
SCALE 1:60m SCALE 1:60m
A-5 A-5

PROJECT TITLE: SHEET CONTENTS : DRAWN BY: DESIGNED BY: CHECKED/REVIEWED BY : APPROVED : SET NO. SHEET NO.
RECOMMENDING APPROVAL :
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
LOCAL INFRASTRUCTURE PROGRAM
BUILDINGS and other STRUCTURES -WALL & FLOOR FINISH PLAN A-5
BUKIDNON SECOND Construction of Multi-Purpose Building -REFLECTIVE CEILING PLAN PDS 6
DISTRICT ENGINEERING OFFICE (Office Building) Date Published:
REGIONAL OFFICE X
ANNA MAE R. BALASABAS SIDNEY H. FLORES NORMA A. OGABANG MANUEL D. VARIAS, Jr. LIBERATO S. TAN, Jr. 6 19
Pinamaloy, Don Carlos, Bukidnon
LOCATION : Date Created:

2020
Brgy. Kawilihan, Don Carlos , Bukidnon DRAFTSMAN ARCHITECT II CHIEF, PLANNING and DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER L I P 2020
A B C D

0.40 mm THK. PRE-PAINTED


G.I CORRUGATED ROOFING
SHEET LONG SPAN

1
0.40 mm THK.
PRE-PAINTED G.I. SHEET
END FLUSHING

SLOPE

0.40 mm THK.
PRE-PAINTED G.I. SHEET
END FLUSHING

SLOPE
3

2 R O O F P L A N
SCALE 1:60m
A-6

PROJECT TITLE: SHEET CONTENTS : DRAWN BY: DESIGNED BY: CHECKED/REVIEWED BY : APPROVED : SET NO. SHEET NO.
RECOMMENDING APPROVAL :
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
LOCAL INFRASTRUCTURE PROGRAM
BUILDINGS and other STRUCTURES -ROOF PLAN A-6
BUKIDNON SECOND Construction of Multi-Purpose Building PDS 7
DISTRICT ENGINEERING OFFICE (Office Building) Date Published:
REGIONAL OFFICE X
ANNA MAE R. BALASABAS SIDNEY H. FLORES NORMA A. OGABANG MANUEL D. VARIAS, Jr. LIBERATO S. TAN, Jr. 6 19
Pinamaloy, Don Carlos, Bukidnon
LOCATION : Date Created:

2020
Brgy. Kawilihan, Don Carlos , Bukidnon DRAFTSMAN ARCHITECT II CHIEF, PLANNING and DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER L I P 2020
50mm
GENERAL NOTES : TOOLED
EDGE
1.0 STANDARDS AND REFERENCES 4.0 MATERIALS
THE FOLLOWING SHALL GOVERN THE DESIGN, FABRICATION AND CONSTRUCTION OF THE 4.1 CONCRETE
PROJECT
4.1.1 CONCRETE COVER OVER REINFORCING BARS SHALL BE AS FOLLOWS:
1.1 NATIONAL STRUCTURAL CODE OF THE PHILIPPINES (N.S.C.P) VOL. 1, 6TH EDITION, 2015.
A. FOOTINGS, FOOTING-TIE BEAMS (CAST AGAINST EARTH)
B. BEAMS AND COLUMNS (TO STIRRUPS AND TIES) CONSTRUCTION JOINT
2.0 DESIGN CRITERIA C. WALLS, SIDE OF FOOTING-TIE BEAMS (CAST AGAINST FORMS)
D. SUSPENDED SLAB
2.1 LOADINGS
SAWED JOINT
W/ SEALANT 3mm
A. DEAD LOAD 4.1.2 BEFORE CONCRETE IS POURED, CHECK WITH ALL TRADES TO ENSURE PROPER
PLACEMENT OF ALL OPENINGS, SLEEVES, CURBS, CONDUITS, ETC. RELATING TO
CONCRETE -24kN/m3 THE WORK.
STEEL -75.00kN/m3
150mm THK. CHB WALL -2.73 kPa 4.2 REINFORCING BARS
100mm THK. CHB WALL -2.11 kPa
4.2.1 ALL REINFORCING BARS SHALL BE CLEAN OF RUST, GREASE OR OTHER MATERIALS
B. LIVE LOAD
THAT WILL IMPAIR BOND. WEAKENED PLANE JOINT
ROOF -1.00 kPa 4.2.2 ALL REINFORCING BARS SHALL BE ACCURATELY AND SECURELY PLACED BEFORE
CLASSROOMS, LABORATORY -1.90 kPa POURING CONCRETE OR APPLYING MORTAR OR GROUT. NOTE:
TOILETS -2.40 kPa CONTROL JOINT CAN BE EITHER CONSTRUCTION JOINT
CORRIDORS ABOVE, STAiRS -3.80 kPa 4.2.3 LAPPED SPLICES SHALL BE STAGGERED WHERE POSSIBLE. OR WEAKENED PLANE JOINT
CORRIDORS ON GROUND -4.80 kPa
4.2.4 UNLESS OTHERWISE INDICATED, SPLICING OF REINFORCEMENT SHALL BE IN
ACCORDANCE WITH ACI-318M. EXCEPT THAT THE MINIMUM LAP SPLICE SHALL BE
C. WIND LOAD (NSCP 2015)
BASIC WIND VELOCITY, V - 250 KPH
40 BAR DIAMETER BUT NOT LESS THAN 600mm.
1C CONTROL JOINTS FOR SLAB ON FILL
P = qh [(GCpf)-(GCpi)] (DESIGN WIND PRESSURE) 4.2.5 UNLESS SHOWN OTHERWISE ON PLANS, SPLICES SHALL BE AS FOLLOWS;
WHERE: qh = VELOCITY PRESSURE, kPa) S-1 NOT TO SCALE
GCpf = EXTERNAL PRESSURE COEFFICIENT
GCpi = INTERNAL PRESSURE COEFFICIENT

D. SEISMIC LOAD (NSCP 2015)


A. INTERMEDIATE BEAMS: TOP BARS SHALL BE SPLICED AT MID-SPAN, AND BOTTOM 12d
Cvl BARS AT THE SUPPORT.
V= W DESIGN BASE SHEAR

D
RT B. BEAMS FRAMING TO COLUMNS: TOP BARS SHALL BE SPLICED AT MID-SPAN AND
BOTTOM BARS SHALL NOT BE SPLICED W/IN THE COLUMN OR W/IN A DISTANCE
OF TWICE THE MEMBER DEPTH FROM THE FACE OF THE COLUMN. THE SPLICED
2.50 Cal LENGTH SHALL NOT BE LESS THAN 1.4 TIMES THE DEVELOPMENT LENGTH (Ld) IN
Vmax = W Vmin = CalW 0.11
R D
4.2.8 BELOW BUT NOT LESS THAN 600mm.
0.80 ZNvl

10
Vmin = W (ZONE 4) C. COLUMNS: LAP SPLICES SHALL BE MADE WITHIN THE CENTER HALF OF HEIGHT d

d
R

M
AND THE SPLICE SHALL NOT BE LESS THAN 30 BAR DIAMETER. WELDING OR d d

IN
THE USE OF APPROVED MECHANICAL DEVICES MAY BE PERMITTED PROVIDED
WHERE: W = TOTAL DEAD LOAD NOT MORE THAN ALTERNATE BARS ARE WELDED OR SPLICED AT ANY LEVEL AND
2/3 THE MINIMUM VERTICAL DISTANCE BETWEEN TWO ADJACENT BAR SPLICES SHALL 90° HOOK 180° HOOK TIE HOOK
T = NATURAL PERIOD = C (h ) ; BE 600mm.
n t
D. CHB WALLS: VERTICAL BARS SHALL BE SPLICED AT THE TOP OF WALL FOOTINGS
WHERE: C = NUMERICAL COEFFICIENT
h = BUILDING HEIGHT OR FOOTING-TIE BEAMS AND THE THE BOTTOM OF REINFORCED CONCRETE LINTEL D
I = IMPORTANCE FACTOR = 1.50 BEAMS OR BEAMS. BAR SIZE
R = NUMERICAL FACTOR = 8.50 90° HOOK 180° HOOK
SEISMIC COEFFICIENT Cv = 0.44Nv 4.2.6 UNLESS OTHERWISE INDICATED: ALL BEAMS TERMINATING AT A COLUMN SHALL HAVE 10mm Ø THRU 25mm Ø 6d 4d
Ca = 0.64N TOP AND BOTTOM BARS EXTENDING TO THE FAR FACE OF THE COLUMN, TERMINATING
NEAR SOURCE FACTOR (10km) Nv = 1.2 IN A STANDARD 90 HOOK LENGTH OF ANCHORAGE SHALL NOT BE LESS THAN 600mm. 28mm Ø THRU 36mm Ø 8d 4d
NA = 1.0 4.2.7 SHOP DRAWING FOR REINFORCEMENT SHALL BE SUBMITTED FOR APPROVAL OF THE
ENGINEER PRIOR TO FABRICATION & INSTALLATION.
Z = SEISMIC ZONE = 0.40 (ZONE 4)
S = SOIL TYPE = D 4.2.8 DEVELOPMENT LENGTH (Ld) OF REINFORCING BARS SHALL BE AS FOLLOWS: NOTE: 1. ALL BENDS SHOWN IN DETAILS/SCHEDULES SHALL BE
2.2 DESIGN STRESSES STANDARD HOOK OTHERWISE NOTED.
SIZE OF REBARS DEVELOPMENT LENGTH
A. CONCRETE 10 mm 170 mm 2. 180° HOOKS MAY BE SUBSTITUTED FOR 90° HOOKS.
COMPRESSIVE STRENGTH @ 28 DAYS fc' = 20.7 MPa (3,000 psi) 12 mm 220 mm 40d
B. REINFORCING BARS 16 mm 270 mm

d
a. FOR BARS 16mm Ø AND GREATER fy = 275 MPa (40,000 psi) 20 mm 380 mm 6 600MM (MIN.)
b. FOR BARS LESS THAN 16mm Ø fy = 275 MPa (33,000 psi) 1
25 mm 600 mm
C. STRUCTURAL STEEL, ASTIM-A36
WIRE TIGHTLY
FOR TRUSSES, BRACINGS, & STRUTS fy = 248 MPa (36,000 psi) 4.3 STRUCTURAL STEEL
TOGETHER
D. PURLINS
COLD FORMED LIGHT GAGE SHAPES fy = 248 MPa (36,000 psi) 4.3.1 ALL STRUCTURAL STEEL SHALL CONFORM TO ASTM A36 AND SHALL HAVE A MINIMUM OFFSET LAP SPLICE
YIELD STRESS, Fy = 248 MPa (36,000 psi)
4.3.2 ALL STRUCTURAL STEEL SHALL BE FABRICATED AND ERECTED IN ACCORDANCE WITH
E. MASONRY UNIT (CHB)
THE ALSO SPECIFICATIONS AND CODE OF STANDARD PRACTICE AS AMMENDED TO
NON-LOAD BEARING CHB WALLS
F. WELDS - USED E - 60xx ELECTRODE
fm' = 3.45 MPa (500 psi)
DATE
4.3.3 ALL BOLTS SHALL CONFORM TO ASTM A-307 UNLESS OTHERWISE INDICATED.
1B TYP. REINFORCEMENT DETAIL
G. STRUCTURAL BOLTS, ASTM-A307
4.3.4 SHOP AND FIELD WELDING SHALL BE IN ACCORDANCE WITH AWS D1.1 AND PERFORMED
BY QUALIFIED WELDERS.
S-1 NOT TO SCALE
a. Ft. = 96.60 MPa (14,000 psi) b. Fv = 69 MPa (10,000 psi) 4.3.5 UNLESS OTHERWISE INDICATED, WELDING ELECTRODES SHALL BE E60.
4.3.6 NO STEEL SHALL BE FABRICATED OR ERECTED UNTIL SHOP DRAWINGS HAVE BEEN
3.0 FOUNDATION APPROVED BY THE STRUCTURAL ENGINEER.
3.1 ASSUMED SOIL BEARING CAPACITY SHALL BE 96KPa (2,000 PSF) 4.3.7 WELDS/(CONFORM WITH AMERICAN WELDING STANDARDS) USING E 60xx ELECTODES.
fy = 93.77 MPa. CONSTRUCTION
3.1.1 IN CASE THE ACTUAL LOCATION OF THE STRUCTURE IS LESS THAN THE ASSUMED 3 EXTRA STIRRUPS
4.3.8 ANCHOR BOLTS (CONFORM WITH ASTM A-307) ft = 96.60 MPa. fv = 69 MPa. JOINT 50 30 50
DISTANCE FROM THE SEISMIC SOURCE OF 40km; NOTIFY THE PLANNING AT 75MM.O.C.
ENGINEER FOR PROPER REVISION OF THE DESIGN. REFER TO THE SEISMIC
SOURCE MAP PROVIDED IN THE NATIONAL STRUCTURAL CODE OF THE PHILIPPINES
OR PHIVOLCS SEISMIC SOURCE MAP. 4.4 CONCRETE HOLLOW BLOCKS (CHB):
3.1.2 SOIL TEST SHALL BE CONDUCTED PRIOR TO START OF CONSTRUCTION.
3.1.3 IN CASE THE ACTUAL SOIL BEARING CAPACITY IS FOUND LESS THAN THE ASSUMED, 4.4.1 UNLESS OTHERWISE INDICATED, CHB USED IN THIS WORK SHALL HAVE A MINIMUM

h/3
96 kPa; NOTIFY THE PLANNING ENGINEER. ULTIMATE COMPRESSIVE STRENGTH f'm = 3.45 MPa (500psi)
4.4.2 ALL CHB CELLS SHALL BE FILLED SOLIDLY WITH GROUT.
3.1.4 NO FOOTING SHALL REST ON FILL.

