Submittal Data Transmittal

Specification Section
03 3000
Shaded areas to be completed by Haskell Architects and Engineers File No: 033000-126-1
Project Number: 3101003/001 Project Name: Urdaneta Philippines Temple Date: 06-Mar-2020
Project Location: Urdaneta, Pangasinan Project Manager: Randy Patterson

TO BE COMPLETED BY SUBCONTRACTOR OR MATERIALS SUPPLIER


Submitted by (print company name): Haskell Company Philippines, Inc.
Item # of Copies
Submittal Type Submittal Description
Number Sent

1 1 Shop Drawings Floor Penetration Shop Drawings

Use: Temple Building 3rd Level (Electrical, Plumbing, Fire Protection, Mechanical)

Reviewed & Approved by:___________________________________________________________________________


Signature Printed Name

SUBMITTAL REVIEW STATUS REVIEWED NO EXCEPTIONS TAKEN


THIS REVIEW IS ONLY FOR GENERAL CONFORMANCE TO
THE CONTRACT DOCUMENTS AND THE DESIGN INTENT
EXCEPTION TAKEN AS NOTED
THEREOF. THIS REVIEW AND ANY COMMENTS MADE DO
NOT RELIEVE THE CONTRACTOR OF ANY REQUIREMENTS
REJECTED REVISE AND RESUBMIT
SET FORTH IN THE CONTRACT DOCUMENTS. THE
CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND
SUBMIT SPECIFIED ITEM
CORRELATE WITH OTHER TRADES PRIOR TO FABRICATION.
ANY CHANGES NOT IN FULL COMPLIANCE, OR THAT Review is only for general compliance with design
INVOLVE COST INCREASES OR DECREASES, OR THAT
AFFECT THE PROJECT SCHEDULE REQUIRE A CHANGE
concept. Comments made on the submittal during
ORDER. review do not relieve contractor from compliance with
NO EXCEPTIONS NOTED the requirements of the Construction Documents.
X REVISE AS NOTED Review of a specific item shall not infer review or
RESUBMIT approval of an assembly of which the item is a part.
REJECTED Contractor is responsible for: dimensions to be
REVIEW DATE: 03/24/2020 confirmed at the job site; information pertaining solely
REVIEWED BY: BPG to fabrication processes; and to the means, methods,
techniques, sequences and procedures of construction.
MCM
By _________________________ Date 03/24/2020
____________
ARW Engineers, PC Ogden, Utah

Completion by Submittal Clerk Submittal Types


Date Received: _____________________ AB As-Built PD Product Data *STATUS KEY
CA Calculations SA Samples
No. of Copies Received_______________ MC Material Certs SC Schedule 1 - No Exceptions Taken
MD Mix Designs SD Shop Drwgs 2 - Make Corrections Noted
Date Returned to P.M.________________ OM O & M Manual TR Test Reports 3 - Revise & Resubmit
OT Other WA Warrantee
No. of Copies Returned:_______________212066M
1 2 3 4 5

Penetrations Legend

REG. NO.
Site Electric Conduit Sanitary Waste/Vent Pipe Electrical Power Conduit Fire Protection Pipe Electrical Data Conduit Plumbing Pipe Mechanical Duct

D D
1 2 3 4 5 6 7 8 9 10 11 12
2301 2774 4350 4675 9900 3200 3200 10700 3875 1950 6126

2442 610 1623 1685 610 906 6811 2291 610 988 1086

A A A
ARW Comment:
265mm Slab Opening 265mm Slab Opening
1925

1925
Could these moved here or
6" (150mm) ROOF DRAIN PIPE 6" (150mm) ROOF DRAIN PIPE
have more room between
them and other openings?

