You are on page 1of 3

MAIN CONTRACTOR SUBMITTAL

Package No. : Package 2 Package Title: Jotun Waterbased Project – Piling Works Date Issued : 30 September 2022

Jotun WB_030-HSE-PBS-JI-MI-IX-22
Company Name : PT. Pakubumi Semesta Submittal No : Methode for Demobilization Hidraulic
Driling Rig

Date rcvd Date issued for Date


Drawing / Method / Testing / Status
Rev. Description fr MC by comment Received Comment
Schedule / Document No. A/B/C
MI Action Copy By Const.

1. Jotun WB_030-HSE-PBS- 000 1. Jotun WB_030-HSE-PBS-JI-MI-IX-22 Methode for


JI-MI-IX-22 Methode for Demobilization Hidraulic Driling Rig
Demobilization Hidraulic
Driling Rig

SUBMITTED BY Name : Iskandar Suhud Position : SM Signature Date 30 September 2022

Note : - All drawings, documents and samples must have a unique number and be prefixed with the S/C package number

APPROVAL STATUS : “A” = NO COMMENT “B” = COMMENTS AS NOTED “C” = REJECTED – RE-SUBMIT

PM/CM IN : Signature : Date : DESIGNER OUT : Signature : Date :

PM / CM OUT
DESIGNER IN : Signature : Date : Signature : Date :
:
JOTUN NEW WATERBASED
Revision Date:
METHOD STATEMENT FOR HIRAULIC DRILING -
RIG DISSAMBLING AND DEMOBILIZATION Page Rev.
1 of 2 -

1. Purpose
The purpose of this method statement for Diassembly Kelly Bar of the Rotary Drilling Rig
Machine before the Demobilisation define the specific tasks to be performed by Company
relating the assembly safety of the works.

2. Disassembly of Kelly Equipment


1. Removing the Kelly
2. Set mast to upright position.
3. Lower drilling tool to ground.
4. Remove drilling tool.
5. Unlock Kelly sections and move rotary drive to lowermost position.
6. Lift Kelly until square stub is approx. 20 cm above rotary drive.
7. Tilt mast forward by 2 - 3°.
8. Lower Kelly until Kelly rests with square stub on ground.
9. Go on lowering the Kelly and at the same time travel in reverse with the machine.
10. Remove Kelly from main rope.
11. Removing the Rotary Drive
12. Set mast to upright.
13. Move crowd sledge to lowermost point.
14. Adjust the uppercarriage in line with the undercarriage, with the mast located on the
same side as the crawler drive wheels.
15. Stop engine.
16. Disconnect electric lines.
17. Disconnect hydraulic lines.

Hiraulic Driling Rig after the Kelly


has been disassambled

The Kelly of driling rig has


been dissambled
JOTUN NEW WATERBASED
Revision Date:
METHOD STATEMENT FOR HIRAULIC DRILING -
RIG DISSAMBLING AND DEMOBILIZATION Page Rev.
2 of 2 -

3. Mounting Rotary Drilling Rig on Transport Truck

After the Hidraulic drilling rig was dissambled, then Operator driling Rig positioning the
heavy equipment to fit into the trailer.

After the kelly bar hidraulic rotary rig dissambled, help by Crawler crane as service crane.
Operator service crane put the kelly to dolly.