DOHA CONVENTION CENTER &

TOWER PROJECT
Package-BP 02B

REQUEST FOR INSPECTION AND APPROVAL (R F I A)

REQUESTIONER NAME: Ref: RFIA-SM-BP02B-M- DATE: ___________

AREA: (Sketch attached) SUBMITTED TO: MURPHY/JAHN, HYDER


DATE & TIME OF INSPECTION: Date: ________________________ / Time:____________________
_________________________ Comments: _________________________________________________________________________
Discipline
 Structural/civil ___________________________________________________________________________________
 Architectural
 MEP ___________________________________________________________________________________
SHOP DRAWING/DESIGN DRAWING: Rev.

STATUS:
ITEM TO BE INSPECTED : LOCATION
____________________________________________________________ Sector : _____________________________
____________________________________________________________ Level : _____________________________
____________________________________________________________ Grids : ______________________________

The above works have been checked by QA/QC department representative for completeness, accuracy, coordination and are
confirmed to comply with the contractual documents.

Date: ___________________________ Time: ______________ ___________________________________________


(PRINT NAME & SIGN)

Notes:

1. This document shall not be used to specify acceptance of the aspect of test; this can only be achieved by sign off of
appropriate inspection report which shall be attached hereto.

Accepted
A B Accepted with comments C Rejected

REMARKS:

Supervision Consultant. DATE: ____________________


________________________________
(PRINT NAME & SIGN)
TIME: ____________________

QC Dept. REP. Received: To be Revised: DATE:

________________________

Form – F08 Page 1 of 2


DOHA CONVENTION CENTER &
TOWER PROJECT
Package-BP 02B

(PRINT NAME & SIGN)

Form – F08 Page 2 of 2