Method Statement and Risk Assessment
1 for Existing Dry Type Transformer M1439-MCL-S2.01-MSS-033 01 00
Reconditioning
FOR CONTRACTOR:
NAME: Martyn Robinson DESIGNATION: Project Manager SIGNATURE: _________DATE: 05/02/2019
ENGINEER’S COMMENTS:
1. Provide the testing and re-conditioning methodology of transformer at "Off state" condition as per manufacturer recommendations.
2. Include in the methodology to provide report summary of testing results conducted with images of the findings for Etihad record.
3. Ensure the reconditioning work shall be done as per original OEM guidelines or manufacturer recommendation reconditioning procedure.
4. Ensure safety officer is present during the live testing of the transformer.
DOCUMENT STATUS :
A – Approved (Work may proceed)
B – Approved with Comments (Work may proceed subject to incorporation of comments indicated)
x
GHD Global Pty Ltd.
DOCUMENT / DRAWINGS
C – Revise and Resubmit (Work may not proceed need to resubmit) REVIEW
THIS SUBMITTAL HAS BEEN REVIEWED FOR COMPLIANCE
WITH THE REQUIREMENTS AND RETURNED AS FOLLOWS:
☐ A – No Objection
☐ B – Revise & Resubmit
(Work may proceed subject to
incorporation of changes indicated)
a C – Revise & Resubmit
☐
(Work may not proceed)
CONTRACTOR’S REPRESENTATIVE: ☐ D – Not Acceptable
The outcome of this review does not constitute acceptance of design, details,
calculations, analysis test methods or material developed or selected by the
Contractor / Subcontractor / Supplier and does not relieve the Contractor /
By: Date:
Corrections or comments made via submittals during this review do not relieve the contractor from compliance with the requirements of
Josefino Golosinda 13-Feb-2019