Item to be Inspected:
Setting out of trench for Distribution pipe at Zone-5 Area as per attached sketch and survey data.
Attachment:
QA/QC Chick List Shop Drawings Method Statement Others
READY FOR INSPECTION
DATE: 17/01/2021 TIME: 09 00 am
Contractor:
We confirm that work to be inspected has been coordinated with all related disciplines, sub-contractors and direct contractors
and complies with the specifications, approved drawings, method statement and quality control plan.
CM: Fares Al Aloush Signature: Date: 16th Jan 2021
Sr. QA/QC Engineer Signature: Date:
Sr, QAQC Manager Hani Abdelfattah Elrefaey
Signature: Date: 16th Jan 2021
Designer / Special Consultant:
The above work is ready for inspection and comply with the design intent.
Name:
Signature:
Date:
AA Project Manager:
Name:
Signature:
Date: