Industrial Training 2016-2020 Batch
Institute: Pandit Deendayal Petroleum University
Branch : Civil Engineering
Roll No.: 16BCL101
Name: Vaishvik Thakkar
Mobile No.: 8320027506
E-mail ID: thakkarvaishvik@gmail.com
INTERNING AT:
List Of Departments With Main
functions.
1. Purchase: Procurement of materials.
Designation: Partner
Ratnam group has been one of the pioneers when it comes to real estate in
Vadodara. We have over 30 years of legacy in Real Estate development with
over 40 residential and commercial projects delivered to customers who are
ultimately satisfied by it. We have always believed in a sense of connection
balanced by a sense of direction and progress. We are always here for our
customers with our arms wide open to wrap you in with love and utmost
care. We always customise our work to get the desired result for our
customers. That, in fact, is our forte. Our group stands tall as we expand the
real estate horizon of Vadodara, the place that is full of diversity,
opportunity and is a place where your heart will find peace.
OUR VALUES
1. Structure Stability
2. Innovative
3. Technology
4. Superior Quality
INTRODUCTION AND BRIEF OF PROJECT
Description:
1. CCTVCameraSecurity
2. Earthquake Resistant
3. Gated Community
4. RO System
5. Security Cabin
SERVICES
1. Anti-termite treatment
ECO FRIENDLY
1. PavedCompound
1. MultipurposeHall
SOME IMAGES OF THE SITE ELEVATION, LOCALITY,
BROCHURE,PLANS
WORK DONE DURING INTERNSHIP
WEEK 1:
● Footings are an important part of foundation
construction. They are typically made of concrete with
rebar reinforcement that has been poured into an
excavated trench. The purpose of footings is to support the
foundation and prevent settling. Footings are especially
important in areas with troublesome soils.
●
Step1: Positioning of Footing, drafting the plan by the
structural engineer, which gives the dimensions of the
footing (the picture of the footing plan is attached in this
sheet below)
WEEK 2:
● Before the excavation for the proposed foundation was
commenced, the site was cleared of vegetation,
brushwood, stumps of trees etc. Roots of the trees were
removed to at least 30 cm below the foundation level. The
pits formed due to roots of trees, old foundations etc. were
filled up with soil and compacted with the help of a roller.
● Then we Excavated a trench on earth for the footing. The
size of the trench was 1′ bigger in both sides than the
footing size. It is done for placing and removing shutter
easily. JCB machine was used as an Excavator.
● The depth of a trench will depend on the earth
conditions and dimensions of footing.
Materials used during Setting up of Layout
1. Leveling Instrument
2. Long Nails
3. Hammers
4. Bricks
5. Cement
6. Screen Sand
7. Lime Powder
8. Theodolite
WEEK 3:
Step: 1- We provided formwork as specified in the
plan for different columns, We used steel formwork in
this purpose.
WEEK 4:
- After the concrete has gained proper strength, we
remove the formwork, after we have repaired the
honeycomb structures