Activity/Task Wall Reinforcement & Formwork Risk Assessment No: 1 (Rev-04) Date: 26/05/2022
Fire Hazard Hot work permit shall be obtained and must have valid date and signatures Site Engineer, Task
4 4 16 Trained fire watcher shall be assigned with the task. Supervisor HSE
High Area must be free from combustible materials. officer & Workers
Adequate fire extinguishers & fire blanket shall be used where required.
Adequate PPE must be used as per the hot work requirement.
Ensure the formwork has been installed by competent workers under Site Engineer, Task
Collapse of Formwork 4 4 16 competent supervision asper the approved method statement, third party Supervisor HSE
High approved design and engineering calculation for the shuttering material and officer
scaffold tower.
Collapse of Rebar structure. All Starter bars or dowels for column, wall, slab, etc. will be properly Site Engineer, Task
4 4 16 coordinated and fixed as per approved drawings and bar bending schedule. Supervisor HSE
High Supports shall be provided where required to keep the reinforcement in officer & Workers
position.
If any Diagonal bars are mentioned in design, it should be tied uniformly with
required centre to centre spacing.
In reinforcement concrete wall construction, Vertical bars are to be fixed to the
starter bars from the foundation including horizontal bars and additional
bracings to support it.
Rebars to be tied continuously in between vertical and horizontal bars while
working on construction of walls.
Any splices and joints in rebar to be tied properly as required.
All walls and chambers rebar work to be commenced with periodical close
supervision of engineers to ensure the approved bar bending schedule is
followed.
All sleeves, inserts, anchor bolts, angle steels, and other embedded items
required for adjoining work or for its support shall be accurately placed and
firmly anchored to prevent displacement prior to concreting
The maximum height up to which rebar can be stalked should be 1m.
Steel reinforcement shall be protected at all times from injury.
When placed in the work, it shall be free from dirt, scale, paint, oil, loose rust,
grease or other foreign substances.
Alternatively, 2”X1” timber planks can be tied to both sides of the rebar to
prevent injuries.
Working at height All employees must be trained in W@H by EPC and must have sticker displayed Site Engineer, Task
Personnel & Material fall 4 4 16 on the helmet. Supervisor HSE
from height High Supervisor must ensure that the crew is trained in W@H prior to assign the officer & Workers
task
Scaffold platform must be inspected by a certified and competent scaffolding
inspector.
Scaffold must be tagged, having all components as per the project requirement
Risk assessment reference number: J3B-VH-00-R-50210
Risk Assessment
Jubail 3B IWP Project
Revision: 02 Rev. date: 2022/03/16 Page:3 of 4
Mohsin Riaz Khan Alrajhi HSE Manager Himyanullah Alrajhi Construction Manager Hamdi Hamada Alrajhi Project Manager