CONCRETE POURING PERMIT

PROJECT: Aruga Mactan Sales Lounge and Model Unit

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

Oct. 31, 2019 CPP-002, Substructure CPP-002


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Lower Ground, Tower A Area 2-3/ Ae-Af Footing (MF-2) Oct. 5, 2019
REQUESTED BY :

Omicron Rex E. Calma


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Liloan Direct pouring Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
5,000psi 3/4 @ 28 days 4", 6"-8" if PCD 172.45 m3 Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

Field Operations Group hereby certifies that the Works comply with Approved FCD and Shop Drawings

PLUMBNESS/LEVEL LINE/  GRADE REBARS FORM INSERTS AND BLOCK  CLEAN  UP Remarks
IMBEDS OUTS

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Rex E. Calma Name: Name:
Signature: Signature: Signature:
(Company) Date: Oct. 31, 2019 Date: Date:
PLUMBING/SANITARY Name: N/A Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: N/A Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: N/A Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: N/A Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Rolan Cabilao Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the 
work  specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and 
materials  comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval 
of  this  request.

APPROVED BY : NOTED BY :

___________________________________________ _________________________________________________
Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

04-Feb-20 Substructure Works CPP-004


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :
4/Ac - Ad, 1 - 2/Ad,
Zone A, Foundation Level COF - 3, FTB - 1 & FTB - 2 Wed, 05-Feb-2020
2/Ae - Af, 3/Ad - Ae
REQUESTED BY :

Omicron Alexis Mercado/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
5,000psi 3/4 @ 28 days 4", 6", 8" if PCD 68 m3 Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

Field Operations Group hereby certifies that the Works comply with Approved FCD and Shop Drawings

PLUMBNESS/LEVEL LINE/  GRADE REBARS FORM INSERTS AND BLOCK  CLEAN  UP Remarks
IMBEDS OUTS

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Alexis Mercado Name: Name:
Signature: Signature: Signature:
(Company) Date: 04-Feb-20 Date: Date:
PLUMBING/SANITARY Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the 
work  specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and 
materials  comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval 
of  this  request.

APPROVED BY : NOTED BY :

___________________________________________ _________________________________________________
Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

23-Feb-20 Substructure Works CPP-005


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :
RC -1, RC - 2, RC - 3, RC - 3A, RC - 4, RC - 5,
Zone A, Foundation Level 1 - 4/Ac - Af Wed, 26-Feb-2020
RSW - 1
REQUESTED BY :

Omicron Construction, Inc. Alexis Mercado/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi 3/4 @ 28 days 4", 6", 8" if PCD 76 m3 Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

Field Operations Group hereby certifies that the Works comply with Approved FCD and Shop Drawings

PLUMBNESS/LEVEL LINE/  GRADE REBARS FORM INSERTS AND BLOCK  CLEAN  UP Remarks
IMBEDS OUTS

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Alexis Mercado Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 23-Feb-20 Date: Date:
PLUMBING/SANITARY Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Jeffrey Parungao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 23-Feb-20 Date: Date:
FIREPRO/MECH Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the 
work  specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and 
materials  comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of 
this  request.

APPROVED BY : NOTED BY :

___________________________________________ _________________________________________________
Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

24-Feb-20 Substructure Works CPP-006


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone A, Foundation Level 4 - 5'/Bb - Bc RWF - 3, UWTWF - 1, UWTWF - 2 Wed, 26-Feb-2020

REQUESTED BY :

Omicron Construction, Inc. Alexis Mercado/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
5000psi 3/4 @ 28 days 4", 6", 8" if PCD 22 m3 Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

Field Operations Group hereby certifies that the Works comply with Approved FCD and Shop Drawings

PLUMBNESS/LEVEL LINE/  GRADE REBARS FORM INSERTS AND BLOCK  CLEAN  UP Remarks
IMBEDS OUTS

ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification C  ­  Work  needs  major  rectification;  Hold 
work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Alexis Mercado Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 24-Feb-20 Date: Date:
PLUMBING/SANITARY Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the 
work  specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and 
materials  comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of 
this  request.

APPROVED BY : NOTED BY :

___________________________________________ _________________________________________________
Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

28-Feb-20 Substructure Works CPP-007


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

RWF - 1, RWF - 2, RWF - 3, UWTWF - 1,


Lower Ground Floor 4-14"/Ca-Cc Sat, 29-Feb-2020
UWTWF - 2

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
5000psi 3/4 @ 28 days 4", 6", 8" if PCD 52m3 Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

Field Operations Group hereby certifies that the Works comply with Approved FCD and Shop Drawings

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification C  ­  Work  needs  major  rectification;  Hold 
work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 28-Feb-20 Date: Date:
PLUMBING/SANITARY Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the 
work  specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and 
materials  comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of 
this  request.

APPROVED BY : NOTED BY :

___________________________________________ _________________________________________________
Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

24-Mar-20 Substructure Works CPP-008


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Tower B & Tower C/Lower Ground Floor 6-14'/Bb/Cb F - 2, F - 3 & F - 5 Sat, 07-Mar-2020

REQUESTED BY :

Omicron Construction, Inc. Alexis Mercado/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Direct Pouring Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
5000psi 3/4 @ 28 days 4", 6", 8" if PCD 23 m3 Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

Field Operations Group hereby certifies that the Works comply with Approved FCD and Shop Drawings

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification C  ­  Work  needs  major  rectification;  Hold 
work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Alexis Mercado Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 04-Mar-20 Date: Date:
PLUMBING/SANITARY Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 04-Mar-20 Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the 
work  specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and 
materials  comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of 
this  request.

APPROVED BY : NOTED BY :

___________________________________________ _________________________________________________
Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

05-Mar-20 Substructure Works CPP-009


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone A/Basement 1 5 - 6/Ac - Af MF - 3 Sat, 07-Mar-2020

REQUESTED BY :

Omicron Construction, Inc. Alexis Mercado/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Direct Pouring Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
1500psi 3/4 @ 28 days 4", 6", 8" if PCD 22 m3 Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

Field Operations Group hereby certifies that the Works comply with Approved FCD and Shop Drawings

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification C  ­  Work  needs  major  rectification;  Hold 
work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Alexis Mercado Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 05-Mar-20 Date: Date:
PLUMBING/SANITARY Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 05-Mar-20 Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the 
work  specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and 
materials  comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of 
this  request.

APPROVED BY : NOTED BY :

___________________________________________ _________________________________________________
Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

10-Mar-20 Substructure Works CPP-010


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone A/Basement 1 5 - 6/Ac - Af MF - 3 Sat, 14-Mar-2020

REQUESTED BY :

Omicron Construction, Inc. Alexis Mercado/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Direct Pouring Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
1500psi 3/4 @ 28 days 4", 6", 8" if PCD 437 m3 Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

Field Operations Group hereby certifies that the Works comply with Approved FCD and Shop Drawings

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification C  ­  Work  needs  major  rectification;  Hold 
work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Alexis Mercado Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 10-Mar-20 Date: Date:
PLUMBING/SANITARY Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 10-Mar-20 Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the 
work  specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and 
materials  comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of 
this  request.

APPROVED BY : NOTED BY :

___________________________________________ _________________________________________________
Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

18-Mar-20 Substructure Works CPP-011


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone A/Lower Ground Floor 1 - 4/Ac RW - 3 Saturday, March 21, 2020

REQUESTED BY :

Omicron Construction, Inc. Alexis Mercado/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
5000psi 3/4 @ 28 days 4", 6", 8" if PCD 10 m3 Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

Field Operations Group hereby certifies that the Works comply with Approved FCD and Shop Drawings

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification C  ­  Work  needs  major  rectification;  Hold 
work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Alexis Mercado Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 18-Mar-20 Date: Date:
PLUMBING/SANITARY Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
ELECTRICAL / AUX Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
FIREPRO/MECH Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
ARCHITECTURAL Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
SAFETY Name: Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 18-Mar-20 Date: Date:
OTHERS Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

___________________________________________ _________________________________________________
Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

22-Mar-20 Substructure Works CPP-012


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone B/Basement 1 7 - 9/Bc - Bd MF - 4 Sunday, March 22, 2020

REQUESTED BY :

Omicron Construction, Inc. Alexis Mercado/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
5000psi 3/4 @ 28 days 4", 6", 8" if PCD 250 m3 Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

Field Operations Group hereby certifies that the Works comply with Approved FCD and Shop Drawings

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification C  ­  Work  needs  major  rectification;  Hold 
work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Alexis Mercado Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 22-Mar-20 Date: Date:
PLUMBING/SANITARY Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
ELECTRICAL / AUX Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
FIREPRO/MECH Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
ARCHITECTURAL Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
SAFETY Name: Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 22-Mar-20 Date: Date:
OTHERS Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

___________________________________________ _________________________________________________
Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

04-May-20 Substructure Works CPP-013


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

RC-1, RC-2, RC-3, RC-3A, RC-4, RC-5 & RWS -


Zone A/LGF/Basement 1 1 - 6/Ac - Af 07-May-20
5

REQUESTED BY :

Omicron Construction, Inc. Alexis Mercado/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi 3/4 @ 28 days 4", 6", 8" if PCD 24 m3 Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

Field Operations Group hereby certifies that the Works comply with Approved FCD and Shop Drawings

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification C  ­  Work  needs  major  rectification;  Hold 
work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Alexis Mercado Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 04-May-20 Date: Date:
PLUMBING/SANITARY Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
ELECTRICAL / AUX Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
FIREPRO/MECH Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
ARCHITECTURAL Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
SAFETY Name: Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 04-May-20 Date: Date:
OTHERS Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

___________________________________________ _________________________________________________
Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

04-May-20 Substructure Works CPP-014


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

COF - 4, COF - 5, MF - 7, MF - 8, RW - 1, RW - 2,
Zone A/Zone B/Zone C/Basement 1 4 - 14"/Ca - Cd/Be -Bf RW - 3, UWTW - 1, UWTW - 2 & FTB -1 07-May-20

REQUESTED BY :

Omicron Construction, Inc. Alexis Mercado/QS Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
5000psi 3/4 @ 28 days 4", 6", 8" if PCD 786 m3 Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification C  ­  Work  needs  major  rectification;  Hold 
work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Alexis Mercado Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 04-May-20 Date: Date:
PLUMBING/SANITARY Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
ELECTRICAL / AUX Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
FIREPRO/MECH Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
ARCHITECTURAL Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
SAFETY Name: Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 04-May-20 Date: Date:
OTHERS Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

___________________________________________ _________________________________________________
Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

21-May-20 Substructure Works CPP-015


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone A/Zone B/Zone C/Basement 1 2 - 6/Ac - Af RSW - 1, RSW - 2 & RSW - 5 24-May-20

REQUESTED BY :

Omicron Construction, Inc. Alexis Mercado/QS Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi 3/4 @ 28 days 4", 6", 8" if PCD 27 m3 Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification C  ­  Work  needs  major  rectification;  Hold 
work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Alexis Mercado Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 21-May-20 Date: Date:
PLUMBING/SANITARY Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
ELECTRICAL / AUX Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
FIREPRO/MECH Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
ARCHITECTURAL Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
SAFETY Name: Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 21-May-20 Date: Date:
OTHERS Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

___________________________________________ _________________________________________________
Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

22-May-20 Substructure Works CPP-016


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone B/Basement 1 7-8/BG-Bh F-5&F-6 25-May-20

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
5000psi 3/4 @ 28 days 4", 6", 8" if PCD 12.92 m3 Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification C  ­  Work  needs  major  rectification;  Hold 
work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Alexis Mercado Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 22-May-20 Date: Date:
PLUMBING/SANITARY Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
ELECTRICAL / AUX Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
FIREPRO/MECH Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
ARCHITECTURAL Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
SAFETY Name: Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 22-May-20 Date: Date:
OTHERS Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

___________________________________________ _________________________________________________
Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

22-May-20 Substructure Works CPP-017


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

6/Bf-Bi, Bi, Ci, 14"/Cg-Ci,


Zone B and C/Basement 1 RWF-4 25-May-20
14"/Ca-Cc

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
5000psi 3/4 @ 28 days 4", 6", 8" if PCD 62 m3 Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification C  ­  Work  needs  major  rectification;  Hold 
work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Alexis Mercado Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 22-May-20 Date: Date:
PLUMBING/SANITARY Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
ELECTRICAL / AUX Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
FIREPRO/MECH Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
ARCHITECTURAL Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
SAFETY Name: Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 22-May-20 Date: Date:
OTHERS Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

___________________________________________ _________________________________________________
Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

29-May-20 Substructure Works CPP-018


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone A/Zone B 1 - 5/Ac - Af Cavity 29-May-20

REQUESTED BY :

Omicron Construction, Inc. Alexis Mercado/QS Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Betonval Readyconcrete, Inc./Mandaue City Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
3000psi 3/4 @ 28 days 4", 6", 8" if PCD Varies Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification C  ­  Work  needs  major  rectification;  Hold 
work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Alexis Mercado Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 29-May-20 Date: Date:
PLUMBING/SANITARY Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
ELECTRICAL / AUX Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
FIREPRO/MECH Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
ARCHITECTURAL Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
SAFETY Name: Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 29-May-20 Date: Date:
OTHERS Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

___________________________________________ _________________________________________________
Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

16-Jun-20 Substructure Works CPP-019


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

RC-3, RC-5, RC-6, RC-7, RC-8, RC-9, RSW-2, FTB-1,


Zone B 5-9/Bc-Bf FTB-2 19-Jun-20

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Betonval Readyconcrete, Inc./Mandaue City Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi 3/4 @ 28 days 4", 6", 8" if PCD 61.68 cu.m Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification C  ­  Work  needs  major  rectification;  Hold 
work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 16-Jun-20 Date: Date:
PLUMBING/SANITARY Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
ELECTRICAL / AUX Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
FIREPRO/MECH Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
ARCHITECTURAL Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
SAFETY Name: Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 16-Jun-20 Date: Date:
OTHERS Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

___________________________________________ _________________________________________________
Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

16-Jun-20 Substructure Works CPP-020


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

14'-14", Ci, Bi, 6/Bf-Bi, F-5, RW-1, RW-3, RW-4, RW-10, FTB-1, FTB-2,
Zone B &Zone C 19-Jun-20
7-9/Bc, 7-8/Bf-Bh FTB-3

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Betonval Readyconcrete, Inc./Mandaue City Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
5000psi 3/4 @ 28 days 4", 6", 8" if PCD 148 cu.m Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification C  ­  Work  needs  major  rectification;  Hold 
work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 16-Jun-20 Date: Date:
PLUMBING/SANITARY Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
ELECTRICAL / AUX Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
FIREPRO/MECH Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
ARCHITECTURAL Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
SAFETY Name: Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 16-Jun-20 Date: Date:
OTHERS Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

