You are on page 1of 27

ETIHAD SOUTHSIDE CATERING FACILITY (ESCF) REGULATORY AND OPERATIONAL DERISKING

WORKS,ABU DHABI, UNITED ARAB EMIRATES

METHOD STATEMENT SUBMITTAL


REFERENCE No. : M1439-GHD-MCL-MSS-005 REV. 00 DATE: 05/02/2019

Method Statement and Risk Assessment for Existing Dry Type


SUBJECT : PROJECT No.: M1439
Transformer Reconditioning

TO: GHD Global Pty FROM: McLaren Construction LLC

Discipline :
Architectural Structural M.E.P Interiors External Other (state)

DOCUMENT DESIGNATION:

NO. OF
NO. DESCRIPTION / TITLE DOCUMENT NO. REVISION
COPIES
Method Statement and Risk Assessment
1 for Existing Dry Type Transformer M1439-MCL-S2.01-MSS-033 01 00
Reconditioning

FOR CONTRACTOR:
NAME: Martyn Robinson DESIGNATION: Project Manager SIGNATURE: _________DATE: 05/02/2019

ENGINEER’S COMMENTS:

1. Provide the testing and re-conditioning methodology of transformer at "Off state" condition as per manufacturer recommendations.
2. Include in the methodology to provide report summary of testing results conducted with images of the findings for Etihad record.
3. Ensure the reconditioning work shall be done as per original OEM guidelines or manufacturer recommendation reconditioning procedure.
4. Ensure safety officer is present during the live testing of the transformer.

DOCUMENT STATUS :
A – Approved (Work may proceed)
B – Approved with Comments (Work may proceed subject to incorporation of comments indicated)
x
GHD Global Pty Ltd.
DOCUMENT / DRAWINGS
C – Revise and Resubmit (Work may not proceed need to resubmit) REVIEW
THIS SUBMITTAL HAS BEEN REVIEWED FOR COMPLIANCE
WITH THE REQUIREMENTS AND RETURNED AS FOLLOWS:

☐ A – No Objection
☐ B – Revise & Resubmit
(Work may proceed subject to
incorporation of changes indicated)
a C – Revise & Resubmit

(Work may not proceed)
CONTRACTOR’S REPRESENTATIVE: ☐ D – Not Acceptable
The outcome of this review does not constitute acceptance of design, details,
calculations, analysis test methods or material developed or selected by the
Contractor / Subcontractor / Supplier and does not relieve the Contractor /

Snr. Elec. Engr. SIGNATURE: _________________ DATE: _________


Subcontractor / Supplier from full compliance with contractual obligations.

Josefino Golosinda DESIGNATION: ______________


NAME: _________________ 13-Feb-19
Contractor / Subcontractor / Supplier is responsible for:
1.
2.
3.
Compliance with the Client requirements
Coordination with other trades
Confirming and correlating all quantities and dimensions
4. Performing all work in a safe and satisfactory manner
5. Compliance with all relevant standards, building codes & authority
regulations
All previous comments must be incorporated.

By: Date:

Corrections or comments made via submittals during this review do not relieve the contractor from compliance with the requirements of
Josefino Golosinda 13-Feb-2019

the Contract Documents.

QMS009 (UAE) 09/15 Rev A Page 1 of 1 Method Statement Submittal


|

You might also like