h/3
3.1.5 BOTTOM OF FOOTING SHALL BE AT LEAST 1.00m. BELOW NATURAL GRADE LINE
3.1.6 SOIL BEARING CAPACITY SHALL BE INCREASED BY 33% WHEN IN COMBINATION WITH
5.0 CONSTRUCTION JOINT

h/3
SEISMIC OR WIND LOAD.
5.1 CONSTRUCTION JOINT NOT INDICATED ON THE PLANS SHALL BE MADE SO AS TO LEAST
IMPAIR THE STRENGTH OF THE STRUCTURE AND SHALL BE SUBJECT TO THE APPROVAL 3 EXTRA STIRRUPS BEAM
3.2 ALL COLUMN FOOTINGS & TIE BEAMS SHALL REST ON 100mm THK. WELL COMPACTED OF THE ENGINEER EXCEPT SLAB ON GRADE. AT 75MM.O.C. REINFORCEMENT
GRAVEL BASE COURSE. 5.2 UNLESS SHOWN OTHERWISE, SLAB ON GRADE SHALL HAVE CONTROL JOINTS SPACED AT (DO NOT INTERRUPT)
600mm MAXIMUM CENTER TO CENTER.
3.3 BACK FILL SHALL BE PLACED IN LAYER AND EACH LAYER SHALL BE 200mm THK. AND
5.3 BEAMS CONSTRUCTION JOINT SHALL BE LOCATED W/ IN THE MIDDLE THIRD OF THE SPAN.
SHALL BE COMPACTED TO 95% MAXIMUM DRY DENSITY
IT SHALL BE PROVIDED WITH 3 EXTRA STIRRUPS @ 75mm O.C. ON EACH SIDE OF THE
JOINT.
3.4 WHERE LOOSE/SOFT MATERIAL IS ENCOUNTERED AT DEPTH OF EMBEDMENT INDICATED,
EXCAVATE TO FIRM LAYER AND REPLACE LOOSE/MATERIALS UNDERNEATH THE FOOTING
1A BEAM CONSTRUCTION JOINT
WITHIN THE FOOTING AREA PLUS 1/2 DEPTH OF SOFT MATERIAL ON ALL SIDES WITH
SELECT GRANULAR BACKFILL. COMPACT SELECT GRANULAR BACKFILL TO 95% OF
S-1 NOT TO SCALE
MAXIMUM DRY DENSITY.

1 STANDARD DETAILS
NOT TO SCALE
S-1

PROJECT TITLE: SHEET CONTENTS : DRAWN BY : DESIGNED BY : CHECKED/REVIEWED BY : APPROVED : SET NO. SHEET NO.
RECOMMENDING APPROVAL :
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
LOCAL INFRASTRUCTURE BUILDINGS S-1
BUKIDNON SECOND
PROGRAM and other STRUCTURES -STANDARD DETAILS
PDS 8
Construction of Multi-Purpose Building
DISTRICT ENGINEERING OFFICE (Office Building) Date Published:
REGIONAL OFFICE X
ANNA MAE R. BALASABAS APRIL JOAN B. REPOLIDON NORMA A. OGABANG MANUEL D. VARIAS, Jr. LIBERATO S. TAN, Jr. 7 19
Pinamaloy, Don Carlos, Bukidnon
LOCATION : Date Created:

2020
Brgy. Kawilihan, Don Carlos, Bukidnon DRAFTSMAN ENGINEER II CHIEF, PLANNING and DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER L I P 2020
SPLICING REQUIREMENT OF REINFORCING BARS "Ls" or "Ld"
BEAMS COLUMNS FLOORSLABS NOTE:
SINGLE & 2 BAR BUNDLE THREE BAR BUNDLE VERTICAL REINFORCEMENT Ld = DEVELOPMENT LENGTH OF
BAR BAR BAR SINGLE & RE-BARS ABOVE VALUES
SIZE BOTTOM TOP BOTTOM TOP SIZE SIZE 2 BAR BUNDLE SHALL BE THE MINIMUM
SINGLE & 2 BAR BUNDLE THREE BAR BUNDLE
BARS BARS BARS BARS SPLICE OR DEVELOPMENT
LENGTH. ADDITIONAL
16Ø 600MM. 750MM. 800MM. 925MM. 20Ø 1000MM. 10Ø 400MM. MODIFICATION FACTORS OF
ACI (CHAPTER 12) SHALL
20Ø 750MM. 950MM. 900MM. 1200MM. 25Ø 1500MM. 12Ø 500MM. BE USED WHEREVER
APPLICABLE. 36MM. Ø BARS
25Ø 925MM. 200MM. 1100MM. 1450MM. FOR BEAMS SHALL NOT BE
BUNDLED.

REMOVAL OF FORMS & SHORINGS CAMBER REQUIREMENT


CLEAR SPAN MINIMUM TIME PERIOD
STRUCTURAL ELEMENTS BETWEEN SUPPORTS (DAYS) ELEMENTS MINIMUM CAMBER
WALL, COLUMNS, BEAMS, R.C. BEAMS 6MM. FOR EVERY 4.50 M. SPAN
GIRDER SIDES & 1
SLAB ON GRADE CANTILEVER R.C. BEAMS 18MM. FOR EVERY 3.00 M. SPAN
UNDER 3.00 M. 7
JOIST, BEAMS &
GIRDER SOFFIT 3.00 M. TO 6.00 M. 14 R.C. SLABS 3MM FOR EVERY 3.00 M. SHORTER SPAN
OVER 6.00 M. 21
UNDER 3.00 M. 4
ONE-WAY
FLOOR SLABS 3.00 M. TO 6.00 M. 7
OVER 6.00 M. 10

500
(MINIMUM)
500
(MINIMUM) NOTE : NOTE :
SPACING S SPACING S CLEAR DISTANCE BETWEEN
TRANSVERSE COLUMN CONFINEMENT TIES RE-BARS ARE TO BE
AS PER COLUMN SCHEDULE
1. CENTER TO CENTER SPACING OF PIPE STRICTLY MAINTAINED
GIRDER TOP BARS ARE
BEAM REBARS LAIN OVER OF BEAM
SLEEVES SHALL IN NO CASE BE LESS
TOP REBARS
THAN 3 TIMES THE SLEEVE DIAMETER.

(MINIMUM)
100MM
2. PIPE SLEEVES OF ALUMINUM SHALL

h/3
BEAM DEPTH h
NOT BE EMBEDDED IN STRUCTURAL
CONCRETE.
Ldh

h/3
3. PIPE SLEEVES SHALL NOT BE LARGER
IN OUTSIDE DIMENSION THAN 1/3

h/3
50

50

THE OVERALL DEPTH OF THE BEAM.

