This form is to be used for describing the review comments related to Contractor post contract award submittals of
management plans, procedures, method statements, inspection test plans, risk assessments, Pre-qualification,
materials, mock ups, test reports, drawings, etc. that can lead to one of the following outcomes.
‘A: Reviewed C: Revise and Resubmit
B: Reviewed as noted D: Cancelled
itec ae cd
Ce Soe
Coe oc NPPOO8S-LTR-JEC-NPP-0280
pea MS, ITP, RA for Construction iin ema aa
Pee ec
elena aca
Peete B: Reviewed as noted
Bs
Sues
Related to eer rer
Ge ol ran) is
Section | Remove “Agreed by the Engineer” and
a 62-81 Add “Acceptance by the Engineer” MCN Bi
HSECOMMENTS
MS should be reviewed & signed by HSE
Manager, JEC shall ensure that the
Section 5.1 | subcontractor is adhering 0 JEC health &
Health & | safety plan and to comply at site and shall | PMC - VC
1 | Safety | be verified and ensured by JEC not by ®
subcontractor
JEC to incorporate in MS.
Name: Mahmoud A. Hela Name: Vinay Kumar | Name: Barry Ennis Project Director
HSE Manager
“f o
Signature ‘Signature ie
Date: 17.04.2018 Date: 17.04.2018
Note:
This recommendation for approve soll not relieve the contactor from his obligation to provide materials or equipment that are “it for
purpose” and shall ben accordance to contrac requirements and approved designs. In the event, that any supplied Material and/or equipment.
‘rovided/nstaled by this Subcontractor/suppler is not ‘ft for Purpose” or does not comply In whole or part with contract
Specifeations/Design, therefore, the employer shall be held harmless and contractor shall propose and Provide/instll on alternative
“Materil/equipment upon securing opprovel et no adelitional cost and withno delays to works.
FoRwwop-c6en08 (07/2012) Page tof