STRUCTURAL STORAGE SHED ABOVE IRON ORE & PELLET STOCKYARD

PROJECT NAME :
BAHRAIN STEEL PROJECT
TO : THE ENGINEER : Kind attention : Mr. Rami Sawaya
FROM : THE CONTRACTOR : AL NAMAL CONTRACTING & TRADING Co. W.L.L.

INSPECTION REQUEST IR
IR No. IR-CW-0106 Revision No R0 Date 03/12/2023 Discipline civil
Request for inspection of waterproofing works for Around pile cap
Description
location – grid 100”-101/P, N , M
Inspection Date 04/12/2023 Time 11:00 A.M
We have the pleasure to request inspection for the work stated hereunder and confirm that all necessary works have been
satisfactorily completed under the terms of the contract and provided as required in the Drawings and specifications.
EPC contractor : EPC contractor:
Name : Devamalya De Name : Anwar Sadath
Designation: PM Designation: Head QA/QC
Signature: Signature:
A CLASS CRPEP CONSULTANT- ISMAIL KHONJI ASSOCIATES (IKA)
Comments Approval status
___________________________________________________ A Approved ,no comments
___________________________________________________ B Approved with comments
___________________________________________________ C Revise and resubmit
___________________________________________________ D Rejected

Name:______________________ Position________________ Signature:___________________ Date :_____________


THIRD PARTY TESTING AND INSPECTION ORGANISATION- BUREAU VERITAS (BV)
Comments Approval status

___________________________________________________ A Approved ,no comments


___________________________________________________ B Approved with comments
___________________________________________________ C Revise and resubmit
___ D Rejected

Name:______________________ Position______________ Signature:___________________ Date :______________


CLIENT BAHRAIN STEEL BSC (C) (EC) ANSARI ENGINEERING SERVICES W.L.L
Comments: Comments:

NAME NAME
POSITION POSITION
DATE DATE
SIGNATURE SIGNATURE
DG JONES AND PARTNERS MIDDLE EAST W.L.L
Comments:
A Approved ,No comments
_______________________________________________________ B Approved with Comments
_______________________________________________________ C Revise and resubmit
_______________________________________________________ D Rejected
_______________________________________________________

NAME POSITION DATE SIGNATURE


Mr. Rami Sawaya Head Of Department-Project Management

Note : This review/approval does not relieve the contractor from his obligation to verify and execute the work according to the