50 TERMINATION 4. PIPE SLEEVES SHALL BE LOCATED


50
BEND 1-16MM.Ø DIAGONAL BARS WITHIN THE MIDDLE THIRD OF THE
PER CORNER L = 80Ø 2-12MMØ CLOSED
STIRRUPS (TYPICAL)
BEAM DEPTH.

INTERIOR COLUMN REBARS 5. PIPE SLEEVES SHALL BE LOCATED


INTERIOR COLUMN
WITHIN THE MIDDLE THIRD OF BEAM
CLEAR SPAN.
INTERIOR COLUMN
1D TERMINATION BEND
1E TYP. BEAM PENETRATION DETAIL TYP. PLAN OF BEAM/GIRDER
S-2 NOT TO SCALE
S-2 NOT TO SCALE
1F COL. JOINT
S-2 NOT TO SCALE

Ldh
CLEAR SPAN "L"
COLUMN CONFINEMENT AS Ld
PER COLUMN SCHEDULE TOP GIRDER BARS L/4
TOP BEAM BARS COLUMN REBARS TO BE
COLUMN Ldh EXTENDED AS PART OF
BEAM REBARS
BEAM REBARS (TOP BARS) CONFINEMENT BEAM EXTRA TOP BARS
GIRDER
LAID OVER ON GIRDER AS PER COLUMN
BEAM REINFORCEMENTS SCHEDULE BEAM STIRRUPS
R.C.COLUMN TOP BARS

50
50

(MINIMUM)
(MINIMUM)
(MINIMUM)

500MM
500 MM

50MM
50

50
50

ROOF BEAM CONT.


TOP & BOT. BARS
0.30m BEAM
50MM 50MM
REINFORCEMENT 50 CORNER/END COLUMN
BEAM BOTTOM BARS 50 50

COLUMN REBARS COLUMN REBARS COLUMN REBARS


AT GIRDER SPAN
AT COLUMN INTERSECTION
BEAM RE-BAR CORNER/EXTERIOR COL.
1A TERMINATION BEND
1B TYPICAL BEAM & GIRDER RE-BAR LAYOUT 1C TERMINATION BEND
S-2 NOT TO SCALE S-2 NOT TO SCALE
S-2 NOT TO SCALE

1 STANDARD DETAILS
NOT TO SCALE
S-2

PROJECT TITLE: SHEET CONTENTS : DRAWN BY : DESIGNED BY : CHECKED/REVIEWED BY : APPROVED : SET NO. SHEET NO.
RECOMMENDING APPROVAL :
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
LOCAL INFRASTRUCTURE BUILDINGS S-2
BUKIDNON SECOND
PROGRAM and other STRUCTURES -STANDARD DETAILS
PDS 9
Construction of Multi-Purpose Building
DISTRICT ENGINEERING OFFICE (Office Building) Date Published:
REGIONAL OFFICE X
ANNA MAE R. BALASABAS APRIL JOAN B. REPOLIDON NORMA A. OGABANG MANUEL D. VARIAS, Jr. LIBERATO S. TAN, Jr. 7 19
Pinamaloy, Don Carlos, Bukidnon
LOCATION : Date Created:

2020
Brgy. Kawilihan, Don Carlos, Bukidnon DRAFTSMAN ENGINEER II CHIEF, PLANNING and DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER L I P 2020
10MMØ HOR. BARS
HORIZONTAL BARS
SCHEDULE OF MASONRY WORKS INTERIOR
CHB REBARS

LINTEL BEAMS MASONRY


CHB WALL REBARS
CHB WALL R.C. COLUMN
B (MM.) H (MM.) HORZ. BARS STIRRUPS HORIZONTAL BARS VERTICAL BARS
t (MM.)
100 100 200 2-10MMØ 10MMØ @ 300 10MMØ @ 600 MM.O.C. 10MMØ @ 600 MM.O.C.
CHB THICKNESS CHB THICKNESS
300
150 150 200 4-10MMØ 10MMØ @ 300 10MMØ @ 600 MM.O.C. 10MMØ @ 600 MM.O.C. FINISHED
(t) (t)
300
SURFACE
200 200 200 4-10MMØ 10MMØ @ 300 10MMØ @ 600 MM.O.C. 10MMØ @ 600 MM.O.C.

1E TYPICAL LINTEL BEAM


S-3 NOT TO SCALE

NOTE :
1. REFER TO ARCHITECTURAL PLANS TO VERIFY LOCATIONS OF ALL CHB & R.C. NON STRUCTURAL WALLS.

2. REFER TO THICKNESS OF FINISHES TO ARCHITECTURAL PLANS.


R.C. & CHB EXTERIOR WALL SIDE
1D ANCHORAGE DET.
3. 12MM. THICK GAP SHALL BE PROVIDED IN BETWEEN WALLS & COLUMNS, WALLS & BEAMS, WALLS & SLABS ON TOP.
S-3 NOT TO SCALE

4. SILICONE SEALANT SHALL BE PROVIDED FOR ALL EXTERNAL WALL (CHB OR R.C.). FOR INTERNAL WALLS SEALANTS 4-12mmØ VERT. BARS
NEED TO BE PROVIDED. W/ 10mmØ TIES; 1 @ 50, 2 @
100, REST @ 200mm O.C.
5. STRUCTURAL R.C. WALLS (i.e. WATER TANK, ETC.) SHALL NOT BE PROVIDED W/ 12MM THK. GAPS ALL AROUND.
300

6. STRUCTURAL GAPS SHALL IN NO CASE BE COVERED W/ PLASTER.

50

150
PLAN
LINTEL BEAM ON TOP OF WALL
OPENING (VERIFY REBARS)

TOP OF ROOF BEAM

300
300
1-10MMØ
VERTICAL BAR PER
SIDE OF OPENING
200 200

CHB WALL
WALL 4-12mmØ VERT. BARS
MORTAR FILLER W/ OPENING W/ 10mmØ TIES; 1 @ 50, 2 @
10MMØ HORZ. BAR 100, REST @ 200mm O.C.
(TYPICAL)

10MMØ VERT. BARS

300
AT 600 MM.O.C.
FINISH FLOOR LEVEL (TYPICAL)

300
16MMØ DOWEL

12Ø
MORTAR FILLER W/ 10MMØ HORZ. BARS
1-10MMØ VERT. BAR AT EVERY 3 LAYER
(TYPICAL) OF CHB

WALL FOOTING
1B TYP. CHB WALL OPENING ELEV.
S-3 NOT TO SCALE

1A TYPICAL MASONRY ELEVATION 1C DETAIL OF STIFFENER


S-3 NOT TO SCALE S-3 NOT TO SCALE 1:20 M.

1 STANDARD DETAILS
NOT TO SCALE
S-3

PROJECT TITLE: SHEET CONTENTS : DRAWN BY : DESIGNED BY : CHECKED/REVIEWED BY : APPROVED : SET NO. SHEET NO.
RECOMMENDING APPROVAL :
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
LOCAL INFRASTRUCTURE BUILDINGS S-3
BUKIDNON SECOND
PROGRAM and other STRUCTURES -STANDARD DETAILS
PDS 10
Construction of Multi-Purpose Building
DISTRICT ENGINEERING OFFICE (Office Building) Date Published:
REGIONAL OFFICE X
ANNA MAE R. BALASABAS APRIL JOAN B. REPOLIDON NORMA A. OGABANG MANUEL D. VARIAS, Jr. LIBERATO S. TAN, Jr. 7 19
Pinamaloy, Don Carlos, Bukidnon
LOCATION : Date Created:

2020
Brgy. Kawilihan, Don Carlos, Bukidnon DRAFTSMAN ENGINEER II CHIEF, PLANNING and DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER L I P 2020
A B C D A B C D

F1C1 F1C1 F1C1 F1C1


WF-1 WF-1 WF-1

1 1
RB-1 RB-1 RB-1

WF-2

WF-2

WF-2
WF-2 WF-2 WF-2
100mm THK. SLAB ON GRADE
(CLASS B) W/ 10mm Ø TEMP.
BARS @ 500mm C.O.
WF-1

WF-1

WF-1

WF-1
BOTHWAYS

RB-1

RB-1

RB-1

RB-1
RB-1 RB-1 RB-1
2 2
WF-1 WF-1 WF-1
F1C1 F1C1 F1C1 F1C1
WF-1

WF-1

RB-1

RB-1

RB-1

RB-1
F1C2 F1C2 F1C2 F1C2
RB-1 RB-1 RB-1
3 WF-1 WF-1 3
WF-1

WF-1
WF-1

1 FOUNDATION PLAN 2 ROOF BEAM FRAMING PLAN


SCALE 1:60m SCALE 1:60m
S-4 S-4

PROJECT TITLE: SHEET CONTENTS : DRAWN BY : DESIGNED BY : CHECKED/REVIEWED BY : APPROVED : SET NO. SHEET NO.
RECOMMENDING APPROVAL :
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
LOCAL INFRASTRUCTURE BUILDINGS -FOUNDATION PLAN S-4
BUKIDNON SECOND
PROGRAM and other STRUCTURES -ROOF BEAM FRAMING PLAN PDS 11
Construction of Multi-Purpose Building
DISTRICT ENGINEERING OFFICE (Office Building) Date Published:
REGIONAL OFFICE X
ANNA MAE R. BALASABAS APRIL JOAN B. REPOLIDON NORMA A. OGABANG MANUEL D. VARIAS, Jr. LIBERATO S. TAN, Jr. 7 19
Pinamaloy, Don Carlos, Bukidnon
LOCATION : Date Created:

2020
Brgy. Kawilihan, Don Carlos, Bukidnon DRAFTSMAN ENGINEER II CHIEF, PLANNING and DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER L I P 2020
C1 C2 BEAM SCHEDULE OF REINFORCE BEAM STIRRUPS/
0.30m 0.25m
MARK SUPPORT MID-SPAN SUPPORT HOOPS

4-16mm Ø MAIN
4-16mm Ø MAIN VERTICAL BARS 0.25m 3-20mm DIA. 0.25m 2-20mm DIA. 0.25m 3-20mm DIA.
VERTICAL BARS HORIZONTAL BARS HORIZONTAL BARS HORIZONTAL BARS 10mm DIA. STIRRUPS

0.25m
SPACED @ 1-0.05m,

0.30m
10mm Ø LATERAL TIES 10mm Ø LATERAL TIES
RB-1 6-0.10m, REST @ 0.20m

0.35m
0.35m

0.35m
SPACED 2@50mm; SPACED 1@50mm; O.C
4@100mm; REST @ 4@100mm; REST @ 3-20mm DIA. 3-20mm DIA. 3-20mm DIA.
150mm TO MIDSPAN HORIZONTAL BARS HORIZONTAL BARS HORIZONTAL BARS
150mm TO MIDSPAN

TOP BARS BOTTOM BARS MIDBAR TOP BARS

L=SPAN
L/3 L/3
0.30m

2 - 100 x 100mm
SQUARE TUBE LALLY
COLUMN

4-16mm Ø MAIN 6mm THK. BASE PLATE


FINISH FLOOR LINE
VERTICAL BARS L/4 L/2 L/4

4-12mmØ x300mm
ANCHOR BOLT w/ NUT & 1 TYPICAL BEAM DETAILS
10mm Ø LATERAL TIES WASHER SCALE 1:30m
SPACED 1@50mm; 10mm Ø LATERAL S-7
TIES
4@100mm; REST @ 150mm
SPACED 4@50mm;
TO MIDSPAN 4@100mm; REST @
FINISH GRADE LINE
200mm TO MIDSPAN
VARIES

NGL

NATURAL GRADE LINE


10mm DIA. HOR. BARS
@ 600mm. O.C.
1.30m

MIN
0.60m
10mm DIA. VERT. BARS
4-16mm Ø DEFORM @ 600mm. O.C
8-16mm Ø DEFORM STEEL SECTION

0.10m 0.20m
STEEL
REINFORCEMENT BARS SCALE 1:20m REINFORCEMENT BARS 3-12mm DIA. EQUALLY
SPACED EQUALLY EACH SPACED EQUALLY CONTINUOUS BARS
EACH WAYS
WAYS
12mm DIA. @ 300mm. O.C.
0.30m

2 - 100 x 100mm SQUARE


TUBE LALLY COLUMN WF-1 0.40m
6mm THK. BASE PLATE
F2P2
3-10mmØ LONGITUDINAL
0.40 BARS
100mm thk. CHB W/
SECTION 25mm thk. SMOOTH
PLASTER CEMENT
1.00m
F1C1 4-12mmØ x300Mmm BOTH SIDE PAINTED
FINISH
0.40

ANCHOR BOLT w/ NUT &


PLAN (BASE ANCHORAGE) WASHER 10mmØ VERT. BARS @
1.00m 600mm O.C. 0.40
SCALE 1:10m

4-16mm Ø DEFORM 10mmØ HOR. BARS


STEEL REINFORCEMENT @EVERY 3rd LAYER 0.40
BARS SPACED EQUALLY COURSE OF CHB
EACH WAYS
8-16mm Ø DEFORM STEEL F2P2 0.08
SLAB REBARS
0.40
1.00m

REINFORCEMENT BARS MAIN FFL 0.75


SPACED EQUALLY EACH TOILET FFL
WAYS PLAN 0.39
SCALE 1:20m 0.23

3 PEDESTAL AND FOOTING DETAILS 0.40

S-5 SCALE AS ASSIGN 3-10mmØ LONGITUDINAL


PLAN
0.39 BARS
F1 WF-2 10mmØ TRANSVERSE BARS
SPACED @ 400mm O.C.
2 FOOTING & COLUMN DETAILS WALL FOOTING DETAILS
4
SCALE 1:20m
S-5 SCALE 1:15m
S-5

