1. ENSURE TO INCLUDE ALL TESTING AND COMMISSIONING SHEET FORM BEFORE THE TESTING.
2. THE CONTRACTOR SHALL PERFORM THE INITIAL TEST BEFORE THE ACTUAL SITE TEST WITNESSING
AND APPROVAL.
3. ALL SWITCHGEAR MUST PASSED THE FACTORY TEST AND HAVE STAMPED PRIOR TO DELIVERY TO
SITE.
4. ENSURE TO HAVE A VALID CALIBRATION CERTIFICATE BEFORE THE TESTING FOR ALL THE
EQUIPMENT.