INTERIOR
EXTERIOR
Surface Preparation
• Neutralizer
• Primer & Putty
Application
• First Coating
• 2nd Coating
• 3rd Coating
• 4th Coating
• Final Coating
MECHANICAL
ELECTRICAL
PLUMBING
FIRE PROTECTION
ARCHITECTURAL
REMARKS :
CHECKED BY : INSPECTED BY :
PROJECT SUPERVISOR QC
VP-CONSTRUCTION OPERATIONS
NOTE : This form must be submitted to The QC TEAM, duly accomplished and signed by the corresponding
Contractor's Personnel-in-charge at least 24 hours before actual work execution.