___________________________________________ _________________________________________________
Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

16-Jun-20 Substructure Works CPP-021


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone B &Zone C 10-11/Cc-Cf MF-6 19-Jun-20

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Betonval Readyconcrete, Inc./Mandaue City Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
5000psi 3/4 @ 28 days 4", 6", 8" if PCD 450 cu.m Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification C  ­  Work  needs  major  rectification;  Hold 
work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 16-Jun-20 Date: Date:
PLUMBING/SANITARY Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
ELECTRICAL / AUX Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
FIREPRO/MECH Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
ARCHITECTURAL Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
SAFETY Name: Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 16-Jun-20 Date: Date:
OTHERS Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

___________________________________________ _________________________________________________
Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

13-Jul-20 Substructure Works CPP-022


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone B &Zone C 12-14'/Ce-Cf MF-8 16-Jul-20

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Betonval Readyconcrete, Inc./Mandaue City Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
5000psi 3/4 @ 28 days 4", 6", 8" if PCD 406 cu.m Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification C  ­  Work  needs  major  rectification;  Hold 
work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 13-Jul-20 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Aljon Agang
Signature: Signature: Signature:
(Company) Date: 13-Jul-20 Date: Date:
ELECTRICAL / AUX Name: n/a Name: Lito Cerdeña Name: Sul Medequillo
Signature: n/a Signature: Signature:
(Company) Date: n/a Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Aljon Agang
Signature: Signature: Signature:
(Company) Date: 13-Jul-20 Date: Date:
ARCHITECTURAL Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
SAFETY Name: Roland Cabilao Name: Ryan Villacorta Name: n/a
Omicron Construction, Inc. Signature: Signature: Signature: n/a
(Company) Date: 13-Jul-20 Date: Date: n/a
OTHERS Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Leandro Almario Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

13-Jul-20 Substructure Works CPP-022


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone B &Zone C 12-14'/Ce-Cf MF-8 16-Jul-20

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Betonval Readyconcrete, Inc./Mandaue City Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
5000psi 3/4 @ 28 days 4", 6", 8" if PCD 406 cu.m Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification C  ­  Work  needs  major  rectification;  Hold 
work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 13-Jul-20 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Aljon Agang
Signature: Signature: Signature:
(Company) Date: 13-Jul-20 Date: Date:
ELECTRICAL / AUX Name: n/a Name: Lito Cerdeña Name: Sul Medequillo
Signature: n/a Signature: Signature:
(Company) Date: n/a Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Aljon Agang
Signature: Signature: Signature:
(Company) Date: 13-Jul-20 Date: Date:
ARCHITECTURAL Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
SAFETY Name: Roland Cabilao Name: Ryan Villacorta Name: n/a
Omicron Construction, Inc. Signature: Signature: Signature: n/a
(Company) Date: 13-Jul-20 Date: Date: n/a
OTHERS Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Leandro Almario Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

17-Jul-20 Substructure Works CPP-024


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone B 5-6/Bc-Bf Columns, RSW, RW at MF-3 20-Jul-20

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Betonval Readyconcrete, Inc./Mandaue City Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi 3/4 @ 28 days 4", 6", 8" if PCD 50 Cu. M Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification C  ­  Work  needs  major  rectification;  Hold 
work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 17-Jul-20 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Aljon Agang
Signature: Signature: Signature:
(Company) Date: 17-Jul-20 Date: Date:
ELECTRICAL / AUX Name: Miko James Dela Cruz Name: Lito Cerdeña Name: Sul Medequillo
Signature: Signature: Signature:
(Company) Date: 17-Jul-20 Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Aljon Agang
Signature: Signature: Signature:
(Company) Date: 17-Jul-20 Date: Date:
ARCHITECTURAL Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
SAFETY Name: Roland Cabilao Name: Ryan Villacorta Name: n/a
Omicron Construction, Inc. Signature: Signature: Signature: n/a
(Company) Date: 17-Jul-20 Date: Date: n/a
OTHERS Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Leandro Almario Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

17-Jul-20 Substructure Works CPP-025


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone B & Zone C 8-9/Bg-Bh, 11-14'/Cg-Ch FTB-1, FTB-3 20-Jul-20

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Betonval Readyconcrete, Inc./Mandaue City Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
5000psi 3/4 @ 28 days 4", 6", 8" if PCD 48 Cu. M Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification C  ­  Work  needs  major  rectification;  Hold 
work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 17-Jul-20 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: 17-Jul-20 Date: Date:
ELECTRICAL / AUX Name: Miko James Dela Cruz Name: Lito Cerdeña Name: Sul Medequillo
Signature: Signature: Signature:
(Company) Date: 17-Jul-20 Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: 17-Jul-20 Date: Date:
ARCHITECTURAL Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
SAFETY Name: Roland Cabilao Name: Ryan Villacorta Name: n/a
Omicron Construction, Inc. Signature: Signature: Signature: n/a
(Company) Date: 17-Jul-20 Date: Date: n/a
OTHERS Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Leandro Almario Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

17-Jul-20 Substructure Works CPP-026


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone B & Zone C 11 / Bc-Bf Columns at MF-6 20-Jul-20

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi 3/4 @ 28 days 4", 6", 8" if PCD 6 Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification C  ­  Work  needs  major  rectification;  Hold 
work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 17-Jul-20 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: 17-Jul-20 Date: Date:
ELECTRICAL / AUX Name: Miko James Dela Cruz Name: Lito Cerdeña Name: Sul Medequillo
Signature: Signature: Signature:
(Company) Date: 17-Jul-20 Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: 17-Jul-20 Date: Date:
ARCHITECTURAL Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
SAFETY Name: Roland Cabilao Name: Ryan Villacorta Name: n/a
Omicron Construction, Inc. Signature: Signature: Signature: n/a
(Company) Date: 17-Jul-20 Date: Date: n/a
OTHERS Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Leandro Almario Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

26-Jul-20 Substructure Works CPP-027


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone B & Zone C 10-10' / Bc-Bf RSW-3, RSW-6 29-Jul-20

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi 3/4 @ 28 days 4", 6", 8" if PCD 27 Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification C  ­  Work  needs  major  rectification;  Hold 
work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 26-Jul-20 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: 26-Jul-20 Date: Date:
ELECTRICAL / AUX Name: Miko James Dela Cruz Name: Lito Cerdeña Name: Sul Medequillo
Signature: Signature: Signature:
(Company) Date: 26-Jul-20 Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: 26-Jul-20 Date: Date:
ARCHITECTURAL Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
SAFETY Name: Roland Cabilao Name: Ryan Villacorta Name: n/a
Omicron Construction, Inc. Signature: Signature: Signature: n/a
(Company) Date: 26-Jul-20 Date: Date: n/a
OTHERS Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Leandro Almario Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

03-Aug-20 Substructure Works CPP-028


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone B & Zone C 8-9/Bf-Bg Tower Crane Foundation 08-Aug-20

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
5000psi 3/4 @ 28 days 4", 6", 8" if PCD 64 Cu.m Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification C  ­  Work  needs  major  rectification;  Hold 
work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 03-Aug-20 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: 03-Aug-20 Date: Date:
ELECTRICAL / AUX Name: Miko James Dela Cruz Name: Lito Cerdeña Name: Sul Medequillo
Signature: Signature: Signature:
(Company) Date: 03-Aug-20 Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: 03-Aug-20 Date: Date:
ARCHITECTURAL Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
SAFETY Name: Roland Cabilao Name: Ryan Villacorta Name: n/a
Omicron Construction, Inc. Signature: Signature: Signature: n/a
(Company) Date: 03-Aug-20 Date: Date: n/a
OTHERS Name: Rufo Maria Alfon Name: n/a Name: n/a
Signature: Signature: n/a Signature: n/a
(Company) Date: Date: n/a Date: n/a
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Leandro Almario Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

04-Aug-20 Substructure Works CPP-029


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone C 11-14'/Cc-Cf, 9-10/Bc-Bf FTB-1, FTB-2 08-Aug-20

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
5000psi 3/4 @ 28 days 4", 6", 8" if PCD 41 Cu.m Transit Mixer & Pump Crete
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification C  ­  Work  needs  major  rectification;  Hold 
work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 04-Aug-20 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: 04-Aug-20 Date: Date:
ELECTRICAL / AUX Name: Miko James Dela Cruz Name: Lito Cerdeña Name: Sul Medequillo
Signature: Signature: Signature:
(Company) Date: 04-Aug-20 Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: 04-Aug-20 Date: Date:
ARCHITECTURAL Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
SAFETY Name: Roland Cabilao Name: Ryan Villacorta Name: n/a
Omicron Construction, Inc. Signature: Signature: Signature: n/a
(Company) Date: 04-Aug-20 Date: Date: n/a
OTHERS Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Leandro Almario Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

04-Aug-20 Substructure Works CPP-030


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Columns and Shear wall at COF-4,5, MF-7, and


Zone C 11-14"/Cc-Cf MF-8 08-Aug-20

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi 3/4 @ 28 days 4", 6", 8" if PCD 43 Cu.m Transit Mixer & Pump Crete
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification C  ­  Work  needs  major  rectification;  Hold 
work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 04-Aug-20 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: 04-Aug-20 Date: Date:
ELECTRICAL / AUX Name: Miko James Dela Cruz Name: Lito Cerdeña Name: Sul Medequillo
Signature: Signature: Signature:
(Company) Date: 04-Aug-20 Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: 04-Aug-20 Date: Date:
ARCHITECTURAL Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
SAFETY Name: Roland Cabilao Name: Ryan Villacorta Name: n/a
Omicron Construction, Inc. Signature: Signature: Signature: n/a
(Company) Date: 04-Aug-20 Date: Date: n/a
OTHERS Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Leandro Almario Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

14-Aug-20 Substructure Works CPP-031


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone B & Zone C 9/Bc-Bf, 11/Cc-Cf, 12-14/Cf Rc-8, 9, 10, 11, 12, 14, 16 17-Aug-20

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi 3/4 @ 28 days 4", 6", 8" if PCD 30 cu. m Transit Mixer & Pump Crete
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification C  ­  Work  needs  major  rectification;  Hold 
work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 14-Aug-20 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: 14-Aug-20 Date: Date:
ELECTRICAL / AUX Name: Sarah Joyce Castillon Name: Lito Cerdeña Name: Sul Medequillo
Signature: Signature: Signature:
(Company) Date: 14-Aug-20 Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: 14-Aug-20 Date: Date:
ARCHITECTURAL Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
SAFETY Name: Roland Cabilao Name: Ryan Villacorta Name: n/a
Omicron Construction, Inc. Signature: Signature: Signature: n/a
(Company) Date: 14-Aug-20 Date: Date: n/a
OTHERS Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Leandro Almario Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

14-Aug-20 Substructure Works CPP-032


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

9-10/bc, 10'-11/Cc, 9-10/Bc-


Zone B & Zone C RW-10, RW-4, FTB-1, FTB-3 19-Aug-20
Bg, 11-14/Cf-Cg

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
5000psi 3/4 @ 28 days 4", 6", 8" if PCD 77 cu. m Transit Mixer & Pump Crete
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification C  ­  Work  needs  major  rectification;  Hold 
work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 14-Aug-20 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: 14-Aug-20 Date: Date:
ELECTRICAL / AUX Name: Sarah joyce Castillon Name: Lito Cerdeña Name: Sul Medequillo
Signature: Signature: Signature:
(Company) Date: 14-Aug-20 Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: 14-Aug-20 Date: Date:
ARCHITECTURAL Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
SAFETY Name: Roland Cabilao Name: Ryan Villacorta Name: n/a
Omicron Construction, Inc. Signature: Signature: Signature: n/a
(Company) Date: 14-Aug-20 Date: Date: n/a
OTHERS Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Leandro Almario Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

14-Aug-20 Substructure Works CPP-033


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone B & Zone C MF-3 RC-3, RC-5, RW-4, RSW-2, RSW-5 19-Aug-20

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi 3/4 @ 28 days 4", 6", 8" if PCD 53 cu. m Transit Mixer & Pump Crete
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification C  ­  Work  needs  major  rectification;  Hold 
work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 14-Aug-20 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: 14-Aug-20 Date: Date:
ELECTRICAL / AUX Name: Sarah Joyce Castillon Name: Lito Cerdeña Name: Sul Medequillo
Signature: Signature: Signature:
(Company) Date: 14-Aug-20 Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: 14-Aug-20 Date: Date:
ARCHITECTURAL Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
SAFETY Name: Roland Cabilao Name: Ryan Villacorta Name: n/a
Omicron Construction, Inc. Signature: Signature: Signature: n/a
(Company) Date: 14-Aug-20 Date: Date: n/a
OTHERS Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Leandro Almario Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

28-Aug-20 Substructure Works CPP-034


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone B 10-10'/Bc-Bf RSW-3, RSW-6 31-Aug-20

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi 3/4 @ 28 days 4", 6", 8" if PCD 34 cu. m Transit Mixer & Pump Crete
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification C  ­  Work  needs  major  rectification;  Hold 
work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 28-Aug-20 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: 28-Aug-20 Date: Date:
ELECTRICAL / AUX Name: Sarah Joyce Castillon Name: Lito Cerdeña Name: Sul Medequillo
Signature: Signature: Signature:
(Company) Date: 28-Aug-20 Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: 28-Aug-20 Date: Date:
ARCHITECTURAL Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
SAFETY Name: Roland Cabilao Name: Ryan Villacorta Name: n/a
Omicron Construction, Inc. Signature: Signature: Signature: n/a
(Company) Date: 28-Aug-20 Date: Date: n/a
OTHERS Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Leandro Almario Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

08-Sep-20 Substructure Works CPP-035


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone C 14"/Cc-Cg RWF-4 08-Sep-20

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Direct Pouring Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
5000psi 3/4 @ 28 days 4", 6", 8" if PCD 10 cu. m Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification C  ­  Work  needs  major  rectification;  Hold 
work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 08-Sep-20 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: 08-Sep-20 Date: Date:
ELECTRICAL / AUX Name: Sarah Joyce Castillon Name: Lito Cerdeña Name: Sul Medequillo
Signature: Signature: Signature:
(Company) Date: 08-Sep-20 Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: 08-Sep-20 Date: Date:
ARCHITECTURAL Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
SAFETY Name: Roland Cabilao Name: Ryan Villacorta Name: n/a
Omicron Construction, Inc. Signature: Signature: Signature: n/a
(Company) Date: 08-Sep-20 Date: Date: n/a
OTHERS Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Leandro Almario Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

