Professional Documents
Culture Documents
The following is the tentative schedule of our concrete casting for elements already inspected and accepted for casting this day:
Tentative Casting Time
No. Location & Level Description Grade Qty M3
Start Finish
TOTAL
Your action for supervision of the above would be very much appreciated.
Comments: