According to PMT replay in (TR#: 01/16/00014/TR/000/0409) (attached) and the supplier replay (attached)
We would like to inform you that the hositway walls (shaft walls) of interior walls are not insulated, also the doors of the elevators are not
air tightened, further to that there is a small air circulation by the cabin fan on top, also the roof of the hoistway (shaft) its insulated which
will protect the hoistway (shaft) from the heat.
Base on the above mentioned points ABC consider that the heat will not exceed 40° and the humidity does not exceed 90%
9/14/2019
Engineering Manager - Engr.Mohammed Rassem Signature: Date:
For Contractor:
Project Manager - Engr.Ahmad Farouk Signature: Date: 9/14/2019
Reviewed for General Acceptance. This review does not relieve the Contractor of his responsibility for making the work conform to the requirements of the Contract
Response:
For PMT/CMT
Name: Signature: Date:
For SAPMT
Name: Signature: Date:
Note: This form cannot modify contract cost or time, if contractor belives that response creates a change in scope and effecting cost and/or time, contractor should submit a "Request for Change"