19-Sep-20 Substructure Works CPP-036


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone B 5-10/Bc-Bf Slab, Girders, & beams 22-Sep-20

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
6000psi 3/4 @ 28 days 4", 6", 8" if PCD 154 cu. m Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification C  ­  Work  needs  major  rectification;  Hold 
work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 19-Sep-20 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: 19-Sep-20 Date: Date:
ELECTRICAL / AUX Name: Sarah Joyce Castillon Name: Lito Cerdeña Name: Sul Medequillo
Signature: Signature: Signature:
(Company) Date: 19-Sep-20 Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: 19-Sep-20 Date: Date:
ARCHITECTURAL Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
SAFETY Name: Roland Cabilao Name: Ryan Villacorta Name: n/a
Omicron Construction, Inc. Signature: Signature: Signature: n/a
(Company) Date: 19-Sep-20 Date: Date: n/a
OTHERS Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Leandro Almario Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

19-Sep-20 Substructure Works CPP-037


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone B 5-6/Ac-Af Shear walls, Columns, & Retaining walls 22-Sep-20

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi 3/4 @ 28 days 4", 6", 8" if PCD 47 cu.m Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification C  ­  Work  needs  major  rectification;  Hold 
work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 19-Sep-20 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: 19-Sep-20 Date: Date:
ELECTRICAL / AUX Name: Sarah Joyce Castillon Name: Lito Cerdeña Name: Sul Medequillo
Signature: Signature: Signature:
(Company) Date: 19-Sep-20 Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: 19-Sep-20 Date: Date:
ARCHITECTURAL Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
SAFETY Name: Roland Cabilao Name: Ryan Villacorta Name: n/a
Omicron Construction, Inc. Signature: Signature: Signature: n/a
(Company) Date: 19-Sep-20 Date: Date: n/a
OTHERS Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Leandro Almario Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

19-Sep-20 Substructure Works CPP-038


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone B 6-10/Bb-Bc Footing tie bem, & Retaning wall 22-Sep-20

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
5000psi 3/4 @ 28 days 4", 6", 8" if PCD 37 Cu.m Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification C  ­  Work  needs  major  rectification;  Hold 
work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 19-Sep-20 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: 19-Sep-20 Date: Date:
ELECTRICAL / AUX Name: Sarah Joyce Castillon Name: Lito Cerdeña Name: Sul Medequillo
Signature: Signature: Signature:
(Company) Date: 19-Sep-20 Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: 19-Sep-20 Date: Date:
ARCHITECTURAL Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
SAFETY Name: Roland Cabilao Name: Ryan Villacorta Name: n/a
Omicron Construction, Inc. Signature: Signature: Signature: n/a
(Company) Date: 19-Sep-20 Date: Date: n/a
OTHERS Name: n/a Name: n/a Name: n/a
Signature: n/a Signature: n/a Signature: n/a
(Company) Date: n/a Date: n/a Date: n/a
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Leandro Almario Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

05-Oct-20 Substructure Works CPP-039


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone c 10-14"/Cc-Cf RW, FTB, Beams, Slab 06-Oct-20

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
6000psi 3/4 @ 28 days 4", 6", 8" if PCD 230 Cu.m Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification C  ­  Work  needs  major  rectification;  Hold 
work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Sarah Joyce Castillon Name: Lito Cerdeña Name: Sul Medequillo
Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Leandro Almario Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

05-Oct-20 Substructure Works CPP-040


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone c 10-14"/Cc-Cf RSW, & Columns 06-Oct-20

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi 3/4 @ 28 days 4", 6", 8" if PCD 45 Cu.m Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification C  ­  Work  needs  major  rectification;  Hold 
work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Sarah Joyce Castillon Name: Lito Cerdeña Name: Sul Medequillo
Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Leandro Almario Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

12-Oct-20 Substructure Works CPP-041


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone B 5/Ac-Af Columns 05-Oct-20

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi 3/4 @ 28 days 4", 6", 8" if PCD 14 Cu.m Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Sarah Joyce Castillon Name: Lito Cerdeña Name: Sul Medequillo
Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Leandro Almario Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

16-Oct-20 Substructure Works CPP-042


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone B 5'-9/Bc-Bf Columns and Shear walls 17-Oct-20

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi 3/4 @ 28 days 4", 6", 8" if PCD 50 Cu.m Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Sarah Joyce Castillon Name: Lito Cerdeña Name: Sul Medequillo
Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Leandro Almario Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

24-Oct-20 Substructure Works CPP-043


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone C 10-13/Bc-Bf Columns, & shear walls 24-Oct-20

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi 3/4 @ 28 days 4", 6", 8" if PCD 46 Cu.m Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Sarah Joyce Castillon Name: Lito Cerdeña Name: Sul Medequillo
Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Leandro Almario Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

29-Oct-20 Substructure Works CPP-044


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone A 1-5'/Ac-Af Beams, Girders, slab, & rw 31-Oct-20

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
6000psi 3/4 @ 28 days 4", 6", 8" if PCD 170 Cu.m Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Sarah Joyce Castillon Name: Lito Cerdeña Name: Sul Medequillo
Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Leandro Almario Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

29-Oct-20 Substructure Works CPP-045


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone C 10-10'/Bc-Bc, & 14-14'/Cc-Cf Columns and Shear wall 3 31-Oct-20

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi 3/4 @ 28 days 4", 6", 8" if PCD 36 Cu.m Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Sarah Joyce Castillon Name: Lito Cerdeña Name: Sul Medequillo
Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Leandro Almario Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

13-Nov-20 Substructure Works CPP-046


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone B 5-10/Bc-Bf Slab, beams, & Girders 14-Nov-20

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
6000psi 3/4 @ 28 days 4", 6", 8" if PCD 208 Cu.m Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Sarah Joyce Castillon Name: Lito Cerdeña Name: Sul Medequillo
Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Leandro Almario Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

23-Nov-20 Substructure Works CPP-047


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone A & C 1-2/Ac-Af, & 14'-14"/Cc-Cd Columns and Shear Wall 23-Nov-20

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi 3/4 @ 28 days 4", 6", 8" if PCD 70 Cu.m Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 23-Nov-20 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Sarah Joyce Castillon Name: Lito Cerdeña Name: Sul Medequillo
Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Leandro Almario Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

30-Nov-20 Substructure Works CPP-048


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone A 3-5/Ac-Ac Columns 01-Dec-20

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi 3/4 @ 28 days 4", 6", 8" if PCD 38 Cu.m Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 30-Nov-20 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Sarah Joyce Castillon Name: Lito Cerdeña Name: Sul Medequillo
Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Leandro Almario Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

30-Nov-20 Substructure Works CPP-049


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone C 10-14"/Cc-Cf Slab, Beams, & Girders 01-Dec-20

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
6000psi 3/4 @ 28 days 4", 6", 8" if PCD 253 Cu.m Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 30-Nov-20 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Sarah Joyce Castillon Name: Lito Cerdeña Name: Sul Medequillo
Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Leandro Almario Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

09-Dec-20 Substructure Works CPP-050


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone B 7-9/Bc-Bf Columns 09-Dec-20

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi 3/4 @ 28 days 4", 6", 8" if PCD 65 Cu.m Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 09-Dec-20 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Miko James Dela Cruz Name: Lito Cerdeña Name: Sul Medequillo
Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Leandro Almario Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

