ETIHAD SOUTHSIDE CATERING FACILITY (ESCF) REGULATORY AND OPERATIONAL DERISKING

WORKS,ABU DHABI, UNITED ARAB EMIRATES

METHOD STATEMENT SUBMITTAL


REFERENCE No.: M1439-GHD-MCL-MSS-053 REV. 00 DATE: 29/04/2019

Method Statement and Risk Assessment for Modification of LV


SUBJECT: PROJECT No.: M1439
Panels in 304 and 506

TO: GHD Global FROM: McLaren Construction

Discipline :
Architectural Structural M.E.P Interiors External Other (state)

DOCUMENT DESIGNATION:

NO. OF
NO. DESCRIPTION / TITLE DOCUMENT NO. REVISION
COPIES
Method Statement and Risk Assessment for
1 M1439-MCL-S2.01-MSS-047 00 01
Modification of LV Panels in 304 and 506
FOR CONTRACTOR:
NAME: Martyn Robinson DESIGNATION: Project Manager SIGNATURE: ___________DATE: 29/04/2019

ENGINEER’S COMMENTS:

Refer and comply to McLaren Comments

GHD Global Pty Ltd.


DOCUMENT / DRAWINGS
REVIEW
DOCUMENT STATUS : THIS SUBMITTAL HAS BEEN REVIEWED FOR COMPLIANCE
WITH THE REQUIREMENTS AND RETURNED AS FOLLOWS:

A – Approved (Work may proceed) ☐ A – No Objection


☐ B – Revise & Resubmit
a
(Work may proceed subject to
B – Approved with Comments (Work may proceed subject to incorporation of comments
incorporation indicated)
of changes indicated)
☐ C – Revise & Resubmit
(Work may not proceed)
C – Revise and Resubmit (Work may not proceed need to resubmit) ☐ D – Not Acceptable
The outcome of this review does not constitute acceptance of design, details,
calculations, analysis test methods or material developed or selected by the
Contractor / Subcontractor / Supplier and does not relieve the Contractor /
Subcontractor / Supplier from full compliance with contractual obligations.
Contractor / Subcontractor / Supplier is responsible for:
1. Compliance with the Client requirements
2. Coordination with other trades
3. Confirming and correlating all quantities and dimensions
4. Performing all work in a safe and satisfactory manner

CLIENT REPRESENTATIVE: 5. Compliance with all relevant standards, building codes & authority
regulations
All previous comments must be incorporated.

KArlos
NAME: _________________ E.E.
DESIGNATION: ______________ SIGNATURE: _________________ DATE: 7-5-2019
By:

_________
Karlos Mananquil
Date:

07-May-2019

Corrections or comments made via submittals during this review do not relieve the contractor from compliance with the requirements of
the Contract Documents.

QMS009 (UAE) 09/15 Rev A Page 1 of 1 Method Statement Submittal


|