1. THE CONTRACTOR SHALL PERFORM THE TEST BY PHASES ON ALL PIPING. FINAL PRESSURE TEST SHALL BE
DONE ONCE ALL SYSTEM COMPONENTS ARE INSTALLED BEFORE THE ACTUAL SITE TEST WITNESSING AND
APPROVAL.
2. ENSURE TO HAVE A VALID CALIBRATION CERTIFICATE BEFORE THE TESTING FOR ALL THE EQUIPMENT.
3. REFER TO COMMENTS IN THE MSS
09/06/2020 Y
09/06/2020 Y
9/6/2020 Y
09/06/2020
3. Ensure that the exclusion zone is established, Warning signs installed and standby person AM
deployed to prevent authorized entry in pressure testing area.
TO BE UPDATED
INDICATE DURATION