18-Jan-21 Substructure Works CPP-051


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

11/Cc-Cf, 12-14'/Cd-Cf, 5'-


Zone B & Zone C Columns & RSW-2 18-Jan-21
6/Bc-Bd

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi 3/4 @ 28 days 4", 6", 8" if PCD 77 Cu.m Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Hennessy Lopio Name: Patrick Junther Sazon
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 18-Jan-21 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Miko James Dela Cruz Name: Lito Cerdeña Name: Sul Medequillo
Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Jay Cariquitan
Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Leandro Almario Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

25-Jan-21 Substructure Works CPP-052


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone A 1-5/Ac-Af Slab and Beams (2nd Floor) 26-Jan-21

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
6000psi 3/4 @ 28 days 4", 6", 8" if PCD 130 Cu.m Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

PLUMBNESS/LEVEL LINE/  GRADE REBARS FORM INSERTS AND BLOCK  CLEAN  UP Remarks
IMBEDS OUTS

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The   A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC/LGB INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Patrick Junther Sazon Name: Reynaldo Haboc Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 25-Jan-21 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Kevin Ignoro Name: Sul Medequillo Name: Tito Sioson Jr.
ROBROS Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Hennessy Lopio Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

25-Jan-21 Substructure Works CPP-053


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone B 5'-6/Be-Bf RSW-5 26-Jan-21

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi 3/4 @ 28 days 4", 6", 8" if PCD 25 Cu.m Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Patrick Junther Sazon Name: Reynaldo Haboc Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 25-Jan-21 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Kevin Ignoro Name: Sul Medequillo Name: Tito Sioson Jr.
ROBROS Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Hennessy Lopio Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

05-Feb-21 Substructure Works CPP-054


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone B 5'-10/Bc-Bf Slab, & beams 09-Feb-21

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
6000psi 3/4 @ 28 days 4", 6", 8" if PCD 220 m³ Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Patrick Junther Sazon Name: Reynaldo Haboc Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 05-Feb-21 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Kevin Ignoro Name: Sul Medequillo Name: Tito Sioson Jr.
ROBROS Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Hennessy Lopio Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

05-Feb-21 Substructure Works CPP-055


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone C 12-14/Cc, 10-10'/Bc-Bf Columns, and RSW 06-Feb-21

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi 3/4 @ 28 days 4", 6", 8" if PCD 56 m³ Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Patrick Junther Sazon Name: Reynaldo Haboc Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 05-Feb-21 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Kevin Ignoro Name: Sul Medequillo Name: Tito Sioson Jr.
ROBROS Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Hennessy Lopio Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

05-Feb-21 Substructure Works CPP-056


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone C 10-14" / Cc-Cf Slab and Beams 23-Feb-21

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
6000psi 3/4 @ 28 days 4", 6", 8" if PCD 230 m³ Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Patrick Junther Sazon Name: Reynaldo Haboc Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 05-Feb-21 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Kevin Ignoro Name: Sul Medequillo Name: Tito Sioson Jr.
ROBROS Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Hennessy Lopio Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

05-Feb-21 Substructure Works CPP-057


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone C 10-10'/Cc-Cf, 14'-14"/Cc-Cd RSW-3, RSW-6,RSW-4 23-Feb-21

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi 3/4 @ 28 days 4", 6", 8" if PCD 37 m³ Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Patrick Junther Sazon Name: Reynaldo Haboc Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 05-Feb-21 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Kevin Ignoro Name: Sul Medequillo Name: Tito Sioson Jr.
ROBROS Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Hennessy Lopio Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

01-Mar-21 Superstructure Works CPP-058


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone A 1-5/Ac-Af Columns, & RSW-1 04-Mar-21

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi 3/4 @ 28 days 4", 6", 8" if PCD 38 m³ Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Patrick Junther Sazon Name: Reynaldo Haboc Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 01-Mar-21 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Kevin Ignoro Name: Sul Medequillo Name: Tito Sioson Jr.
ROBROS Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Hennessy Lopio Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

01-Mar-21 Superstructure Works CPP-059


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone A 1-5/Ac-Af Slab, &canopies 04-Mar-21

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
6000psi 3/4 @ 28 days 4", 6", 8" if PCD 182 m³ Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Patrick Junther Sazon Name: Reynaldo Haboc Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 01-Mar-21 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Kevin Ignoro Name: Sul Medequillo Name: Tito Sioson Jr.
ROBROS Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Hennessy Lopio Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

01-Mar-21 Superstructure Works CPP-060


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Front Parking 6-14'/Cb Columns 03-Mar-21

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi 3/4 @ 28 days 4", 6", 8" if PCD 20 m³ Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Patrick Junther Sazon Name: Reynaldo Haboc Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 01-Mar-21 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Kevin Ignoro Name: Sul Medequillo Name: Tito Sioson Jr.
ROBROS Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Hennessy Lopio Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

09-Mar-21 Superstructure Works CPP-061


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone B 5'-10/Bc-Bf Columns, and Shear walls 12-Mar-21

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi 3/4 @ 28 days 4", 6", 8" if PCD 50 m³ Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Patrick Junther Sazon Name: Reynaldo Haboc Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 09-Mar-21 Date: Date:
PLUMBING/SANITARY Name: Name: Jay Cariquitan Name: Keith Thomas Gaudia
Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Kevin Ignoro Name: Sul Medequillo Name: Tito Sioson Jr.
ROBROS Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Jorge Borrinaga Name: Jay Cariquitan Name: Keith Thomas Gaudia
ICPWI Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Hennessy Lopio Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

09-Mar-21 Superstructure Works CPP-062


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone B 5'-10/Bc-Bf Beams, and Slab 12-Mar-21

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
6000psi 3/4 @ 28 days 4", 6", 8" if PCD 161 m³ Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Patrick Junther Sazon Name: Reynaldo Haboc Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 09-Mar-21 Date: Date:
PLUMBING/SANITARY Name: Name: Jay Cariquitan Name: Keith Thomas Gaudia
Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Kevin Ignoro Name: Sul Medequillo Name: Tito Sioson Jr.
ROBROS Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Jorge Borrinaga Name: Jay Cariquitan Name: Keith Thomas Gaudia
ICPWI Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Hennessy Lopio Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

16-Mar-21 Substructure Works CPP-063


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Front Parking 12-14"/Ca. 14"/Ca-Cc Retaining wall 17-Mar-21

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
5000psi 3/4 @ 28 days 4", 6", 8" if PCD 32 m³ Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Patrick Junther Sazon Name: Reynaldo Haboc Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 16-Mar-21 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
OMC Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Sarah Joyce Castillion Name: Sul Medequillo Name: Tito Sioson Jr.
OMC Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
OMC Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Hennessy Lopio Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

22-Mar-21 Substructure Works CPP-064


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

3F (Zone B) 10-10"/Bc-Bd Shear wall 24-Mar-21

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi 3/4 @ 28 days 4", 6", 8" if PCD 34 m³ Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Patrick Junther Sazon Name: Reynaldo Haboc Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 22-Mar-21 Date: Date:
PLUMBING/SANITARY Name: Jorge Borrinaga Name: Jay Cariquitan Name: Keith Thomas Gaudia
ICPWI Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Kevin Ignoro Name: Sul Medequillo Name: Tito Sioson Jr.
RBI Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Jorge Borrinaga Name: Jay Cariquitan Name: Keith Thomas Gaudia
ICPWI Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Hennessy Lopio Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

