This document outlines requirements for a building management system project handover. It requests inclusion of calibration certificates for tools used, checklists for installation, cabling, testing, commissioning and verification of the equipment sequence of operation controlled by the BMS. The document was prepared by Kavit Rathi, signed by N. Sremac on 21/06/2020 and requires updating.
This document outlines requirements for a building management system project handover. It requests inclusion of calibration certificates for tools used, checklists for installation, cabling, testing, commissioning and verification of the equipment sequence of operation controlled by the BMS. The document was prepared by Kavit Rathi, signed by N. Sremac on 21/06/2020 and requires updating.
This document outlines requirements for a building management system project handover. It requests inclusion of calibration certificates for tools used, checklists for installation, cabling, testing, commissioning and verification of the equipment sequence of operation controlled by the BMS. The document was prepared by Kavit Rathi, signed by N. Sremac on 21/06/2020 and requires updating.
Include checklists for installation, cabling, testing and commissioning. Include checklists for verification of sequence of operation for equipment controlled by the BMS.