FIELD OBSERVATION REPORT (FOR)

STRUCTURAL WORKS
Project : Nara Residences by Rockwell FOR Reference No. : 91-RLC-FOR-<contractor>-001
Package : Date Filed : January 29, 2020

Attention : From : Chris Gecha

Thru : RLC - Project Manager

PART I: INSPECTION REPORT


Date and Time Noted Physical Status as REFERENCE
Field Observation
Location of FOR Issuance (Contract, Drawings and/or Specs, etc.)

29-Jan-2020
10:00AM
RECTIFICATION OF CRACKS ON SLAB SOFFIT. NOT DONE PHOTO
PODIUM LEVEL -
NEAR FIRE EXIT 2

Attachments : PHOTO

Comments :

Prepared by : Noted by :
Please submit
corrective measures on
or before :
______________________
CHRIS GECHA
RLC - PMT FOR Initiator RLC - Coordinator RLC - General Manager 30-Jan-20
PART II: CONTRACTOR'S RESPONSE
We acknowledge receipt of Non-Compliance Received:
Report and give response/feedback with respect to
the agreed date

(Stamped with Date and Time)


Contractor's Authorized Representative

Correct/Preventive Measures:

PART III: FOR CLOSEOUT (RLC - Contractor Joint Inspection)


REMARKS
Field Observation Date and Time of Inspection
Acceptable Not Acceptable

Inspected by : Noted by :

________________________ ______________________________ _____________________________________


Jason Villamor Contractor's Representative Rodel Ferrer
RLC - PMT FOR Initiator RLC - Constrution Manager
knj2008
Form 91-S-015 (Jan 2020)
TRADE STRUCTURAL 001

FOR NO 1

DATE FILED January 29, 2020

FIELD OBSERVATION RECTIFICATION OF CRACKS ON SLAB SOFFIT.

DATE NOTED Jan-29-20


TIME NOTED 10:00AM

LOCATION NOTED PODIUM LEVEL - NEAR FIRE EXIT 2


PHYSICAL STATUS AS OF FOR ISSUANCE NOT DONE
REFERENCE PHOTO
ATTACHMENT PHOTO

COMMENTS

PREPARED BY (INITIATOR) Jason Villamor (RLC)


NOTED BY (COORDINATOR) JASON VILLAMOR (RLC)