: PWA-RPD-QM-FM-040
SA048-WSP-GEN-MTS-MNCR-1
SA048-D&B R and I and Security for Development of
Contract Name: Contract No.: BP2020 C60 G
Government Building in South West of the Country
Contractor: Tadmur Contracting NCR No.:
Engineers
WSP Date Issued: 23 Sep. 2021
Representative:
Signed :
CATEGORY:
Specification / Drawings / Process /
☒ Standards ☐ Details ☒ Procedure ☒ Material ☐ Plant / Equip ☒ Management
ISSUE:
Quality Skill /
☒ Control; ☒ Competence ☒ Supervision ☒ Planning ☐ Information ☒ Performance
IMPACT:
Not Meeting Poor Const Poor Defective Inadequate
☒ Requirements ☒ Practice ☒ Workmanship ☐ Material ☐ Records ☐ Other
Root Cause:
CONTRACTOR
Correction:
Action to prevent recurrence: TARGET DATE
TO CLOSE NCR
☐ Contractor’s proposals are unacceptable for the following reasons. (Contractor should revise & resubmit):
Name & Signature Title: Date:
PART D: CORRECTIVE ACTION PROPOSED IN PART B ARE COMPLETE & READY FOR INSPECTION ON :
CONTRACTOR
☐ Corrective Action have been undertaken and are acceptable. This NCR may be closed out.
☐ Corrective Action undertaken by the Contractor are not acceptable for the following reasons and this NCR may not
be closed out. (Contractor must address these issues):
Title: Date:
Name & Signature: