GRANTOR: PORT AUTONOME D'ABIDJAN

EMPLOYER: COTE D’ IVOIRE TERMINAL

ENGINEER: SETEC INTERNATIONAL

LAND WORK CONTRACTOR:


CHINA HARBOUR ENGINEERING COMPANY LIMITED
Transmittal
Project Name: Cote D’Ivoire Terminal

Date 26 March 2021

To SETEC INTERNATIONAL

Attention Mme Laure HERBERT

Cc: Mr. Abdoul DIOP

Subject: Method Statement for construction work at night shift

SUBMITTALS LIST

NO DOCUMENT NO. DOCUMENT TITLE TYPE


Method Statement for construction work at
1 CIT-CON-01-CMT-MTS-000..-V0.. For Approval
night shift
( Type: For Information / For Review / For Approval/ For Construction )

Drafted By: …… Issued By: Liu Haimin (Project Manager)

Reviewed by Engineer :

No comments.
Accepted with Comments.
Not in compliance with Employer’s Requirements/ Specifications.
Review not required.

Remarks :__________________________________________________________________________

__________________________________________________________________________

__________________________________________________________________________

__________________________________________________________________________

__________________________________________________________________________

1 / 13
Engineer signature: ________________________ Date : _____________________

Reviewed by Employer:

No comments.
Accepted with Comments.
Not in compliance with Employer’s Requirements/ Specifications.
Review not required.

Remarks : __________________________________________________________________________

__________________________________________________________________________

__________________________________________________________________________

__________________________________________________________________________

__________________________________________________________________________

Employer signature: _______________________ Date : _____________________

Reviewed by Grantor :
No comments.
Accepted with Comments.
Not in compliance with Employer’s Requirements/ Specifications.
Review not required.

Remarks : __________________________________________________________________________

__________________________________________________________________________

__________________________________________________________________________

__________________________________________________________________________

__________________________________________________________________________

Grantor signature: ________________________ Date : ______________________

2 / 13
GRANTOR : PORT AUTONOME D'ABIDJAN

EMPLOYER: COTE D’ IVOIRE TERMINAL

ENGINEER: SETEC INTERNATIONAL

LAND WORK CONTRACTOR:


CHINA HARBOUR ENGINEERING COMPANY LIMITED

Project : Cote d’Ivoire Terminal

Method Statement for Construction Work at Night Shift

Document No: CIT-CON-01-CMT-MTS-000..-V0..

V00 26/03/2021 For Approval ………. Yue Liguang Liu Haimin


Rev Date Issued For Prepared By Checked By Approved By

3 / 13
4 / 13
Cote d’Ivoire Terminal

REV. REV. DATE REVISED SECTION DESCRIPTIONS OF REVISION

5 / 13
Cote d’Ivoire Terminal

Table of contents
1 GENERAL.............................................................................................................................................6
 Prepare the purpose......................................................6
 Definition.............................................................6
2 WORK METHODOLOGY..................................................................................................................6
2.1 General..............................................................6
2.2 Night Construction works Safety Measures....................................................................7

/
Cote d’Ivoire Terminal

1 GENERAL

 Prepare the purpose

The purpose of this Method Statement is to establish and to outline the rules to be applied
as safety methods of construction works to be carried out during night shift. It consists of
the installation of formworks, installation and preparation of steel reinf
culverts concrete pouring, precast manhole concrete pouring and piling works.

 Definition

Project: CIT Abidjan second container terminal project

Works: Construction work at night shift

Employer : CÔTE D'IVOIRE TERMINAL SA

Engineer : SETEC

Contractor: CHINA HARBOUR ENGINEERING COMPANY LTD.

2 WORK METHODOLOGY

2.1 General

The concrete works shall be carried out fully in compliance with the Project Specifications
All dimensions, levels, construction joints, movement joints, reinforcemen
reinforcement covers, reinforcement splicing, etc. shal
Drawings of the particular structure.

All safety of the concrete works at night shifts shall conform to the relevant c
Project HSE Plan.

2.2 Night Construction works Safety Measures.

It i is mportant
t c i t hatt e aret os aaken a on a nsure b o hat
w ther
du ri n g ni gh t a n d al s o t o e ns ur e t ha t o t he r t ra de s do n ot ha ve a de t ri m e nt a l e f fe c t o
works. Liaison with site management is to be continuous to avoid any such problems.

The safety measures to take into account for night shifts includes the following contents:

 All night construction personnel must wear protective equipment in accordance with
the requirements of the project department.

/
Cote d’Ivoire Terminal

 Use of proper lighting for best visibility.


Night construction must be equipped with
lamps and lanterns to meet the construction needs.

 Before the start of night construction, day shift personnel shoul


handover with night construction personnel.

 No night construction is allowed in heavy rain, fog, and strong wind.

 Before night construction, the debris must be cleaned. Avoid safety accidents.

 Safety measures for Piling Works

1. Guardrail shall be set around the pile hole, and obvious signs shall be made to prevent site
personnel from falling into the hole, and miscellaneous personnel shall not allow to ent
the construction area;

2. During drilling, non relevant personnel shall not be too close to the drilling rig to prevent
mechanical injury.

3. There should be enough lighting in the construction area at night. When the construction is
suspended, the pile hole must be sealed with a cover plate. If necessary, obvious warning
signs shall be set up.

4. Warning tapes and safety signs must be installed around the drilling fluid pit and pile hole.
After the hole is formed, the hole which does not carry out the next pr
equipped with safety protection facilities and guarded.

5. During the installation of reinforcement cage, check whether peo


rotating working range of the boom to prevent people f

/
Cote d’Ivoire Terminal

reinforcement cage is lowered. The lifting point of the reinforcement cage must be welded
firmly, and a special person shall be assigned to direct the lifting
horizontal dragging is not allowed, so as to ensure that the reinforcement cage enters
borehole vertically;

6. Before t premie
i ipe
a c nstallation
p p c ndm boncrete
s a t m ouring,
o
pile hole;

7. The construction site must be regular and smooth, and the sundries must be remo
prevent the staff from tripping and causing accidents when removing the tremie pipe;

8. In t h e pr oc e s s of c on c re t e p ou ri ng , w h en t h e c on cr e te m ix e r tr uc k i s re ve r s i ng , s om
commands and the commander stands at the position that the driver can see. In the process
of reversing, no one is allowed to stand behind the truck. Operators should pay attention to
the position of the hook in the process of lifting and removing the tremie pipe
damaging the head of the accessories.

9. The distribution box and other power supply equipment shall not be placed in
drilling fluid, the wire joint shall be firm and insulated, and the transmission line must be
equipped with leakage switch.

Light towers

 Safety construction measures of precast manhole concrete pouring

/
Cote d’Ivoire Terminal

 Labor protection articles

All w orkers
i t d w n a hee iayn s ork m w
nd m vena s n h ight a hifts
night, wear work clothes or reflective vests as required, and wear labor protection sho
Under no circumstances is allowed to take off the above labor protection equipment,
whole operation as required to wear.

 Work on high ground

In the height of the concrete pouring work, must be cons


requirements of mobile scaffold, scaffold top and construction top to maintain t
height, a i ndp nstallr W
rotective
w i a ailings.
o t s hen r orking
a platform in the middle of the well consists of square and wooden boar
workers to stand on and vibrate the concrete.

/
Cote d’Ivoire Terminal

Set up work platform Movable scaffolding

 Night lighting

When working at night shifts, it is necessary to ensure that the working area has sufficient
lighting conditions. During the construction, light wagons and LED li
ensure lighting.

Light vehicle

 Other measures

During t c he onstruction
a n w m o t ti ight, o t ep ust
i c bey
o t he
construction t W ueam. m hene sing
w n sechanicalt c aquipment,
it is strictly prohibited for operators to construct without permission. Person
carefully climb movable scaffolds; When the lighting conditions are not
implementation of safety measures are not in place, can not be carried out at night.

/
Cote d’Ivoire Terminal

/