You are on page 1of 1
99 lino cayuito HAMAD FoR! RECT Contractor's Submittal Review Comments (CSRC form) » 3b Gigs Dorsch Qatar This form isto be used for describing the review comments related to Contractor past contract award submittals of ‘management plans, procedures, method statements, inspection test plans, risk assessments, Pre-qualif ‘materials, mock ups, test reports, drawings, etc. that can lead to one of the following outcomes. <1, "12/7, é Tinevae anpezeubalWTiNET “OD v D:Cancelled™) jg ‘A: Reviewed B: Reviewed as noted Cetera ecm cle Ceca ce ‘L/383/NPP/SK/aa/17/0059 ae Pau eee os Wel uumer canes cere ete B: Reviewed as noted Perec 12-Apr-2018 Quality Check p ca Dey) 12-Apr-2018 Eee cries Peer rsy rts) per eee Tes Cyeeneen pales eee oe Initials) ci Section | Add point for updating regularly : 1 6.1.10 | equipment calibrations certificate PMC M E ‘Add allowing for third party survey 2 id Inspection as per PMC/HPP requirement. | PMC-MH 8 ‘vPPOGBS- | Coding legend equivalent Required for ecTe- | involvement should be provided as footer 3 | 9001 | on the ITP sheet or any in the bottom | pracaae 7 space of the form and to be unified to all iP. Name: Mahmoud A. Helaly Name: Barry Ennis Project Director SG Resident Eni Signature Signature Date: 12.04.2018 Date: 12.04.2018 Note: This recommendation for approval shall not relieve the contractor from his obligation to provide materials or equipment that are “fit for purpose” and shall be in accordance to contract requirements and approved designs. Inthe event, thot any suppl ‘Moterial ond/or equipment provided/installed by this Subcontractor/suppller is not “fit for Purpose” or does not comply In whole or part with contract specifications/Design, therefore, the employer shall be held harraless and contractor shall propose ‘and Provide/install an alternative Material/equipment upon securing approval at no additional cost and with no delays to works. FORMHA0-¢-6eN-08 REV (07/2012) Page of 1

You might also like