16-Mar-21 Substructure Works CPP-065


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

3F (Zone B) 10-11"/Bc-Bd Slab, Beams, & Girders 24-Mar-21

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Geo Transport/ Talisay Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
6000psi 3/4 @ 28 days 4", 6", 8" if PCD 25 m³ Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Patrick Junther Sazon Name: Reynaldo Haboc Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 16-Mar-21 Date: Date:
PLUMBING/SANITARY Name: Jorge Borrinaga Name: Jay Cariquitan Name: Keith Thomas Gaudia
ICPWI Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Kevin Ignoro Name: Sul Medequillo Name: Tito Sioson Jr.
RBI Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Jorge Borrinaga Name: Jay Cariquitan Name: Keith Thomas Gaudia
ICPWI Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Hennessy Lopio Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

29-Mar-21 Substructure Works CPP-066


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

5F (Zone A) 1-5'/Ac-Af Columns, Shear wall 30-Mar-21

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Betonval Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi 3/4 @ 28 days 4", 6", 8" if PCD 57 m³ Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Patrick Junther Sazon Name: Reynaldo Haboc Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 29-Mar-21 Date: Date:
PLUMBING/SANITARY Name: Jorge Borrinaga Name: Jay Cariquitan Name: Keith Thomas Gaudia
ICPWI Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Kevin Ignoro Name: Sul Medequillo Name: Tito Sioson Jr.
RBI Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Jorge Borrinaga Name: Jay Cariquitan Name: Keith Thomas Gaudia
ICPWI Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Hennessy Lopio Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

29-Mar-21 Substructure Works CPP-067


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

5F (Zone A) 1-5'/Ac-Af Slab, Beams, And Girders 30-Mar-21

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Betonval Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
6000psi 3/4 @ 28 days 4", 6", 8" if PCD 164 m³ Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Patrick Junther Sazon Name: Reynaldo Haboc Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 29-Mar-21 Date: Date:
PLUMBING/SANITARY Name: Jorge Borrinaga Name: Jay Cariquitan Name: Keith Thomas Gaudia
ICPWI Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Kevin Ignoro Name: Sul Medequillo Name: Tito Sioson Jr.
RBI Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Jorge Borrinaga Name: Jay Cariquitan Name: Keith Thomas Gaudia
ICPWI Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Hennessy Lopio Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

06-Apr-21 Substructure Works CPP-068


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone B (Basement - LGF) 6-8/Bf-Bi Columns, Slab, Beams, And Girders 07-Apr-21

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Betonval Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi & 6000psi 3/4 @ 28 days 4", 6", 8" if PCD 100m³ 8000psi & 3m³ 6000psi Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Patrick Junther Sazon Name: Reynaldo Haboc Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 06-Apr-21 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
OMC Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Sarah Joyce Castillon Name: Sul Medequillo Name: Tito Sioson Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Hennessy Lopio Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

22-Mar-21 Superstructure Works CPP-069


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

5F (Zone B) 5-10/Bc-Bf Shear walls, Columns, Girders, beams, and Slab 14-Apr-21

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Betonval Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi and 6000psi 3/4 @ 28 days 4", 6", 8" if PCD 71m³ 8000PSI & 160m³ 6000PSI Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Patrick Junther Sazon Name: Reynaldo Haboc Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 22-Mar-21 Date: Date:
PLUMBING/SANITARY Name: Jorge Borrinaga Name: Jay Cariquitan Name: Keith Thomas Gaudia
ICPWI Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Kevin Ignoro Name: Sul Medequillo Name: Tito Sioson Jr.
RBI Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Jorge Borrinaga Name: Jay Cariquitan Name: Keith Thomas Gaudia
ICPWI Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Hennessy Lopio Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

26-Apr-21 Superstructure Works CPP-071


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

LGF (Zone B Back parking) 8-12/Bf-Bg Columns, Beams, Girders, & Slab 15-Apr-21

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Betonval Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi and 6000psi 3/4 @ 28 days 4", 6", 8" if PCD 3m³ 8000PSI & 87m³ 6000PSI Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Patrick Junther Sazon Name: Reynaldo Haboc Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 26-Apr-21 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Sarah Joyce Castillon Name: Sul Medequillo Name: Tito Sioson Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Hennessy Lopio Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

26-Apr-21 Superstructure Works CPP-071


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone C (2F-3F) 11-14"/Cc-Cf Columns, Beams, Girders, & Slab 27-Apr-21

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Betonval Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi and 6000psi 3/4 @ 28 days 4", 6", 8" if PCD 53m³ 8000PSI & 145m³ 6000PSI Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Patrick Junther Sazon Name: Reynaldo Haboc Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 26-Apr-21 Date: Date:
PLUMBING/SANITARY Name: Jorge Borrinaga Name: Jay Cariquitan Name: Keith Thomas Gaudia
ICPWI Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Kevin Ignoro Name: Sul Medequillo Name: Tito Sioson Jr.
RBI Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Jorge Borrinaga Name: Jay Cariquitan Name: Keith Thomas Gaudia
ICPWI Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Hennessy Lopio Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

26-Apr-21 Substructure works CPP-072


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone B (Basement - LGF) 7-Bg-Bg', 8-12/Bg, 7-10, Bi Columns, RW-4 26-Apr-21

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Betonval Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi and 5000psi 3/4 @ 28 days 4", 6", 8" if PCD 8m³ 8000PSI & 13m³ 5000PSI Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Patrick Junther Sazon Name: Reynaldo Haboc Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 26-Apr-21 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Sarah Joyce Castillon Name: Sul Medequillo Name: Tito Sioson Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Hennessy Lopio Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

29-Apr-21 Substructure works CPP-073


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone B (Basement - LGF) 8-13/Bg-Bi Columns, Beams, Girders, Slab 02-May-21

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Betonval Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi and 6000psi 3/4 @ 28 days 4", 6", 8" if PCD 4m³ 8000PSI & 140m³ 6000PSI Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Patrick Junther Sazon Name: Reynaldo Haboc Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 29-Apr-21 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Sarah Joyce Castillon Name: Sul Medequillo Name: Tito Sioson Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Hennessy Lopio Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

05-May-21 Superstructure works CPP-074


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone B (3F-5F) 10-14"/Cc-Cf Columns, Beams, Girders, Slab, RSW Friday, May 14, 2021

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Betonval Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi and 6000psi 3/4 @ 28 days 4", 6", 8" if PCD 110m³ 8000PSI & 180m³ 6000PSI Transit Mixer
Drawing No. : ✘
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Patrick Junther Sazon Name: Reynaldo Haboc Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 05-May-21 Date: Date:
PLUMBING/SANITARY Name: Jorge Borrinaga Name: Jay Cariquitan Name: Keith Thomas Gaudia
ICPWI Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Kevin Ignoro Name: Sul Medequillo Name: Tito Sioson Jr.
RBI Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Jorge Borrinaga Name: Jay Cariquitan Name: Keith Thomas Gaudia
ICPWI Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Hennessy Lopio Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

10-May-21 Superstructure works CPP-075


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone C (Basement - LGF), (LGF-GF) 8-12/Bg, 7-8/Bi, 14"/Cg Columns, RW Monday, May 10, 2021

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Betonval Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi and 6000psi 3/4 @ 28 days 4", 6", 8" if PCD 10m³ 8000PSI & 10m³ 5000PSI Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Patrick Junther Sazon Name: Reynaldo Haboc Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 10-May-21 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Sarah Joyce Castillon Name: Sul Medequillo Name: Tito Sioson Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Hennessy Lopio Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

