Punch List Form

This punch list document records observations needing correction for a construction project. It includes sections for the project title, contractor, inspection date, location, numbered observations with details, recommendations, remarks, and signatures for the drafter, verifier, approver, and contractor conforming. The purpose is to document items remaining to be corrected or completed by the contractor before the project is finished.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views1 page

Punch List Form

This punch list document records observations needing correction for a construction project. It includes sections for the project title, contractor, inspection date, location, numbered observations with details, recommendations, remarks, and signatures for the drafter, verifier, approver, and contractor conforming. The purpose is to document items remaining to be corrected or completed by the contractor before the project is finished.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

PUNCH LIST

PROJECT TITLE: _______________________________________________


CONTRACTOR: _______________________________________________
DATE OF INSPECTION: __________________________________________
LOCATION: ____________________________________________________

NO. OBSERVATION LOCATION RECOMMENDATION REMARKS


1
2
3
4
5
6

Prepared by: Verified/Checked by:

_________________________________________ ____________________________________________
(Draftsman/ Engineer) (Project Site Engineer / Electrical Engineer / Architect / Witness)

Approved by:

_________________________

Conformed by: __________________________________________


(Signature over Printed Name of Contractor / Date)

Page 1 of 1

PUNCH LIST 
PROJECT TITLE:  _______________________________________________ 
CONTRACTOR:    ___________________________