PROJECT TITLE: SHEET CONTENTS : DRAWN BY : DESIGNED BY : CHECKED/REVIEWED BY : APPROVED : SET NO. SHEET NO.
RECOMMENDING APPROVAL :
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
LOCAL INFRASTRUCTURE BUILDINGS -TYPICAL BEAM DETAILS S-5
BUKIDNON SECOND
PROGRAM and other STRUCTURES
-FOOTING & COLUMN DETAILS PDS 12
Construction of Multi-Purpose Building
DISTRICT ENGINEERING OFFICE (Office Building) -WALL FOOTING DETAILS Date Published:
REGIONAL OFFICE X
ANNA MAE R. BALASABAS APRIL JOAN B. REPOLIDON NORMA A. OGABANG MANUEL D. VARIAS, Jr. LIBERATO S. TAN, Jr. 7 19
Pinamaloy, Don Carlos, Bukidnon
LOCATION : Date Created:

2020
Brgy. Kawilihan, Don Carlos, Bukidnon DRAFTSMAN ENGINEER II CHIEF, PLANNING and DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER L I P 2020
38mmØ STAINLESS
BALUSTRE
38mmØ STAINLESS
HANDRAIL

0.24m

4.31m
0.68m

1.50m

0.40m0.45m
0.22m
0.17m
A B C D
1.30m

1.50m 2.71m 100x50x1.5mm C-PURLINS


1.50m LANDING @700mm O.C.
FRONT VIEW 11.83m

38mmØ STAINLESS 3.91m 4.01m 3.91m


3.55m
HANDRAIL
2.81m
38mmØ STAINLESS
BALUSTRE
2.05m 0.24m
12mmØ PLAIN ROUND BAR
0.68m SAG ROD @ MID BAY
STAGGERED
0.45m
0.17m
1
1.30m 4.21m

REAR VIEW
P L A N

TRUSS

TRUSS

TRUSS

TRUSS
38mmØ STAINLESS 38mmØ STAINLESS
4.81m
BALUSTRE HANDRAIL
38mmØ STAINLESS 38mmØ STAINLESS
HANDRAIL BALUSTRE

0.24m
7.20m

0.68m
0.40m

2
1.95m 1.50m

RIGHT SIDE VIEW


2.39m

38mmØ STAINLESS 12x300 FIBER CEMENT


HANDRAIL
FASCIA BOARD @ 4x25mm
38mmØ STAINLESS
BALUSTRE
3 ANGLE BAR

0.24m

0.18m 0.68m

0.22m

ISOMETRIC VIEW
3.45m

LEFT SIDE VIEW

1 R A M P D E T A I L S
S-6 SCALE 1:50m
2 R O OF FR A MIN G P LA N
SCALE 1:50m
S-6

PROJECT TITLE: SHEET CONTENTS : DRAWN BY : DESIGNED BY : CHECKED/REVIEWED BY : APPROVED : SET NO. SHEET NO.
RECOMMENDING APPROVAL :
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
LOCAL INFRASTRUCTURE BUILDINGS -RAMP DETAILS S-6
BUKIDNON SECOND
PROGRAM and other STRUCTURES
-ROOF FRAMING PLAN PDS 13
Construction of Multi-Purpose Building
DISTRICT ENGINEERING OFFICE (Office Building) Date Published:
REGIONAL OFFICE X
ANNA MAE R. BALASABAS APRIL JOAN B. REPOLIDON NORMA A. OGABANG MANUEL D. VARIAS, Jr. LIBERATO S. TAN, Jr. 7 19
Pinamaloy, Don Carlos, Bukidnon
LOCATION : Date Created:

2020
Brgy. Kawilihan, Don Carlos, Bukidnon DRAFTSMAN ENGINEER II CHIEF, PLANNING and DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER L I P 2020
0.40mm THK. G.I. ROOFING
SHEETS RIB TYPE
LONG SPAN PRE-PAINTED
4 SEE DETAILS 2 - 50 X 50 X 4mm BOTTOM
S-7 CHORD 0.25

150x50x2mm RECTUBE
MAIN RAFTER 0.20 200 x 200 x 10mm BLIND
ANCHOR PLATE w/ 4-12 mm Ø
ROUND BAR ANCHOR
50x50x2mm RECTUBE 200 x 200 x 10mm BLIND
PURLIN ANCHOR PLATE w/ 4-12 mm Ø
4-10mmØx100mm 2.81m
EXPANSION BOLT w/ 0.70m ROUND BAR ANCHOR

0.20

0.25
NUT & WASHER 0.70m
0.70m
0.70m

8mm THK. BASE PLATE


PLAN
SECTION
4 ANCHORAGE DETAILS 3 SHED ROOF RAFTER DETAILS
SCALE 1:10m SCALE 1:20m
S-7 S-7
5 TRUSS ANCHOR DETAILS
SCALE 1:10m
S-7

A B C D
14.28m
1.20m 3.94m 4.01m 3.94m 1.20m
4x25mm ANGLE BAR

0.40m 0.40m 0.40m 0.40m


0.70m 150x50x2mm RECTUBE
MAIN RAFTER
0.27m

0.27m
12x300 0.70m
FIBER CEMENT
FASCIA BOARD 2.81m
0.70m 50x50x2mm RECTUBE
12x300
FIBER CEMENT
FASCIA BOARD 1 0.70m
150x50x2mm RECTUBE

6 FASCIA FRAME ON WOODEN FRAME DETAILS


SCALE 1:15 mtrs.
S-7

2 R O OF FR A MI NG P LA N
SCALE 1:50m
S-7

1 2
100x50x1.5mm C-PURLINS
0.73m @700mm O.C.
0.75m
7.54m 0.75m
0.75m
6 0.75m
SEE DETAILS 0.75m 50x50x4mm ANGLE BAR
S-7 0.75m
WEB MEMBER
0.75m
0.75m
0.73m

2-50x50x4mm ANGLE
BAR TOP AND BOTTOM
CHORD
TRUSS 1
0.40m

5
SEE DETAILS
S-7

1 R O O F F R A MI N G P L A N
SCALE 1:20m
S-7

PROJECT TITLE: SHEET CONTENTS : DRAWN BY : DESIGNED BY : CHECKED/REVIEWED BY : APPROVED : SET NO. SHEET NO.
RECOMMENDING APPROVAL :
Republic of the Philippines
LOCAL INFRASTRUCTURE BUILDINGS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BUKIDNON SECOND
PROGRAM and other STRUCTURES
PDS 14
Construction of Multi-Purpose Building
DISTRICT ENGINEERING OFFICE (Office Building) Date Published:
REGIONAL OFFICE X
ANNA MAE R. BALASABAS APRIL JOAN B. REPOLIDON NORMA A. OGABANG MANUEL D. VARIAS, Jr. LIBERATO S. TAN, Jr. 7 19
Pinamaloy, Don Carlos, Bukidnon
LOCATION : Date Created:

