You are on page 1of 1
203 clixo equito Contractor’s Submittal Review Comments ee {CSRC form) This form is to be used for describing the review comments related to Contractor post contract award submittals of management plans, procedures, method statements, inspection test plans, risk assessments, Pre-qualification, materials, mock ups, test reports, drawings, etc. that can lead to one of the following outcomes. ‘A: Reviewed C: Revise and Resubmit B: Reviewed as noted D: Cancelled itec ae cd Ce Soe Coe oc NPPOO8S-LTR-JEC-NPP-0280 pea MS, ITP, RA for Construction iin ema aa Pee ec elena aca Peete B: Reviewed as noted Bs Sues Related to eer rer Ge ol ran) is Section | Remove “Agreed by the Engineer” and a 62-81 Add “Acceptance by the Engineer” MCN Bi HSECOMMENTS MS should be reviewed & signed by HSE Manager, JEC shall ensure that the Section 5.1 | subcontractor is adhering 0 JEC health & Health & | safety plan and to comply at site and shall | PMC - VC 1 | Safety | be verified and ensured by JEC not by ® subcontractor JEC to incorporate in MS. Name: Mahmoud A. Hela Name: Vinay Kumar | Name: Barry Ennis Project Director HSE Manager “f o Signature ‘Signature ie Date: 17.04.2018 Date: 17.04.2018 Note: This recommendation for approve soll not relieve the contactor from his obligation to provide materials or equipment that are “it for purpose” and shall ben accordance to contrac requirements and approved designs. In the event, that any supplied Material and/or equipment. ‘rovided/nstaled by this Subcontractor/suppler is not ‘ft for Purpose” or does not comply In whole or part with contract Specifeations/Design, therefore, the employer shall be held harmless and contractor shall propose and Provide/instll on alternative “Materil/equipment upon securing opprovel et no adelitional cost and withno delays to works. FoRwwop-c6en08 (07/2012) Page tof

You might also like