P20028-CP01-NCN-085-22
Test Inspection
Description of Non-Conformance:
Engr. Ja ys on Arguelles / Ja nuary 28, 2022/ Engr. Ma rk Loi e Villanueva/ January 28, 2022/
GMCPMI QA/QC (Na me/Da te/Si gna ture) GMCPMI PM (Na me/Da te/Si gna ture)
Acknowledge by:
______________________________________
Contractor’s Rep (Name/Date/Signature) Contractor’s PM (Name/Date/Signature)
Approved by:
______________________________________ ______________________________________
GMCPMI QA/QC (Name/Date/Signature) GMCPMI PM (Name/Date/Signature)
___________________________________________
Contractor’s Representative (Name/Date/Signature)
3. Supporting Documents:
Accepted by:
______________________________________ ______________________________________
GMCPMI QA/QC (Name/Date/Signature) GMCPMI PM (Name/Date/Signature)
Noted by:
______________________________________ ______________________________________
SMDC PO (Name/Date/Signature) SMDC PM (Name/Date/Signature)
Non-complying work may be required to be removed and replaced at no cost to the Owner. It shall be your
responsibility to determine the corrective action necessary, and to determine whether you wish to discontinue
operations until additional investigations by the Owner or Project M anager confirm or refute the initial findings.