Butt weldingsteps
The following steps should be implemented to make perfect butt
welding:
1. Clean, clamp and align the pipe ends to be joined.
2. Face the pipe ends to establish clean, parallel surfaces,
perpendicular to the center line.
3. Align the pipe ends.
4. Melt the pipe interfaces.
5. Join the two pipe ends together by applying the proper fusion
force.
6. Hold under pressure until the joint is cool.
( WRAS) ~
bsi.-
~tl ~
New Industrial Area - P. 0. Box 16150, Doha, Qatar
Tel: +974 40298225 & +974 40294810, Fax: +974 44153061
info@advanced-pipe.com- sales@advanced-pipe.com-www.advanced-pipe.com
Advanced Plastic: Factory w.i.i
Fusion Process
1. The fusion (jointing) pressure is obtained by adding the drag
pressure to the hydraulic ram pressure given on the machine data
plate.
2. Next, the heater plate is placed in the unit, checking it is clean and
undamaged.
Modern machine developments now provide totally automatic jointing,
eliminating the risk of operator error and providing a full record of joint
history for Quality Assurance of site welding. Which type of jointing is
preferable fully depends on the particular pipeline type under
consideration.
:·- :~7:=/l "
• - ••• ~· ~'<:- /
....'...__,..
Generally, only the relatively small diameter pipes are electro fused.
Unless the amount of joints is small, in which case compression fittings - ...
; - ~.... -·
u
~~.I ~--11 l
0 0 .. 0
are favoured. Relatively large diameter pipes are generally butt-fused,
for cost-effectiveness reasons, although gas companies in particular
sometimes favour electrofusion joints.
·-
In general butt-fusion is carried out to the side of the trench and the
complete pipeline string then lowered in. All "in trench" jointing will Q' ·:~- --~~ ... ·-~: ~ :;
usually be carried out using electrofusion fittings. Flange connections ---.-,
I! ! ..
are generally used when valves or other ancillary components are
involved.
Doc. Ref: APF/PFC/QSP09B
[ WRAS] ~ ~O) ~
bsi.-
New Industrial Area - P. 0. Box 16150, Doha, Qatar
Tel: +974 40298225 & +974 40294810, Fax: +974 44153061
info@advanced-pipe.com - sales@advanced-pipe.com - www.advanced-pipe.com
3. The temperature of the heating plate during should be between
200°C to 220°C. Generally speaking, the upper temperature should
be aimed at for thinner pipe walls and the lower temperature for
thick pipe walls.
4. The following graph gives the details about the wall thickness and
the corresponding heating plate temperatures.
220"C
215"C
<;
2100C
205"C
200"C
195"C
"'· - ~
100"C
0 5 10 15 20 25 30 35 40 45 so
Wall thickness In mm
WRAS) ~ ~·) ~
bsi.-
New Industrial Area - P. 0. Box 16150, Doha, Qatar
Tel: +974 40298225 & +974 40294810, Fax: +974 44153061
info@advanced-pipe.com - sales@advanced-pipe.com-www.advanced-pipe.com