Method Statement For Finishing Work & MEP Services

SMART BUILD TECHNICAL SERVICES


MSRA FOR MEP ITEMS INTERNAL FINISHING AND

Document no ……….
Prepared by:
SMART BUILD TECHNICAL SERCICES L.L.C
DUBAI UNITED ARAB EMIRATES
www.smatbuild.ae

Prepared For:

REVISION HISTORY

REV.NO DATE DDESCRIPTION


RO 20th February 2021
Draft 20th February 2021

APPROVALS

Author 20-02-2021
Reviewed By 20-02-2021
Approved By 20-02-2021
NAME SIGNATURE DATE
Page 2
Method Statement For Finishing Work & MEP Services
INDEX

1. SCOPE
2. PURPOSE
3. REFFERENCES
4. DEFINITION
5. RESPONSIBILITIES
6. GENERAL EQUIPMENT
7. PROCEDURE
8. QA/QC
9. HOUSEKEEPING
10.SAFETY
11.ATTACHMENTS
12. Purpose & Scope
13. Definitions
14. Responsibilities
15. Health, Safety & Environment
16. Material
17. Equipments
18. Process
19. Health and Safety Provision
20. QC Approval and Documents Requirements

1. SCOPE
This method statement is for installation of MEP Services and finishing work as set out in
specification, approved drawings, code and standards reference within the Project ………………
control Documents.

2. PURPOSE
The purpose of this method statement is to define the “Cabins Finishing & MEP Services”
through the guidelines contained herein so as to ensure that the job exestuation complies with
the requirements of the Contract Specification and guidelines to achieve satisfactory level.

3. REFFERENCES
Page 3
Method Statement For Finishing Work & MEP Services

4. DEFINITION

QA/QC- Quality Assurance and Quality Control

ITP-Inspection and Test Plan

IR-Work Inspection Request

Construction Supervisor – M/s Mott MacDonald

RA- Risk Assessment

PMO – Project Management Office

5. RESPONSIBILITIES
The Project Manager:

 The Project Manager is over all responsible for the Quality and Safety implementation of the
work procedure.
 The Project Manager is to ensure that the team of engineers and foreman are aware of this
MS and to ensure that all resources (Labor, Material and Equipment) are available to carry
out the work as planned.
 The Project Manager will ensure that all the required documentation to conduct the activity
safety has been submitted and approved by CSC and approved copies are given to the
responsible Site/Project Engineer.

The Project Engineer

 The Project Engineer is responsible for to carryout work as per approved MS. He is also
available and responsible to ensure adequate equipment for mobilization work are in the
place for prior to start the work. He shall ensure that all the employees are advised of the
method to be applied and shall be required to register his attendance on method
Statement.

QA/QC Engineer

 QA/QC Engineer is responsible for all the quality control drawings, inspection and quality
control work plan and arrange inspection as per client specification and approved standards
and procedure.
Page 4
Method Statement For Finishing Work & MEP Services

SAFETY Officer

 Safety Officer is responsible for all the health safety and environment issues
 Safety Officer is responsible to ensure all the approved safety procedure to work and
permit to work procedure is followed at the work place.
 Safety Officer is responsible for all the workers followed proper work procedure and proper
use of all personnel protective equipment.
 Safety Officer is responsible to ensure that all the approved safe system of work- MSRA,
Lifting Plan, Approved Work Procedure, PTW ets is available at work site and followed by
workers at work site.
 Safety Officer will ensure that only approved/inspected equipment with valid 3 rd party
certification is utilized at work site.

1. GENERAL EQUIPMENT
 MANPOWER
Manpower requirement such as Project Manager, Project Engineer, QA/QC
Engineer, Safety Engineer/Officer, Supervisors, Labors and Helper available at site
depends upon work requirement
 EQUIPMENT
 Measuring Tape
 Pipe Cutter/ Hacksaw
 Sprit Level
 Sleeves or Puddle Flanges
 Nylon String / Twine
 Steel Hammer
 Paint Roller
 Standard hand tools
 Standard Carpentry tools & equipment
 Portable power tools
 Standard Electrical Tools & equipment Standard hand tools
 MATERIAL
 Approved Material
Page 5
Method Statement For Finishing Work & MEP Services
 DRAWINGS
 Approved Drawings
 SEQUENCE OF WORK (METHOD)
 To carry out MEP and

CLIENT
CONSULTANT
SUPERVISION
MAIN CONTARCTOR
ITP
MS
MTS
RA
1.0 REFERENCE DOCUMENTS
Materials Approval Request
Approved Material Submittal
2.0 RESPONSIBILITIES

5.1 The Project Manager is over all responsible for the Quality and Safety implementation of the
work procedure to ensure that the team of engineers and foreman are aware of this MS and to
ensure that all resources ( Labor, Material and Equipment) are available to carry out the work as
planned.

5.2 The Project Engineer is responsible for to carryout work as per approved MS. He is also available
and responsible to ensure adequate equipment for mobilization work are in the place for prior to
start the work. He shall ensure that all the employees are advised of the method to be applied and
shall be required to register his attendance on method Statement.

5.3 QA/QC Engineer is responsible for all the quality control drawings, inspection and quality control
work plan and arrange inspection as per client specification and approved standards and procedure.

5.4 HSE Engineer/Officer is responsible for all the health safety and environment issues and to
ensure all the approved safety procedure to work and permit to work procedure is followed at the
Page 6
Method Statement For Finishing Work & MEP Services
work place and all the workers followed proper work procedure and proper use of all personnel
protective equipments.

6. MATERIALS …………………

7. EQUIPMENTS ………………

8. PROCESS ………………

9. HEALTHE, SAFETY AND ENVIRONMENT…………….

10. HEALTH SAFETY AND PROVISION ………………

11. QA/QC APPROVAL AND DOCUMENTATION ………………