CONTRACTOR
CONTRACT NUMBER
CONTRACTOR FIELD REPRESENTATIVE

CORRECTIVE ACTION REQUEST


CHECKLIST REFFERENCE:
ACTIVITY:

During our site inspection on dated 04.07.2021, we have observed that without proper removal of BC soil and s
on OGL layer, embankment layers preparation work in progress. Concessionaire agreed to remove the soil up to
Today we have noticed without proper removal of BC soil and slush, embankment layers formation works in pro
Requested to concessionaire, please remove the soil up to OGL level and conduct the FDD layer by layer as per
methodology.

Y. Ravi Kumar
PMC Engineer
Date:
Received & Noted By

__________________________
Contractor's Representative
Date: