Non-Conformance Report

NCR No ..
TRADE PACKAGE NO. CONTRACTOR
WORKS
CAUSE : 1.Quality of Material 2. Methods Statement 3. Workmanship 4. Shop drawings 5. Design or Documen
implementation conformity
REPORTED BY DATE
RECORDED BY DATE

DETAILS OF NON-CONFORMANCE
METHOD STATEMENT NO. DRWG. NO.

LOCATION SAMPLE NO.

Description of the Non Conformance:

Causes of the Non Conformance:

Manager in Charge DATE


CAR required : YES/NO QC Manager DATE

PROPOSED DISPOSITION PREPARED BY


DATE
1. Repair 2. Use as is 3. Rework 4. Replace

Details:

Manager in Charge DATE


QC Manager DATE

APPROVAL : Project Manager

Comments

CLIENT APPROVAL REQUIRED YES/NO DATE SIGNED


Client Representative: DATE SIGNED

VERIFICATION OF COMPLETED DISPOSITION


NOTES

Sign-off of NCR DATE /


DATE /
NCR revision A: Sep 14