Professional Documents
Culture Documents
1. No objection to MSS.
2. Installation subject to MIR approvals.
3. Installation subject to shop drawings approvals.
4. Subject to mock up installation approval.
5. Installer of equipment and accessories shall be duly qualified by manufacturer/authority
6. Method statement for shower mixer, kitchen sink to be included.
7. Refer to comments found in this sheet.
19/05/2020 Y
18-5-2020 Y