REQUEST FOR INSPECTION AND TESTING (RFIT)

Project : LAKEFRONT RESIDENCE


RFIT Reference No : ______________________________________________________________________________________________
(RFIT / TRADE / LOCATION / ACTIVITY / YEAR / XXX)

Location : TOWER 1 & 2 LEVEL 1, CP1 & CP2

Description of Work : CARD ACCESS READER RELOCATION AT LEVEL 1, CARPARK 1 AND CARPARK 2

Request Date : 4/9/2020

Following works will be ready for inspection on (Date) : 4/9/2020 at ( am / pm ) : 10:00 AM

1ST INSPECTION (To be filled by Client’s Representative / Consultant / QAQC)


Date / Time : ________ / ________
Inspected by : (name)_______________________(signature)_________

Comment : _________________________________________________________________________________________

Inspector please tick  in box.

Inspection passed. The Contractor is allowed to proceed to next stage of works.

Remedial work listed below to be completed and re-inspection is required.

Remedial work listed below to be completed and no further inspection is required.


Remarks : _____________________________________________________________________________

2ND INSPECTION (To be filled by Client’s Representative / Consultant / QAQC)


Inspected by : (name)_________________(signature)___________ Date / Time : ______ / ______

Comment : __________________________________________________________________________________

Inspector please tick  in box.


Inspection passed. The Contractor is allowed to proceed to next stage of works.

Remedial work listed below to be completed and re-inspection is required.

Remedial work listed below to be completed and no further inspection is required.


Remarks : _____________________________________________________________________________

REQUEST APPROVAL
Requested By Checked By Verified By Accepted By
Subcontractor Representative Project Representative QAQC Representative Consultant’s Representative
[Main Contractor] [C&S / ARCH / M&E / LANDS]

___________________ ___________________ _________________ _________________


Name : Name : Name : Name :
Date : Date : Date : Date :
Designation : Designation : Designation : Designation :
Engineer Site Supervisor

Doc. Ref.: FM - CO - P07 - 01 Rev. No.: 3 Effective Date: 1 APRIL 2019