2020
Brgy. Kawilihan, Don Carlos, Bukidnon DRAFTSMAN ENGINEER II CHIEF, PLANNING and DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER L I P 2020
12mmØ G.I. PIPE (CWL) 5 0 m m Ø P V C P I P E ( V P )

SEPTIC
TANK

12mm DIA. G.I. CWL


CV
1 0 0 m m Ø P V C P I P E ( S P )
M

GV
FROM
MAIN
WATER
LINE

1 COLD WATER LINE LAYOUT 2 SOLID WASTE LINE LAYOUT


SCALE 1:60m SCALE 1:60m
P-1 P-1

5
0
m
m
CV L
M CW Ø
GV . G.I.
A P
DI V
m
F 12m C
WA MAROM
LINTERIN P
E I
P
E
12 (
mm 1
0 V
0 P
Ø m )
G. m
I. Ø
PI P
V
PE C
(C P
I P
WL E
) ( S
P
)

S
TAEPT
NK IC

COLD WATER LINE ISOMETRIC SOLID WASTE LINE ISOMETRIC


3 V I E W 4 V I E W
SCALE NDTS SCALE NDTS
P-1 P-1

PROJECT TITLE: SHEET CONTENTS : DRAWN BY: DESIGNED BY: CHECKED/REVIEWED BY : APPROVED : SET NO. SHEET NO.
RECOMMENDING APPROVAL :
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
LOCAL INFRASTRUCTURE PROGRAM
-COLD WATER LINE LAYOUT
P-1
BUKIDNON SECOND
BUILDINGS and other STRUCTURES
-SOLID & WASTE LINE LAYOUT PDS 15
Construction of Multi Purpose Building
DISTRICT ENGINEERING OFFICE Date Published:
(Office Building) -COLD WATER LINE ISOMETRIC VIEW
REGIONAL OFFICE X
-SOLID & WASTE LINE ISOMETRIC VIEW ANNA MAE R. BALASABAS SIDNEY H. FLORES NORMA A. OGABANG MAUEL D. VARIAS, Jr. LIBERATO S. TAN, Jr. 2 15
Pinamaloy, Don Carlos, Bukidnon
LOCATION : Date Created:

2020
Brgy. Kawilihan, Don Carlos, Bukidnon DRAFTSMAN ARCHITECT II CHIEF, PLANNING and DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER L I P 2020
100mm THK. CONC. SLAB W/ 10mm Ø
TOP BARS @ 200mm O.C. AND 12mm Ø
BOTTOM BARS @ 200mm O.C. BOTH WAYS LEGEND:
MANHOLE COVER 2.10

SEE DETAIL CB CATCH BASIN


1.00 1.00
CDP CONCRETE DRAIN PIPE

0.10
0.15
CO CLEAN OUT
MANHOLE MANHOLE MANHOLE CV CHECK VALVE

0.30
HB HOSE BIB
AIRSPACE AIRSPACE AIRSPACE FD FLOOR DRAIN

0.30
AIRSPACE GICWL GALVANIZED IRON COLD WATER LINE
WATER OUTLET WATER WATER GICWR GALVANIZED IRON COLD WATER RISER
WATER INLET
LEVEL LEVEL LEVEL GV GATE VALVE
LEVEL
MH MANHOLE
PVCDS POLYVINYL CHLORIDE DOWNSPOUT
PVCDP POLYVINYL CHLORIDE DRAIN PIPE

1.50
PVCSP POLYVINYL CHLORIDE SOIL PIPE

1.50
LEACHING DIGESTIVE LEACHING LEACHING 100 mm THK. CHB w/
100 mm THK. CHB w/ PVCVAC POLYVINYL CHLORIDE VENT, ACROSS CEILING
CHAMBER

1.30
CHAMBER CHAMBER CHAMBER 10mmØ VERT. & HOR. BAR PVCVP POLYVINYL CHLORIDE VENT PIPE

1.20
10mmØ VERT. & HOR. BAR
@ 200mm O.C. E.W @ 200mm O.C. E.W PVCVS POLYVINYL CHLORIDE VENT STACK
20mm PLASTER FINISH 20mm PLASTER FINISH PVCVTR POLYVINYL CHLORIDE VENT THROUGH WALL
20mm PLASTER FINISH 20mm PLASTER FINISH
w/ WATER PROOFING w/ WATER PROOFING w/ WATER PROOFING w/ WATER PROOFING PVCWP POLYVINYL CHLORIDE WASTE PIPE
PVCWS POLYVINYL CHLORIDE WASTE STACK
RD ROOD DRAIN
UD URINAL DRAIN

0.10
2% SLOPE WC WATER CLOSET
LAV LAVATORY
CS COUNTER SINK
GRAVEL BED GRAVEL
BED
1.00 1.00 1.00 1.00

2.10 2.10

2.50
GENERAL NOTES:
4b SECTION DETAILS 4c SECTION DETAILS 1. GRADES OF HORIZONTAL PIPING
RUN ALL HORIZONTAL PIPING IN PERCENT ALIGNMENT AND AT /
SCALE 1:50m
P-4 SCALE 1:50m
P-4 FORM GRADE NOT LESS THAN TWO PERCENT (2%).
2. CHANGE IN DIRECTION
ALL CHANGE IN DIRECTION SHALL BE MADE BY APPROPRIATE AS
OF FORTY-FIVE DEGREES (45°) WYE, LONG SWEEP QUARTER
BEND, SIXTH-EIGHT OR SIXTEEN BEND. WHEN THE CHANGE OF
2.10 FLOW IS FROM HORIZONTAL TO VERTICAL A SINGLE 1/8 BEND
COMBINATION MAYBE USED ON VERTICAL STACKS AND SHORT
2.10
QUARTER BENDS MAYBE USED ON WASTE LINE, TEE AND
CROSSES MAYBE USED IN BENT PIPES.
4c 3. PROHIBITED FITTINGS
NO DOUBLE HUB OR TEE BRANCH SHALL BE USED ON
HORIZONTAL SOIL AND WASTE LINES, THE DRILLING AND TAPPING
OUTLET OF HOUSE DRAIN, WASTE OR VENT PIPES AND USED TO SADDLE
HUB AND BEND ARE PROHIBITED.
4. PIPE CLEAN-OUTS
CLEAN-OUTS ARE REQUIRED UNDER THE FOLLOWING CONDITIONS
a) EVERY CHANGE OF HORIZONTAL DIRECTION EXCEEDINGLY TWENTY
CO 10mmØ BAR TWO AND ONE-HALF DEGREES (22 1/2")
HANDLE
b) ONE AND ONE-HALF METERS (1.50m) INSIDE THE PROPERTY
LINES BEFORE THE HOUSE DRAINAGE CONNECTION.
MANHOLE MANHOLE c) EVERY FIFTEEN METERS (15.00m) IN HORIZONTAL RUN OF PIPES
d) AT THE END OF ANY HORIZONTAL PIPE LINES.
5. THE DIGESTION CHAMBER OF SEPTIC VAULT MUST BE
250 100 250 WATERPROOFED.
3-10mmØ (E.W.) 6. NOT LESS THAN 0.30 METER OF AIR SPACE MUST BE LEFT
BETWEEN THE TOP OF THE SEWAGE AND THE UNDER PART OF
VAULT ROOF SLAB.
2.30

