Risk Assessment

Jubail 3B IWP Project


Revision: 02 Rev. date: 2022/03/16 Page:1 of 2

Activity/Task Electric and Cad Welding Risk Assessment No: 7(Rev-01) Date: 25/05/2022
Activity Step Hazard/Risk (L) (S) (RR) Control Measures Check
Welding Works Accident due to  Welding Machine should be earthed with proper grounding rod. Task Supervisor, CPO,
incompetent person or 2 2 Low  One bucket must have with welder for stacking used welding rod. HSE officer &
defective tool 4  Fire watchman will remain on duty for at least ½ hour after welding operation Workers
has stopped.
 Copper Rod for grounding must be secured to their connections.
 Never dip an overheating electrode holder in water to cool it down.
 Fire Extinguisher should be on hot work place& Falling slag must be protected
by fire blanket.
 Work Area must be barricade & signage in place.
 Toolbox talk for all crew involved for that task.
 Maintain Good housekeeping.
 Select the proper welding or cutting TIP for the job.
 Check valves must be fitted between the handpiece (torch) and the hoses.
 Never drop or hit pressure regulators.
 Wear appropriate PPE(Welding Gloves, Apron, face Shield )
Additional Precaution Cad Fire Hazard  Hot work permit shall be obtained and must have valid date and signatures Site Engineer, Task
Welding 4 4 16  Trained fire watcher shall be assigned with the task. Supervisor HSE
High  Area must be free from combustible materials. officer & Workers
 Adequate fire extinguishers & fire blanket shall be used where required.
 Adequate PPE must be used as per the hot work requirement.
 Cables, Equipment and Power tools must be in good condition and must be Site Engineer, Task
Electrocution 4 4 16 inspected having valid EPC sticker and colour coded by a competent electrician. Supervisor HSE
High  ELCB and earthling in DB shall be provided. officer & Workers
 Power tools are to be used for the purpose they were designed. Don’t
improvise and never use faulty tools.
 All tools must have an industrial type plug fitted and be the correct colour for
voltage
 Do not use power tools with wet hands.
 All electrical works shall be done by competent electrician.
 No tampering or unauthorized modification on electrical tools and systems.
 Repair will be done by competent electrician only.
Skin burns or Eye irritation. 3 3 Medium  Emergency Eye Wash Station shall be arranged near casting location. Task Supervisor ,
9  Disposal coverall must be worn by all personnel exposed to concrete. CPO, HSE officer &
 Eye protection is compulsory Workers
 Full sleeve rubber gloves along with steel toe gumboot must be worn by all
personnel exposed to concrete.
 Proper Housekeeping and proper material stacking throughout the workplace. Site Engineer, Task

Risk assessment reference number: J3B-VH-00-R-50210


Risk Assessment
Jubail 3B IWP Project
Revision: 02 Rev. date: 2022/03/16 Page:2 of 2

Slip/Trip/Fall. 3 3 Medium  Vibrator hose must be properly coded and stored when not in use. Supervisor HSE
9  All pneumatic hoses must have whiplash arrestor at both end. officer & Workers
 All access/egress routes should be firm and level and free from any obstruction.
 Trip hazards need to be identified and proper signages must be posted.
 Access & Egress must be in safe condition with proper barrier and signages
(Pedestrian access, walk way etc)
 Do not store any materials on the walkways.
Emergency Situations High wind/ heavy  Suspend the activity during adverse weather condition like fog, high wind, Task Supervisor HSE
rain/storms Chemical poor visibility, heavy rain/storm etc. officer, First Aider,
Fire  Site emergency response procedure shall be followed. Workers & ERT
Spills. 2 3 6  Trained First aider shall be available at site. Team.
Medical emergency. Medium  Periodic inspection and maintenance of plant and equipment.
 SDS of all chemicals shall be available and communicated with employees.
 Awareness of chemical safety should be given to Operator.
 Emergency contact number shall be posted in site areas. (Project Hotline
Number- 054-028-3292)
 Training of fire fighting equipment and emergency procedure provided.
 Adequate and suitable Fire extinguishers must be provided.
 First aid room and first aider shall be on site.
 Site emergency number must be with all workforce.
 All personnel arriving on site will attend the site induction, highlighting site
rules and emergency Procedures before working on site.

IMPORTANT NOTE: By signing this document, it is acknowledged by each


person involved in this risk assessment that all reasonable attempts have been made
as a first priority to identify any potential to elminate all the significant hazards
listed, e.g., by preventing working at height or entering into a confined space.

Approved By:
Prepared By: Reiviewed By: Approved By:
Name Position Signature Name Position Signature Name Position Signature
Mohsin Riaz Khan Alrajhi HSE Manager Himyanullah Alrajhi Construction Manager Hamdi Hamada Alrajhi Project Manager