You are on page 1of 4

Risk Assessment

Jubail 3B IWP Project


Revision: 02 Rev. date: 2022/03/16 Page:1 of 4

Activity/Task Wall Reinforcement & Formwork Risk Assessment No: 1 (Rev-04) Date: 26/05/2022

Activity Step Hazard/Risk (L) (S) (RR) Control Measures Check


 Workers must be trained in manual handling techniques. Task Supervisor HSE
Reinforcement & Formwork Manual handling & 2 3 Medium  Adequate personnel must be assigned for lifting the rebar manually. officer & Workers
Ergonomic hazards 6  Avoid manual handling during shuttering.
 Mechanical aids or additional help to be used for the task.
 All damaged tools must be removed from site immediately and tagged (damaged).
 Take 5 TBT shall be conducted task supervisor (WPR) along with HSE officer,
explain the daily task and task related hazards.
Trip and Fall  Proper Housekeeping and proper material stacking throughout the workplace. Site Engineer, Task
2 3 Medium  All access/egress routes should be firm and level and free from any obstruction. Supervisor HSE
6  Trip hazards need to be identified and proper signages must be posted. officer & Workers
 Access & Egress must be in safe condition with proper barrier and signages
(Pedestrian access, walk way etc)
 Do not store any materials on the walkways.
 de – nailed all wooden after de shuttering
 Dedicated de-nailing area shall be provided to prevent workers from protrude nails.
Protruding rebars and Sharp 3 3 Medium  Full time supervision shall be available while doing shuttering and De-shuttering. Site Engineer, Task
Edges 9  The tip of the binding wire to be bend away to avoid injury to the operatives Supervisor HSE
 Area should be properly barricaded with signages. officer & Workers
 Ends of rebar/ bars are covered by rebar caps.
 All spill nails should be removed from the work place.
 The tip of the binding wire to be bend away to avoid injury to the operatives.
 Adequate hand protection must be worn.
 Cables, Equipment and Power tools must be in good condition and must be Site Engineer, Task
Electrocution 4 4 16 inspected having valid EPC sticker and colour coded by a competent electrician. Supervisor HSE
High  ELCB and earthing in DB shall be provided. officer & Workers
 Power tools are to be used for the purpose they were designed. Don’t
improvise and never use faulty tools.
 All tools must have an industrial type plug fitted and be the correct colour for voltage
 Do not use power tools with wet hands.
 All electrical works shall be done by competent electrician.
 No tampering or unauthorized modification on electrical tools and systems.
 Repair will be done by competent electrician only.
Entanglement 4 3 High  Avoid loose clothing while performing the task. Never place body parts in line Site Engineer, Task
12 of fire while handling rotating power tools. Supervisor HSE
 Power tools shall have Deadman switch without locking provision. officer & Workers

Risk assessment reference number: J3B-VH-00-R-50210


Risk Assessment
Jubail 3B IWP Project
Revision: 02 Rev. date: 2022/03/16 Page:2 of 4

Fire Hazard  Hot work permit shall be obtained and must have valid date and signatures Site Engineer, Task
4 4 16  Trained fire watcher shall be assigned with the task. Supervisor HSE
High  Area must be free from combustible materials. officer & Workers
 Adequate fire extinguishers & fire blanket shall be used where required.
 Adequate PPE must be used as per the hot work requirement.
 Ensure the formwork has been installed by competent workers under Site Engineer, Task
Collapse of Formwork 4 4 16 competent supervision asper the approved method statement, third party Supervisor HSE
High approved design and engineering calculation for the shuttering material and officer
scaffold tower.
Collapse of Rebar structure.  All Starter bars or dowels for column, wall, slab, etc. will be properly Site Engineer, Task
4 4 16 coordinated and fixed as per approved drawings and bar bending schedule. Supervisor HSE
High  Supports shall be provided where required to keep the reinforcement in officer & Workers
position.
 If any Diagonal bars are mentioned in design, it should be tied uniformly with
required centre to centre spacing.
 In reinforcement concrete wall construction, Vertical bars are to be fixed to the
starter bars from the foundation including horizontal bars and additional
bracings to support it.
 Rebars to be tied continuously in between vertical and horizontal bars while
working on construction of walls.
 Any splices and joints in rebar to be tied properly as required.
 All walls and chambers rebar work to be commenced with periodical close
supervision of engineers to ensure the approved bar bending schedule is
followed.
 All sleeves, inserts, anchor bolts, angle steels, and other embedded items
required for adjoining work or for its support shall be accurately placed and
firmly anchored to prevent displacement prior to concreting
 The maximum height up to which rebar can be stalked should be 1m.
 Steel reinforcement shall be protected at all times from injury.
 When placed in the work, it shall be free from dirt, scale, paint, oil, loose rust,
grease or other foreign substances.
Alternatively, 2”X1” timber planks can be tied to both sides of the rebar to
prevent injuries.
Working at height  All employees must be trained in W@H by EPC and must have sticker displayed Site Engineer, Task
Personnel & Material fall 4 4 16 on the helmet. Supervisor HSE
from height High  Supervisor must ensure that the crew is trained in W@H prior to assign the officer & Workers
task
 Scaffold platform must be inspected by a certified and competent scaffolding
inspector.
 Scaffold must be tagged, having all components as per the project requirement
Risk assessment reference number: J3B-VH-00-R-50210
Risk Assessment
Jubail 3B IWP Project
Revision: 02 Rev. date: 2022/03/16 Page:3 of 4

(hand rails, Toe board etc)


 All tools and loose materials must secure properly or toolbox must be used.
 Lifeline shall be is be installed as per the standard by the scaffolder wherever
required.
 Full body Safety harness must be worn by all employees using scaffold
platform. Ensure the safety harness is anchored in proper anchoring point.
 Chin strap shall be used by all employees along with all mandatory PPE’s.
 Suspend the activity during adverse weather condition like fog, high wind, Task Supervisor HSE
Emergency Situations High wind/ heavy poor visibility, heavy rain/storm etc. officer, First Aider,
rain/storms Chemical  Site emergency response procedure shall be followed. Workers & ERT
Fire 2 3 6  Trained First aider shall be available at site. Team.
Spills. Medium  Periodic inspection and maintenance of plant and equipment.
Medical emergency.  SDS of all chemicals shall be available and communicated with employees.
 Awareness of chemical safety should be given to Operator.
 Emergency contact number shall be posted in site areas. (Project Hotline
Number- 054-028-3292)
 Training of Firefighting equipment and emergency procedure provided.
 Adequate and suitable Fire extinguishers must be provided.
 First aid room and first aider shall be on site.
 Site emergency number must be with all workforce.
 All personnel arriving on site will attend the site induction, highlighting site
rules and emergency Procedures before working on site.

IMPORTANT NOTE: By signing this document, it is acknowledged by each


person involved in this risk assessment that all reasonable attempts have been
made as a first priority to identify any potential to eliminate all the significant
hazards listed, e.g., by preventing working at height or entering into a confined
space.
Approved By:
Prepared By: Reiviewed By: Approved By:
Name Position Signature Name Position Signature Name Position Signature
Risk assessment reference number: J3B-VH-00-R-50210
Risk Assessment
Jubail 3B IWP Project
Revision: 02 Rev. date: 2022/03/16 Page:4 of 4

Mohsin Riaz Khan Alrajhi HSE Manager Himyanullah Alrajhi Construction Manager Hamdi Hamada Alrajhi Project Manager

Risk assessment reference number: J3B-VH-00-R-50210