588
B B B
VERIFY OPENING SIZE: GREEN
BACKGROUND DUCTS LOOK LARGER 312 911 3453 7009 98 1158 1635
THAN THE OPENING SHOWN.

562 4113 1135 4423 1071 218 3053 2047 193 959 850 265mm Slab Opening
150mm Slab Opening 6" (150mm) ROOF

4160
4" (100mm) VENT DRAIN PIPE
135
5825

5825
140mm Slab Opening 410 304

5237
1 1/2" (40mm) DHW PIPE 520
210mm Slab Opening 279
120mm Slab Opening 460 149 303
4" (100mm) ROOF DRAIN 520 703 429 597 3278
3/4" (20mm) DHW PIPE PIPE 220
303 380
150mm Slab Opening 443 310 360 100mm Slab Opening 100mm Slab Opening 410 300 1650 100mm Slab Opening
4" (100mm) FP PIPE 470 2" (50mm) VENT
451 2" (50mm) VENT
303 2" (50mm) VENT

1665
360
C 138 264 Slab Opening C

314
895

467

314
402
314
447
380

412

303
314

470
342 FLOOR DRAIN

314
1067 534 304 (50mm) WASTE PIPE
C C C

412

517

492
372314

342

494
304 232 266

520
524
533
577
790

412

303 470 412

467
503
576 826 1026
1433

452 470

470
956 260

260
276
344
276
244

363

303

513
360
3175

3175
2113

358

357
360
358
857 2651

2655
550
342 130mm Slab Opening

191
470
470
2385

303
130mm Slab Opening

260
408

310

372
383

310

TEMPLE LDS URDANETA


3" (80mm) SANITARY

1700
3" (80mm) SANITARY PIPE

PUERTO COLOMBIA - ATLANTICO COLOMBIA


1117

1476
293

541

303
311
105
246

303
PIPE
304

210mm Slab Opening 1440

Urdaneta Philippines Temple


304 3435
264
859

FLOOR DRAIN 260 1350 752 260


265mm Slab Opening 484 3" (80mm) WASTE PIPE 303
D 266
6" (150mm) ROOF 361 D D

510
1780

640
NOTED

98
427

187
266 DRAIN PIPE 303
200mm Slab Opening 660 1383
203
slab opening duct

2030

260
922 894 470
351
388
305
267
2325

427
375

2325
2325
3 1/2" (90mm) HWS PIPE Slab Opening

2138

1685
303 FLOOR DRAIN
from ahu unit

260
200mm Slab Opening
351 (50mm) WASTE PIPE
224
3 1/2" (90mm) HWR PIPE
295

E 250 mm FLOOR OPENING


196 E E

224
250
4" (100mm) CWS PIPE
236

150 311
290 ARW comment: 260 3759
137 157 303

1663
Can these be spaced 130mm Slab Opening 2860 521 72
351
2325

2325
3" (80mm) SANITARY
308 further apart or turned 90 s3
375

100mm Slab Opening

361
267

303
427

136
167
305

1910
388
351

470 PIPE 260


193
degrees to be parallel with 4134 4288 1478 2" (50mm) FP PIPE
293
196
155

Grid E?
351

662
100mm Slab Opening

252 8
268
F F F

122
303 2" (50mm) SANITARY

260
138 263 520

700
NOTED 260 PIPE

1043
443 380 289

303
311
303 303 303 100mm Slab Opening

1476
1496

2375
310 361 521 438 303 2" (50mm) VENT
can't move beside wall 470 875 830 303 361 769

2385
471
303

2649
265mm Slab Opening
303
470
372

353
260
388

361
303
3175

3175
as commented due to

180 1766
s3

6" (150mm) ROOF


276
259
304
400

399 310
s

463

311
531

303
DRAIN PIPE
576 826 1026
beam mark with red line

14
497

304 258 304

800
303

186
623

623
303
597

303

589

303
470
610 575

303
372

550

303
470
310

534

529

526
245
303

819
G s3 G G
668

s3 30mm Slab Opening 231 1064


4249 100mm Slab Opening 250mm Slab Opening
3/4" (20mm) LIGHTING 98 30mm Slab Opening 461

