BURJ DUBAI DEVELOPMENT

THE DUBAI MALL


DBB/AGCCC JV
Works inspection Request ( Steel Work )
DETAILS OF SCHEDULED INSPECTION Section A
Package :_______________ WIR No:_____________

To : Consultant Time : _______________ Date : ____________

Spec./Drwg ref:_________________ Inspection scheduled for -Time : __________ Date : ___________

Location : Building /Area :___________________________ Level :__________ Zone : ______________


Location
Subject :- A,B.C…...Grids 1.2,3,….. Grids

Bolting Framing Erection

Grouting Welding

Fire Proofing Painting


Description
Factory Works Others

Fit-up Post Weld

Surface Prepration Others

Site Engg. Sign.

CONFIRMATION OF CONTRACTOR'S Q.C.INSPECTION Section B


Confirmation of co-ordination and compliance with Specifications
Approved Drawings, Method statement and Quality Control Plan

Tick box YES NO Note : If NO, any departure from Specifications, Approved Drawings,
Method Statement and Quality Control Plan to be recorded below.
Non Conformity and/ or reference of
attached non Conformity Report (NCR):________________________________ Date : ______________

Contractor : _____________________________ Date : ____________


CONSULTANT'S COMMENTS Section D
Structural Steel Work Civil MEP Arch

Approved Approved as Noted Rejected


Consultant : _____________________________ Date : ____________
THE CONSULTANT'S COMMENTS SHALL NOT RELIEVE THE CONTRACTOR
OF ANY OF HIS RESPONSIBILITIES UNDER THE CONTRACT

Received for Contractor : ______________________________________ Date : _____________

Receipted Copy to : PM/ Others


BURJ DUBAI DEVELOPMENT
THE DUBAI MALL
DBB/AGCCC JV
Works inspection Request ( Steel Work )
DETAILS OF SCHEDULED INSPECTION Section A
Package :NS06_____________ WIR No:__0001 SS

To : Consultant Time : __10.00AM_____________ Date : 02.04.08

Spec./Drwg ref:_________________ Inspection scheduled for -Time : -11.00am Date : __04.04.08_

Location : Building /Area :__Water Front Bldg-26 Level :_Roof Zone : -C


Location
Subject :- A,B.C…...Grids 1.2,3,….. Grids

Bolting Framing Erection

Grouting Welding AB- AD 44/48

Fire Proofing Painting


Description
Factory Works Others

Fit-up Post Weld

Surface Prepration Others

Site Engg. Sign.

CONFIRMATION OF CONTRACTOR'S Q.C.INSPECTION Section B


Confirmation of co-ordination and compliance with Specifications
Approved Drawings, Method statement and Quality Control Plan

Tick box YES NO Note : If NO, any departure from Specifications, Approved Drawings,
Method Statement and Quality Control Plan to be recorded below.
Non Conformity and/ or reference of
attached non Conformity Report (NCR):________________________________ Date : ______________

Contractor : _____________________________ Date : ____________


CONSULTANT'S COMMENTS Section D
Structural Steel Work Civil MEP Arch

Approved Approved as Noted Rejected


Consultant : _____________________________ Date : ____________
THE CONSULTANT'S COMMENTS SHALL NOT RELIEVE THE CONTRACTOR
OF ANY OF HIS RESPONSIBILITIES UNDER THE CONTRACT

Received for Contractor : ______________________________________ Date : _____________

Receipted Copy to : PM/ Others