1. THE CONTRACTOR SHALL PERFORM THE TEST BY PHASES ON ALL PIPING. FINAL PRESSURE TEST SHALL BE
DONE ONCE ALL SYSTEM COMPONENTS ARE INSTALLED BEFORE THE ACTUAL SITE TEST WITNESSING AND
APPROVAL.
2. ENSURE TO HAVE A VALID CALIBRATION CERTIFICATE BEFORE THE TESTING FOR ALL THE EQUIPMENT.
3. REFER TO COMMENTS IN THE MSS

Howell Laguna Mech. Engr. June 24, 2020


11/06/2020 Y

09/06/2020 Y

09/06/2020 Y
9/6/2020 Y

Kavit Rathi Sr. Site Engineer 11/06/2020

09/06/2020

Sheraz Ahmad QAQC Engineer 09/06/2020


1. Approved RAMS to be briefed to all involved in the activity prior to commencement of works AM
2. Works to be carried out as per Approved RAMS, McLaren and OSHAD Requirements. AM

3. Ensure that the exclusion zone is established, Warning signs installed and standby person AM
deployed to prevent authorized entry in pressure testing area.
TO BE UPDATED
INDICATE DURATION