DESCRIPTION *(ISSUER shall keep the Description to the point. If Filling by hand, use clear open letter handwriting)
REFERENCES
1. DESCRIPTION OF SITE OBSERVATION
Photo 1 Photo 2
Description Descitption
CONTRACTOR TO LIST THE PROSPOSED CORRECTIONS TO BE IMNPLEMENTED (* Not Required for PAN)
2. PROPOSED CORRECTIONS
RECEIVER SHALL LIST THE ROOT CAUSE THAT LEAD TO THE OCCURANCE OF DEFICIENCY (* Not Required for PAN)
3. ROOT CAUSE
CONTRACTOR TO LIST THE CORRECTIVE/PREVENTIVE ACTIONS THAT HAVE BEEN IMPLEMENTED (*Optional for PAN)
4. CORRECTIVE / PREVENTIVE ACTIONS
S.O ORIGINATOR SHALL REVIEW THE IMPLEMENTED CORRECTIONS (* FOR PAN notifications, Contractor Acknowledgement is only required)
Implemented correction and corrective/ preventive action(s) were found to be satisfactory & this S.O is considered closed.
Implemented correction and corrective/ preventive action(s) were found to be not satisfactory. Works have to be redone as per the approved proposal. This S.O is considered opened.
5. REVIEW AND CLOSURE
Corrections were not completed by the ACD date and has been escalated to next level as per QDC Non-CONFORMANCE escalation procedures.
REMARKS
NAME DESIGNATION
ORIGINATOR RECIPIENT
DISTRIBUTION
OTHER (Specify:_________________________) OTHER (Specify:_________________________)