You are on page 1of 2

#NAME?

ABC Construction Corporation


Project : #NAME?

Date Prepared CIR No.


CHB INSTALLATION REQUEST

REQUESTED BY : Name/ Designation :


Contractor : Signature :

Note : All signatories should print their name and sign.

AREA (Pls. enclose key plan) GRIDLINE/LOCATION DATE OF INSTALLATION STRUCTURE

LEVEL

PREPARED BY CHECKED BY INSPECTED BY


CHECK ITEMS
CONTRACTOR PROJECT SUPERVISOR QC

LINE and GRADE

REINFORCEMENTS

MECHANICAL

ELECTRICAL

PLUMBING

FIRE PROTECTION

ARCHITECTURAL

OTHERS

REMARKS :

Rev. 0 August 27, 2019


CHECKED BY : INSPECTED BY :

PROJECT SUPERVISOR QC

APPROVED BY : NOTED BY:

VP-CONSTRUCTION OPERATIONS

NOTE : This form must be submitted to The QC TEAM, duly accomplished and signed by the corresponding
Contractor's Personnel-in-charge at least 24 hours before actual installation.

Rev. 0 August 27, 2019