Shaded areas to be completed by Haskell Architects and Engineers File No: 033000-126-1
Project Number: 3101003/001 Project Name: Urdaneta Philippines Temple Date: 06-Mar-2020
Project Location: Urdaneta, Pangasinan Project Manager: Randy Patterson
Use: Temple Building 3rd Level (Electrical, Plumbing, Fire Protection, Mechanical)
Penetrations Legend
REG. NO.
Site Electric Conduit Sanitary Waste/Vent Pipe Electrical Power Conduit Fire Protection Pipe Electrical Data Conduit Plumbing Pipe Mechanical Duct
D D
1 2 3 4 5 6 7 8 9 10 11 12
2301 2774 4350 4675 9900 3200 3200 10700 3875 1950 6126
2442 610 1623 1685 610 906 6811 2291 610 988 1086
A A A
ARW Comment:
265mm Slab Opening 265mm Slab Opening
1925
1925
Could these moved here or
6" (150mm) ROOF DRAIN PIPE 6" (150mm) ROOF DRAIN PIPE
have more room between
them and other openings?
588
B B B
VERIFY OPENING SIZE: GREEN
BACKGROUND DUCTS LOOK LARGER 312 911 3453 7009 98 1158 1635
THAN THE OPENING SHOWN.
562 4113 1135 4423 1071 218 3053 2047 193 959 850 265mm Slab Opening
150mm Slab Opening 6" (150mm) ROOF
4160
4" (100mm) VENT DRAIN PIPE
135
5825
5825
140mm Slab Opening 410 304
5237
1 1/2" (40mm) DHW PIPE 520
210mm Slab Opening 279
120mm Slab Opening 460 149 303
4" (100mm) ROOF DRAIN 520 703 429 597 3278
3/4" (20mm) DHW PIPE PIPE 220
303 380
150mm Slab Opening 443 310 360 100mm Slab Opening 100mm Slab Opening 410 300 1650 100mm Slab Opening
4" (100mm) FP PIPE 470 2" (50mm) VENT
451 2" (50mm) VENT
303 2" (50mm) VENT
1665
360
C 138 264 Slab Opening C
314
895
467
314
402
314
447
380
412
303
314
470
342 FLOOR DRAIN
314
1067 534 304 (50mm) WASTE PIPE
C C C
412
517
492
372314
342
494
304 232 266
520
524
533
577
790
412
467
503
576 826 1026
1433
452 470
470
956 260
260
276
344
276
244
363
303
513
360
3175
3175
2113
358
357
360
358
857 2651
2655
550
342 130mm Slab Opening
191
470
470
2385
303
130mm Slab Opening
260
408
310
372
383
310
1700
3" (80mm) SANITARY PIPE
1476
293
541
303
311
105
246
303
PIPE
304
510
1780
640
NOTED
98
427
187
266 DRAIN PIPE 303
200mm Slab Opening 660 1383
203
slab opening duct
2030
260
922 894 470
351
388
305
267
2325
427
375
2325
2325
3 1/2" (90mm) HWS PIPE Slab Opening
2138
1685
303 FLOOR DRAIN
from ahu unit
260
200mm Slab Opening
351 (50mm) WASTE PIPE
224
3 1/2" (90mm) HWR PIPE
295
224
250
4" (100mm) CWS PIPE
236
150 311
290 ARW comment: 260 3759
137 157 303
1663
Can these be spaced 130mm Slab Opening 2860 521 72
351
2325
2325
3" (80mm) SANITARY
308 further apart or turned 90 s3
375
361
267
303
427
136
167
305
1910
388
351
Grid E?
351
662
100mm Slab Opening
252 8
268
F F F
122
303 2" (50mm) SANITARY
260
138 263 520
700
NOTED 260 PIPE
1043
443 380 289
303
311
303 303 303 100mm Slab Opening
1476
1496
2375
310 361 521 438 303 2" (50mm) VENT
can't move beside wall 470 875 830 303 361 769
2385
471
303
2649
265mm Slab Opening
303
470
372
353
260
388
361
303
3175
3175
as commented due to
180 1766
s3
399 310
s
463
311
531
303
DRAIN PIPE
576 826 1026
beam mark with red line
14
497
800
303
186
623
623
303
597
303
589
303
470
610 575
303
372
550
303
470
310
534
529
526
245
303
819
G s3 G G
668
1842
2" (50mm) VENT 4" (100mm) HWR PIPE
1985
5237
265mm Slab Opening 1 1/2" (40mm) DCW PIPE ALLOW FIRE SMOKE DAMPER INSTALL
5825
5825
610
1570
130mm Slab Opening 265mm Slab Opening 80mm Slab Opening 265mm Slab Opening
5215
5157
1 1/2" (40mm) DHW PIPE 6" (150mm) ROOF (2) 2 1/2" (65mm) 6" (150mm) ROOF
265mm Slab Opening DRAIN PIPE POWER CONDUIT DRAIN PIPE
3983
6" (150mm) ROOF
324
2515
588
588
H H H
1925
1925
J J J
2583 1767 927 8973 1683 610 907 9103 610 987
1544 8829
47 47
47 47
982 2868 1709 2127 2215 2205 995 47 47 6511 4189
47
1 2 3 4 5 6 7 8 9 10 11 12
2301 2774 4350 4675 9900 3200 3200 10700 3875 1950 6126
1 2 3 4 5