1842
2" (50mm) VENT 4" (100mm) HWR PIPE
1985

101 309 CONDUIT PIPE 128 (8) 3/4" (20mm)


2581

265mm Slab Opening 303


2701

72 POWER CONDUIT 303


300mm Slab Opening 150mm Slab Opening
6" (150mm) ROOF 65mm SLEEVE FOR 100mm Slab Opening 520 361
6" (150mm) CWR PIPE 4" (100mm) VENT 96
DRAIN PIPE 3" (80mm) VENT 50mm Slab Opening 303 303
2" (50mm) VENT
280

B 90mm Slab Opening


VERIFY ROOF DRAIN LOCATION: IT LOOKS LIKE (3) 1 1/2" (40mm) 489 263 B
THEY ARE TO CLOSE TO THE SQUARE OPENING TO POWER CONDUIT

5237
265mm Slab Opening 1 1/2" (40mm) DCW PIPE ALLOW FIRE SMOKE DAMPER INSTALL
5825

5825
610

4" (100mm) HWR PIPE


610

1570

130mm Slab Opening 265mm Slab Opening 80mm Slab Opening 265mm Slab Opening
5215

5157

1 1/2" (40mm) DHW PIPE 6" (150mm) ROOF (2) 2 1/2" (65mm) 6" (150mm) ROOF
265mm Slab Opening DRAIN PIPE POWER CONDUIT DRAIN PIPE

3983
6" (150mm) ROOF
324

3 1/2" SLEEVE FOR


DRAIN PIPE 1" (25mm) DHW PIPE
2635

2515

300mm Slab Opening


1666

6" (150mm) CWR PIPE

588

588
H H H
1925

1925
J J J

2583 1767 927 8973 1683 610 907 9103 610 987

1544 8829
47 47
47 47
982 2868 1709 2127 2215 2205 995 47 47 6511 4189
47

1 2 3 4 5 6 7 8 9 10 11 12
2301 2774 4350 4675 9900 3200 3200 10700 3875 1950 6126

ARW Comment: SUBMITTAL REVIEW STATUS


THIS REVIEW IS ONLY FOR GENERAL CONFORMANCE TO
See detail 12/T-S510 for clarification regarding THE CONTRACT DOCUMENTS AND THE DESIGN INTENT
THEREOF. THIS REVIEW AND ANY COMMENTS MADE DO
reinforcement that is discontinued at openings and is not NOT RELIEVE THE CONTRACTOR OF ANY REQUIREMENTS
SET FORTH IN THE CONTRACT DOCUMENTS. THE DESCRIPTION DATE
already specifically detailed in reinforcement shop CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND
CORRELATE WITH OTHER TRADES PRIOR TO FABRICATION.
drawings. Discontinued reinforcing shall be replaced so ANY CHANGES NOT IN FULL COMPLIANCE, OR THAT We hereby expressly reserve the
INVOLVE COST INCREASES OR DECREASES, OR THAT
property rights to this drawing and
A 1 2 3 4 5 that the total amount of discontinued reinforcement shall be 6 7 8 9 10 11 12 AFFECT THE PROJECT SCHEDULE REQUIRE A CHANGE
ORDER.
it is not to be reproduced, copied in A
placed equally on each side of the opening and extended NO EXCEPTIONS NOTED any format or manner whatsoever
as shown in detail 12/T-S510 beyond the opening edge of X REVISE AS NOTED without first obtaining our express
RESUBMIT written permission and consent.
the opening. Where possible, place openings such that no REJECTED
reinforcement is interrupted. 03/24/2020 DRAWN: CHECKED:
REVIEW DATE:

REVIEWED BY: BPG DSP RCC


MECHANICAL LEVEL FLOOR AE JOB NUMBER
PENETRATION PLAN
1 33646
1 : 75
MECHANICAL
LEVEL FLOOR
PENETRATION
PLAN
Z - 310
SHEET NUMBER

1 2 3 4 5

You might also like