FORMS STRIPPING
VERSION 2020
Developmental Quality Program
Quality Control Inspection Guidelines - Forms Stripping
Objective :
To assist External CM’s and Contractors Quality Assurance-Quality Control
Engineers / Inspector in the course of Inspection before/during and after Form
Stripping.
i. General Contractors shall submit for approval Method of Statement in Forms Stripping for
Horizontal and Vertical Structure to the Consultant.
ii. General Contractors and Ready-mixed Concrete Supplier shall conduct Compression
Concrete Testing, witness by External CM. Then, External CM will validate the result and
give go signal to proceed if the result comply with the specification.
iii.General Contractors shall route Inspection Work Request in order to notify the Trade
Contractors.
iv.General Contractor shall secure the approval of Inspection Work Request prior to
commence the Forms Stripping.
Quality Control Inspection Guidelines for Forms Stripping
BEFORE FORMS STRIPPING
i. Obtain the Compression Concrete Test Result thru External CM with their
validation that comply with Specification from the Consultant.
ii. Secure the approved Inspection Work Request thru External CM.
iii.Follow and adhere the Approved Method of Statement by Consultant.
iv.Forms Stripping from concrete section should not make the structural element
to:
Collapse under self-load or under design load.
Deflect the structural member excessively in short or the long term.
Physically damage the structural member when formworks in removed.
v. The following points must be kept in mind during formworks removal whether
the structure will be prone to:
Cracks formation due to thermal contraction of concrete.
Note:
After formwork stripping. If there is a significant risk of any of the crack/s damages, it is
better to delay the removal time of formwork. If formwork have to remove for optimizing
the concrete construction activities, then these structures must be cover well to prevent
such damages.
Quality Control Inspection Guidelines for Forms Stripping
2. Formwork should not be remove until the concrete has developed sufficient strength to support all
loads placed upon it. The time required before form stripping depends on the structural function of the
member and the rate of strength gain of the concrete.
3. The form stripping procedure should be supervise by Contractor and External CM, as approved by
Consultant to ensure that quality of hardened concrete in structural member, i.e. it should be free from
or has minimum casting defects such as honeycombing, size and shape defects etc.
These defects in concrete influence the strength and stability of structure. Thus, immediate repair
works can be do or the members can be reject. (Submit proposal of rectification prior to proceed the
repair, which is according to the approved methodology).
4. Beam and joist bottoms should remain in place until final removal of all shoring under them has done.
Quality Control Inspection Guidelines for Forms Stripping
Cleaning of forms
Quality Control Inspection Guidelines for Forms Stripping
Proper stock pilling
Preparation for storage to prevent steel forms rusting during prolonged storage it is advisable to
coat them with a thin film of oil of a type, which is not injurious to concrete. If sump oil is used, it
will need to be removed before the forms are reused for columns, which are to be cement
rendered or “off-form” finish will result due to staining.
Developmental Quality Program
Quality Control Inspection Guidelines - Forms Stripping
END OF PRESENTATION
THANK YOU !