Professional Documents
Culture Documents
PROJECT :
OWNER :
LOCATION :
The work to be done in this project shall include the furnishing of all materials,
tools, equipment and labor for the satisfactory performance of all necessary works to
complete the construction of the project.
1
TINSMITHRY:
A. All roofing works shall meet the Philippine standards as per specified on the
plans. Overlaps shall be done safe from scooping water.
B. Flushing, valley roll shall be Ga. 26 pre-painted galvanized iron sheets as per
design on the plans.
C. Longspan Coloroof shall be used for roofing while gutters shall be Ga. 26 pre-
painted decorative.
A. The work to be executed in this project shall be in conformity with the latest
rules and regulations of the Philippine Sanitary code and the local ordinance of
the city or municipal.
B. All cold water supply lines shall be 20mm dia. sched. 40. All galvanized iron
pipes shall be at their respective sizes and of approved quality on type of
location.
ELECTRICAL WORKS:
A. The work to be executed in this project shall be in conformity with the latest
rules and regulations of the Philippine Electrical code and the local ordinance
of the city or municipal.
B. All materials to be used shall be of standard sizes and of approved quality on
type of location.