19-May-21 Substructures works CPP-076


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone C (Basement - LGF) 12-14"/Cf-Ci Columns, RW, Beams, Girders, and Slab Friday, May 21, 2021

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Betonval Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi and 6000psi 3/4 @ 28 days 4", 6", 8" if PCD 5m³ 8000PSI & 160m³ 6000PSI Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Patrick Junther Sazon Name: Reynaldo Haboc Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 19-May-21 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Sarah Joyce Castillon Name: Sul Medequillo Name: Tito Sioson Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Hennessy Lopio Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

27-May-21 Superstructure works CPP-077


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone C (LGF-GF) 13-14'/Cg-Ch Columns Thursday, May 27, 2021

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Betonval Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi 3/4 @ 28 days 4", 6", 8" if PCD 9m³ Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Patrick Junther Sazon Name: Reynaldo Haboc Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 27-May-21 Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Sarah Joyce Castillon Name: Sul Medequillo Name: Tito Sioson Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Hennessy Lopio Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

27-May-21 Superstructure works CPP-078


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone A (5F-6F) 1-5/Ac-Af Columns, Beams, Girders, Stair - 01, Slab Saturday, May 29, 2021

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


GEOTRANSPORT Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi, 6000psi 3/4 @ 28 days 4", 6", 8" if PCD 57m³ 8000psi, 164m³ 6000psi Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Patrick Junther Sazon Name: Reynaldo Haboc Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 27-May-21 Date: Date:
PLUMBING/SANITARY Name: Jorge Borrinaga Name: Jay Cariquitan Name: Keith Thomas Gaudia
ICPWI Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Kevin Ignoro Name: Sul Medequillo Name: Tito Sioson Jr.
RBI Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Jorge Borrinaga Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Hennessy Lopio Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

27-May-21 Superstructure works CPP-078


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone B (5F-6F) 11-14" Columns, Beams, Girders, Stair - 04, Slab Thursday, July 1, 2021

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Betonval Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
8000psi, 6000psi 3/4 @ 28 days 4", 6", 8" if PCD 60m³ 8000psi, 165m³ 6000psi Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Patrick Junther Sazon Name: Reynaldo Haboc Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: 27-May-21 Date: Date:
PLUMBING/SANITARY Name: Jorge Borrinaga Name: Jay Cariquitan Name: Keith Thomas Gaudia
ICPWI Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Kevin Ignoro Name: Sul Medequillo Name: Tito Sioson Jr.
RBI Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Jorge Borrinaga Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Hennessy Lopio Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

05-Jul-21 Substructure works CPP-085


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone B (GF) 6-8/Bf-Bi Beams, Girders, Retaining wall, Slab Tuesday, July 6, 2021

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Betonval Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
5000psi, 6000psi 3/4 @ 28 days 4", 6", 8" if PCD 18m³ 5000psi, 133m³ 6000psi Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Patrick Junther Sazon Name: Reynaldo Haboc Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Sarah Joyce Castillon Name: Sul Medequillo Name: Tito Sioson Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Hennessy Lopio Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

13-Jul-21 Superstructure works CPP-086


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone A (7) 1-5/Ac-Af Beams, Girders, Slab, Columns, RSW-1 Friday, July 16, 2021

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Betonval Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
5000psi, 6000psi 3/4 @ 28 days 4", 6", 8" if PCD 57m³ 8000psi, 161m³ 6000psi Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Patrick Junther Sazon Name: Reynaldo Haboc Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
PLUMBING/SANITARY Name: Jorge Borrinaga Name: Jay Cariquitan Name: Keith Thomas Gaudia
ICPWI Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Kevin Ignoro Name: Sul Medequillo Name: Tito Sioson Jr.
RBI Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Jorge Borrinaga Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Hennessy Lopio Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

14-Jul-21 Substructure works CPP-088


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone B (LGF-GF) 9-13/Bi RW-4 Wednesday, July 14, 2021

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Betonval Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
5000psi 4", 6", 8" if PCD 19m³ Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Patrick Junther Sazon Name: Reynaldo Haboc Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Sarah Joyce Castillon Name: Sul Medequillo Name: Tito Sioson Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Hennessy Lopio Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)
CONCRETE POURING PERMIT
PROJECT: Aruga by Rockwell Residential Phase 1

LOCATION: Punta Engaño, Lapu-Lapu City


DATE PREPARED : WP NO. & SCOPE: PERMIT NO. :

24-Jul-21 Substructure works CPP-090


BUILDING AREA / LEVEL (Pls. enclose key plan): GRIDLINE / AXES : STRUCTURE : DATE OF POURING :

Zone B (LGF-GF) 8-11/Cf-Ci Slab, Beams, Girders, and RW-4 Sunday, July 25, 2021

REQUESTED BY :

Omicron Construction, Inc. Arjay Mandap/Project Engineer


(Contractor) (Name/Designation) (Signature)

BATCH PLANT SOURCE/LOCATION: PLACEMENT METHOD: CURING METHOD:


Betonval Pumpcrete Wet Abaca (Water)
DESIGN MIX: REQUIRED SLUMP: ESTIMATED VOLUME: EQUIPMENT TO BE USED:
6000psi 4", 6", 8" if PCD 138m³ Transit Mixer
Drawing No. : ✘ Key Plan
REFERENCE:
Test Report No. : Others:

LINE/  GRADE INSERTS AND BLOCK  CLEAN  UP


PLUMBNESS/LEVEL REBARS FORM IMBEDS OUTS Remarks

C  ­  Work  needs  major  rectification;  Hold 


ACTION  CODES: A ­ No  conflict;  Proceed! B ­ Work  needs  minor  rectification work/installation

This Permit is not valid without the attached Inspection Checklist for each partcular trade. The  A&E  Representatives  certify  that  appropriate  inspections  were 
conducted  by  the  subcontractors  and  verified  by  the  Project  Engineers  concerned.

PREPARED BY: CHECKED BY: INSPECTED BY:


CONTRACTOR RLC COORDINATOR RLC INSPECTOR
CIVIL / STRUCTURAL Name: Arjay Mandap Name: Patrick Junther Sazon Name: Reynaldo Haboc Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
PLUMBING/SANITARY Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ELECTRICAL / AUX Name: Sarah Joyce Castillon Name: Sul Medequillo Name: Tito Sioson Jr.
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
FIREPRO/MECH Name: Miko James Dela Cruz Name: Jay Cariquitan Name: Keith Thomas Gaudia
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
ARCHITECTURAL Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
SAFETY Name: Roland Cabilao Name: Name:
Omicron Construction, Inc. Signature: Signature: Signature:
(Company) Date: Date: Date:
OTHERS Name: Name: Name:
Signature: Signature: Signature:
(Company) Date: Date: Date:
PERMITTING:  Based  on  the  recommendations  of  the  above  personnel,  having  verified  and  certified  that  other  works  in  the  area will  not  conflict  with  the  work 
specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this  request  and  that  shop  drawings  and  materials 
comply  with  the  latest  approved  plans  and specifications,  the  Project  Engineer  in  charge  of  said  Activity/Work  Item  hereby  recommends  approval  of  this 
request.

APPROVED BY : NOTED BY :

Hennessy Lopio Allan Louie Lima


Construction Manager RLC Project Manager

DISTRIBUTION: Contractor Project Documentation Form S-007 Revision no. 000 (April 2018)