2.10
2.10

7. NO SEPTIC VAULT SHALL BE CONSTRUCTED UNDER THE BUILDING


8. ALL PLUMBING WORKS SHALL BE UNDER THE SUPERVISION OF A
LICENSED MASTER PLUMBER AND A LICENSED PLUMBING
100mm THK. CONC. SLAB W/ 10mm Ø CO CONTRACTOR.
TOP BARS @ 200mm O.C. AND

100
12mm Ø BOTTOM BARS @ 200mm
O.C. BOTH WAYS MANHOLE
_________________
0.50 0.50
INLET CO CO
4b i. LIVE LOAD _______________ 1000Pa
0.50 500
ii ALLOWABLE STRESSES
1. CONCRETE
a. FOR FOOTING, BEAMS AND SLABS
fc" - 20 MPa
2. CONCRETE MASONRY UNITS
1.00
4d MANHOLE COVER DETAILS (LOAD BEARING CHB)
SCALE 1:40m fm' - 6.90 MPa, fm = 2.41 MPa
P-4 3. REINFORCING STEEL BARS
4a PLAN DETAILS FOR BARS SMALLER THAN 16mmØ
SCALE NDTS fy = 230 MPa
P-4 4. ASSUMED ALLOWABLE BEARING CAPACITY
Y = 100KPa
4 SEPTIC TANK DETAILS
as assign
P-4 SCALE
WATER TABLE IS ________ BELOW GROUND LEVEL

PROJECT TITLE: SHEET CONTENTS : DRAWN BY: DESIGNED BY: CHECKED/REVIEWED BY : APPROVED : SET NO. SHEET NO.
RECOMMENDING APPROVAL :
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
LOCAL INFRASTRUCTURE PROGRAM
-GENERAL NOTES
P-1
BUKIDNON SECOND
BUILDINGS and other STRUCTURES
-SEPTIC TANK DETAILS PDS 16
Construction of Multi Purpose Building
DISTRICT ENGINEERING OFFICE Date Published:
(Office Building)
REGIONAL OFFICE X
ANNA MAE R. BALASABAS SIDNEY H. FLORES NORMA A. OGABANG MAUEL D. VARIAS, Jr. LIBERATO S. TAN, Jr. 2 15
Pinamaloy, Don Carlos, Bukidnon
LOCATION : Date Created:

2020
Brgy. Kawilihan, Don Carlos, Bukidnon DRAFTSMAN ARCHITECT II CHIEF, PLANNING and DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER L I P 2020
3500 mm

1800 mm 1800 mm

2 ELECTRICAL RISER DIAGRAM 3 SINGLE LINE DIAGRAM


E-1 SCALE SCALE
NDTS E-1 NDTS

THIS SITE
COORDINATES:
7.665175, 124.856120

1 LOCATION MAP
SCALE NDTS
E-1

PROJECT TITLE: SHEET CONTENTS : DRAWN BY: DESIGNED BY: CHECKED/REVIEWED BY : APPROVED : SET NO. SHEET NO.
RECOMMENDING APPROVAL :
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
LOCAL INFRASTRUCTURE PROGRAM - LOCATION MAP E-1
BUKIDNON SECOND
BUILDINGS and other STRUCTURES
- ELECTRICAL RISER DIAGRAM PDS 17
Construction of Multi Purpose Building
DISTRICT ENGINEERING OFFICE Date Published:
(Office Building) - SINGLE PHASE LINE DIAGRAM
REGIONAL OFFICE X
ANNA MAE R. BALASABAS ENRICO M. PINOTE NORMA A. OGABANG MAUEL D. VARIAS, Jr. LIBERATO S. TAN, Jr. 3 19
Pinamaloy, Don Carlos, Bukidnon
LOCATION : Date Created:

2020
Brgy. Kawilihan, Don Carlos, Bukidnon DRAFTSMAN ELECTRICAL ENGINEER II CHIEF, PLANNING and DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER L I P 2020
M

1 SCHEDULE OF LOADS AND COMPUTATION


SCALE
E-2 NDTS

PROJECT TITLE: SHEET CONTENTS : DRAWN BY: DESIGNED BY: CHECKED/REVIEWED BY : APPROVED : SET NO. SHEET NO.
RECOMMENDING APPROVAL :
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
LOCAL INFRASTRUCTURE PROGRAM - SCHEDULE OF LOADS AND COMPUTATION E-2
BUKIDNON SECOND
BUILDINGS and other STRUCTURES
- LEGEND PDS 18
Construction of Multi Purpose Building
DISTRICT ENGINEERING OFFICE Date Published:
(Office Building)
REGIONAL OFFICE X
ANNA MAE R. BALASABAS ENRICO M. PINOTE NORMA A. OGABANG MAUEL D. VARIAS, Jr. LIBERATO S. TAN, Jr. 3 19
Pinamaloy, Don Carlos, Bukidnon
LOCATION : Date Created:

2020
Brgy. Kawilihan, Don Carlos, Bukidnon DRAFTSMAN ELECTRICAL ENGINEER II CHIEF, PLANNING and DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER L I P 2020
W
2

PALNT BOX
PALNT BOX
LANDING
LANDING

1 LIGHTING LAYOUT 2 POWER LAYOUT


SCALE
SCALE
E-3 NDTS
E-3 NDTS

PROJECT TITLE: SHEET CONTENTS : DRAWN BY: DESIGNED BY: CHECKED/REVIEWED BY : APPROVED : SET NO. SHEET NO.
RECOMMENDING APPROVAL :
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
LOCAL INFRASTRUCTURE PROGRAM - LIGHTING LAYOUT E-3
BUKIDNON SECOND
BUILDINGS and other STRUCTURES
- POWER LAYOUT PDS 19
Construction of Multi Purpose Building
DISTRICT ENGINEERING OFFICE Date Published:
(Office Building)
REGIONAL OFFICE X
ANNA MAE R. BALASABAS ENRICO M. PINOTE NORMA A. OGABANG MAUEL D. VARIAS, Jr. LIBERATO S. TAN, Jr. 3 19
Pinamaloy, Don Carlos, Bukidnon
LOCATION : Date Created:

2020
Brgy. Kawilihan, Don Carlos, Bukidnon DRAFTSMAN ELECTRICAL ENGINEER II CHIEF, PLANNING and DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER L I P 2020

You might also like