Non-Conformance Report
During site surveillance it has been found that Failed to arrange curing arrangements for the previous day
poured concrete. Knowing that it has cause a crack and affect the strength. See attached photos
Location : Export metering systems , base slab of metering pit.
5. Disposition:
2. Approval of Disposition /
Disposition completed by (Auditee/
Originated by: Auditor / Disposition Accepted by:
department):
Regional Quality Manager & IMR
Name: ______________________ Name: ______________________
Name: ______________________
Sign: ______________________ Sign: ______________________
Sign: ______________________
Date: ______________ Date: ______________
Date: ______________
Non-Conformance Report