Professional Documents
Culture Documents
Civil
Plumbing
HVAC
Electrical
The above mentioned works have been checked and found complying with the approved Site Engineer Name: ___________
shop drawing and contract Documents and coordinated with all subcontractors. Signature: ___________
Contractor's Representative: