xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]

PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK
ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK


DESCRIPTION
JO / EWO

OFFICE BUILDING
STRUCTURAL CALCULATION
07/14/2021
DATE

OF FOUNDATION
REV
NO.

DISCIPLINE
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021

PROJECT
ENGINEER
____________
DATE: ___________ DHAHRAN POD BUILDING 3098 NEW EXPANSION & NEW WAREHOUSE
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021

CONSTRUCTION
AGENCY
FIRAS MOUSA
DATE: ___________

OPERATIONS

_____________
DATE: ___________
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

BY DRAWING COMPLETION CERTIFICATE (DCC)


APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
1 OF 53 A
APPROVAL/C
NO.___
BY DRAWING
R

OF THIS D
THIS I
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 1 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
Table of Contents
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK
ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

1 DESIGN BASIS

1.1 General
DESCRIPTION

1.2 Structure Description

1.3 Structural Drawings

1.4 Design Criteria

1.4.1 Applied Codes & Specification


JO / EWO

1.4.2 Material Specification


07/14/2021

1.4.3 Soil Bearing Capacity


DATE

1.4.4 Safety Factors for Foundation Design


REV
NO.

1.4.5 Design Loads & Assumptions


A

DISCIPLINE 1.4.6 Load Combinations


ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 2 FOUNDATION ANALYSIS & DESIGN

PROJECT 2.1 Steel Reaction Summary


ENGINEER
____________
DATE: ___________ 2.2 Ultimate Reactions

CERTIFIED
2.3 Pedestal Design
ABDULBASIT KHAN
DATE: 07/14/2021
2.4 Foundation Design

CONSTRUCTION 2.5 Grade Beam Design


AGENCY
FIRAS MOUSA
DATE: ___________

OPERATIONS

_____________
DATE: ___________
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

BY DRAWING COMPLETION CERTIFICATE (DCC)


APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
2 OF 53 A
APPROVAL/C
NO.___
BY DRAWING
R

OF THIS D
THIS I
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 2 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

1 DESIGN BASIS
ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

1.1 General

The objective of this document is to establish the engineering requirements of structural adequacy and serviceability of
the foundation. This Design Calculation Report covers the Analysis & Design of its foundation as described in subsequent
DESCRIPTION

section of this document.

1.2 Structure Description

This calculation shows analysis & design of pedestals and foundations of an office building. In analysis & design, the
JO / EWO

requirements of the Saudi Building Code and Saudi Aramco Standards are used. The reactions from the Steel Design are
utilized including the gravity and lateral loads imposed imposed on the structure
07/14/2021
DATE

1.3 Structural Drawings


REV
NO.

Reference Number : DB - 22ST01


A

DISCIPLINE
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 1.4 Design Criteria

PROJECT 1.4.1 Applied Codes & Specification


ENGINEER
____________
DATE: ___________ SBC 301 2018 Saudi Loading Code

CERTIFIED
SBC 303 2018 Saudi Soils and Foundation Code
ABDULBASIT KHAN
DATE: 07/14/2021
SBC 304 2018 Saudi Concrete Structures Code

CONSTRUCTION SAES – A – 112 Meteorological and Seismic Design Data


AGENCY
FIRAS MOUSA
DATE: ___________ SAES – A – 204 Preparation of Structural Calculations

OPERATIONS SAES – Q– 001 Criteria for Design and Construction of Concrete Structure
_____________
DATE: ___________ SAES – Q– 005 Concrete Foundation

SABP – Q– 001 Anchor Bolt Design and Installation


______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

SABP – Q– 002 Spread Footings Design


BY DRAWING COMPLETION CERTIFICATE (DCC)
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
BY DRAWING COMPLET
NO.___________
REVISION C

OF THIS DRAWING I
APPROVAL/CERTIFICA
THIS INDICATES
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 3 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

1.4.2 Material Specification


ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

Concrete (Compressive Strength of Cylinder at 28 Days)

Non-structural Concrete fc' = 14 MPa


DESCRIPTION

Structural Concrete fc' = 28 MPa

Main Reinforcement Bar fy = 420 MPa

1.4.3 Soil Bearing Capacity


JO / EWO

For details of Soil Bearing Capacity, please refer to Geotechnical File No. 2021/01
07/14/2021
DATE

1.4.4 Safety Factors for Foundation Design


REV
NO.

Overturning (as per SAES – Q – 005)


A

DISCIPLINE S.F. = 1.5 to be used for all Service Loads


ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 Sliding (as per SAES – Q – 005)

PROJECT S.F. = 1.5 to be used for all Service Loads


ENGINEER
____________
DATE: ___________

CERTIFIED
1.4.5 Design Loads & Assumptions
ABDULBASIT KHAN
DATE: 07/14/2021
A. Dead Load

CONSTRUCTION Dead loads consist of the weight of all materials of construction incorporated into the building including but not limited to
AGENCY
FIRAS MOUSA walls, floors, roofs, ceilings, stairways, built-in partitions, finishes, cladding and other similarly architectural and structural
DATE: ___________ items, and fixed service equipment which was considered in the design of the Steel Structure.

OPERATIONS B. Live Load


_____________
DATE: ___________
The live loads used in the design of buildings and other structures shall be the maximum loads expected by the intended use
or occupancy but shall in no case be less than the minimum required by the code.
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

AWING COMPLETION CERTIFICATE (DCC)


OVAL/CERTIFICATION REQUIREMENTS,
THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
NO.__________________
BY DRAWING COMPLETION CER
OF THIS DRAWING IS COVER
THIS INDICATES THAT RE
REVISION CERTIFIC

APPROVAL/CERTIFICATION RE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 4 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

C. Wind Load Parameters


ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

Risk Category II Table 1 - 2, SBC 301 2018

Exposure Category C Sec. 26.7.4, SBC 301 2018


DESCRIPTION

Topographic Factor, Kzt 1 Sec. 26.8.2, SBC 301 2018

Wind Directionality Factor, Kd 0.85 Table 26 - 1, SBC 301 2018

Wind Speed, V 145 kph Table 1 (SI Units), SAES – A - 112

Gust Effect Factor, G 0.85 Sec. 26.9.1, SBC 301 2018


JO / EWO

Enclosure Classification Enclosed Sec. 26.10, SBC 301 2018

qZ = 0.613 KZ KZt Kd V2
07/14/2021

Velocity Pressure Eq. 27 - 1, SBC 301 2018


DATE

D. Seismic Design Data


REV
NO.

Frame = Steel Moment Resisting Frames


A

DISCIPLINE Occupancy Category = II


ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 Site Class = D

PROJECT Approximate fundamental period, Ta = Ct hnx = 0.5285sec


ENGINEER
____________
DATE: ___________ Mapped Spectral Response Accelerations :

SS = 0.082
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
S1 = 0.028

CONSTRUCTION Function of site class and mapped period maximum considered Earthquake Spectral Acceleration :
AGENCY
FIRAS MOUSA
DATE: ___________ Fa = 1.6

OPERATIONS Fv = 2.4
_____________
DATE: ___________ Site Coefficients and Adjusted Maximum Considered Earthquake Spectral Response Acceleration :

SMS = Fa SS = 0.1312
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

SM1 = Fv S1 = 0.0672

Design Spectral Response Accelerations :

SDS = 2/3 SMS = 0.0875


COMPLETION CERTIFICATE (DCC)
ERTIFICATION REQUIREMENTS,
AWING IS COVERED, FOR ALL

______________________
DICATES THAT REV. NO. A

SD1 = 2/3 SM1 = 0.0448


VISION CERTIFICATE
THIS INDICATES THAT REV. NO. A

APPROVAL/CERTIFICATION REQUIREM
OF THIS DRAWING IS COVERED, FOR

NO.________________________
BY DRAWING COMPLETION CERTIFICAT
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 5 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

Overstrength System Factor, ΩO = 3.00


ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

Response modification factor, R = 3.50

Deflection Amplification Factor, Cd = 3.00


DESCRIPTION

Coefficient for upper limit on Calculated Period, C U = 1.70

Fundamental Period, T ≤ CU Ta = 0.899 sec

1.4.6 Load Combinations


JO / EWO

A. Service Load Combinations Sec. 2.4.1, SBC 301


07/14/2021

1. D
DATE

2. D+L
REV
NO.

3. D + 0.6W
A

DISCIPLINE 4. D + 0.7E
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 5. 0.6D + 0.6W

PROJECT 6. 0.6D + 0.7E


ENGINEER
____________
DATE: ___________ B. Strength Design Load Combinations Sec. 2.3.1, SBC 301

CERTIFIED
1. 1.4D
ABDULBASIT KHAN
DATE: 07/14/2021
2. 1.2D + 1.6L

CONSTRUCTION 3. 1.2D + W + L
AGENCY
FIRAS MOUSA
DATE: ___________ 4. 1.2D + E + L

OPERATIONS 5. 0.9D + W
_____________
DATE: ___________ 6. 0.9D + E
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

TION CERTIFICATE (DCC)


TION REQUIREMENTS,
IS COVERED, FOR ALL

_______________
THAT REV. NO. A
CERTIFICATE
BY DRAWING COMPLETION CERTIFICATE (DCC)
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 6 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

2 ANALYSIS & DESIGN


ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

2.1 STEEL REACTION SUMMARY

No. Load Case V (kN) H (kN) No. Load Case V (kN) H (kN)
DESCRIPTION

1 Dead 335.00 10.00 8 Seismic Xb 60.00 -45.00

2 Live 70.00 -7.00 9 Seismic Xc -60.00 30.00

3 Wind X -50.00 -25.00 10 Seismic Xd -60.00 -30.00

4 Wind -X 25.00 25.00 11 Seismic Ya 290.00 15.00


JO / EWO

5 Wind Y -27.00 10.00 12 Seismic Yb 290.00 -15.00


07/14/2021

6 Wind -Y -30.00 10.00 13 Seismic Yc -290.00 5.00


DATE

7 Seismic Xa 60.00 45.00 14 Seismic Yd -290.00 -5.00


REV
NO.

DISCIPLINE 2.2 ULTIMATE REACTIONS


ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 No. Load Combination V (kN) H (kN) No. Load Combination V (kN) H (kN)

PROJECT 1 1.4D 469.00 14.00 15 1.2D + L + Eya 762.00 20.00


ENGINEER
____________
DATE: ___________ 2 1.2D + 1.6L 514.00 0.80 16 1.2D + L + Eyb 762.00 -10.00

CERTIFIED
3 1.2D + L + W(+x) 422.00 -20.00 17 1.2D + L + Eyc 182.00 10.00
ABDULBASIT KHAN
DATE: 07/14/2021
4 1.2D + L + W(-x) 497.00 30.00 18 1.2D + L + Eyd 182.00 0.00

CONSTRUCTION 5 1.2D + L + W(+y) 445.00 15.00 19 0.9D + Exa 361.50 54.00


AGENCY
FIRAS MOUSA
DATE: ___________ 6 1.2D + L + W(-y) 442.00 15.00 20 0.9D + Exb 361.50 -36.00

OPERATIONS 7 0.9D + W(+x) 251.50 -16.00 21 0.9D + Exc 241.50 39.00


_____________
DATE: ___________ 8 0.9D + W(-x) 326.50 34.00 22 0.9D + Exd 241.50 -21.00

9 0.9D + W(+y) 274.50 19.00 23 0.9D + Eya 591.50 24.00


______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

10 0.9D + W(-y) 271.50 19.00 24 0.9D + Eyb 591.50 -6.00

11 1.2D + L + Exa 532.00 50.00 25 0.9D + Eyc 11.50 14.00


12 1.2D + L + Exb 532.00 -40.00 26 0.9D + Eyd 11.50 4.00

BY DRAWING COMPLETION CERTIFICATE (DCC)


APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A

13 1.2D + L + Exc 412.00 35.00


REVISION CERTIFICATE

14 1.2D + L + Exd 412.00 -25.00

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 7 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

2.3 PEDESTAL DESIGN


ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

Pedestal Name : P1

Code : ACI 318M-14


DESCRIPTION

Units : Metric

Rebars : ASTM A615

Run Axis : Biaxial

Column Type : Structural


JO / EWO

STEEL COLUMN
07/14/2021

GENERATED PEDESTAL FORCES


DATE

Pu (kN) Mux kN-m Muy kN-m ∇


Load TOP OF BASE PLATE
No. Condition Fx
Combination
REV
NO.

Fz Fy x H Fx x H
A

DISCIPLINE 1 max V 1.2D + L + Eya -762.00 -30.00 0.00


ENGINEER
RYAN JOSEPH S. Z
Fz
QUEBRAR
DATE: 07/14/2021 2 min V 0.9D + Eyc -11.50 -21.00 0.00
X

PROJECT 3 max Hy 0.9D + Eya -591.50 -36.00 0.00


ENGINEER
____________ REACTION
DATE: ___________ 4 max Hx 0.9D + Exa -361.50 0.00 -81.00 -Fz

5 min Hy 1.2D + L + Eyb -762.00 15.00 0.00


CERTIFIED -Fx ∇
TOP OF BASE PLATE
ABDULBASIT KHAN
DATE: 07/14/2021
6 min Hx 1.2D + L + Exb -532.00 0.00 60.00

CONSTRUCTION
AGENCY TOP OF FOOTING ∇
FIRAS MOUSA Z
DATE: ___________ (CRITICAL SECTION FOR
Mu PEDESTAL)
X

OPERATIONS
_____________ TRANSFER FORCES
DATE: ___________
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
By:______
Control Nu
_________

DATE:____
VERIFICA
EDS

BY DRAWING COMPLETION CERTIFICATE (DCC)


APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 8 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

PEDESTAL SHEAR DESIGN


b
ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

Pedestal Dimensions

b = 900 mm, width of pedestal


DESCRIPTION

h = 700 mm, depth of pedestal h


Y

dx = 830 mm, effective depth


X

dz = 630 mm, effective depth P1

Ag = 630000 mm2, gross area of pedestal


JO / EWO

cc = 50 mm, concrete cover


07/14/2021

l = 1.00 normal weight concrete


DATE

f'c = 28 MPa, concrete compressive strength


REV
NO.

fys = 414 MPa, rebar yield strength


A

DISCIPLINE
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 Transverse Longitudinal b = 20 mm Ø

PROJECT 1- 10 mm Ø hoops
ENGINEER
____________
DATE: ___________ 1- 10 mm Ø x - tie

2- 10 mm Ø y - tie
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021

CONSTRUCTION DESIGN FORCES (unit: kN)


AGENCY
FIRAS MOUSA
DATE: ___________

OPERATIONS Location Pu Vu L/C


_____________
DATE: ___________ X - direction 361.50 54.00 0.9D + Exa

Y - direction 591.50 24.00 0.9D + Eya


______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

BY DRAWING COMPLETION CERTIFICATE (DCC)


APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 9 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

SHEAR DESIGN:
ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

at X-direction ( Vu = 54 kN )

øVc = 0.75 ( 0.17 ) ( 1 + Pu 1000 / 14 Ag ) l (f'c)1/2 h dx / 1000 = 408.05 kN (Sec. 22.5.6.1, SBC 304)
DESCRIPTION

Shear carried by steel,Vs = (Vu - øVc) / 0.75 = na kN

Required Spacing, Sreq'd. = Av fys dy / Vs = na mm

Max. Allow. Spacing of ties/hoops ; (Sec. 25.7.2, SBC 304)

or Smax = 16・longitudinal bar = 320 mm


JO / EWO

or Smax = 48・hoop bar dia. = 480 mm


07/14/2021

or Smax = least dimension = 700 mm


DATE

Min. Spacing of ties/hoops = 4/3 dagg = 33 mm


REV
NO.

Therefore, space ties/hoops at 150 mm


A

DISCIPLINE
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 at Y-direction ( Vu = 24 kN )

PROJECT øVc = 0.75 ( 0.17 ) ( 1 + Pu 1000 / 14 Ag ) l (f'c)1/2 b dz / 1000 = 408.19 kN (Sec. 22.5.6.1, SBC 304)
ENGINEER
____________
DATE: ___________ Shear carried by steel,Vs = (Vu - øVc) / 0.75 = na kN

CERTIFIED
Required Spacing, Sreq'd. = Av fys dz / Vs = na mm
ABDULBASIT KHAN
DATE: 07/14/2021
Max. Allow. Spacing of ties/hoops ; (Sec. 25.7.2, SBC 304)

CONSTRUCTION or Smax = 16・longitudinal bar = 320 mm


AGENCY
FIRAS MOUSA
DATE: ___________ or Smax = 48・hoop bar dia. = 480 mm

OPERATIONS or Smax = least dimension = 700 mm


_____________
DATE: ___________ Min. Spacing of ties/hoops = 4/3 dagg = 33 mm
Therefore, space ties/hoops at 150 mm
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

Notes : 1. Axial load is compression if sign is positive, tension if otherwise.

2. ø = 0.75 (capacity reduction for shear).


BY DRAWING COMPLETION CERTIFICATE (DCC)
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A

3. Utilized framing is OMRF


REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 10 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK
ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

Pedestal Name : P2

Code : ACI 318M-14


DESCRIPTION

Units : Metric

Rebars : ASTM A615

Run Axis : Biaxial

Column Type : Structural


JO / EWO

STEEL COLUMN
07/14/2021

GENERATED PEDESTAL FORCES


DATE

Pu (kN) Mux kN-m Muy kN-m ∇


Load TOP OF BASE PLATE
No. Condition Fx
Combination
REV
NO.

Fz Fy x H Fx x H
A

DISCIPLINE 1 max V 1.2D + L + Eya -762.00 -30.00 0.00


ENGINEER
RYAN JOSEPH S. Z
Fz
QUEBRAR
DATE: 07/14/2021 2 min V 0.9D + Eyc -11.50 -21.00 0.00
X

PROJECT 3 max Hy 0.9D + Eya -591.50 -36.00 0.00


ENGINEER
____________ REACTION
DATE: ___________ 4 max Hx 0.9D + Exa -361.50 0.00 -81.00 -Fz

5 min Hy 1.2D + L + Eyb -762.00 15.00 0.00


CERTIFIED -Fx ∇
TOP OF BASE PLATE
ABDULBASIT KHAN
DATE: 07/14/2021
6 min Hx 1.2D + L + Exb -532.00 0.00 60.00

CONSTRUCTION
AGENCY TOP OF FOOTING ∇
FIRAS MOUSA Z
DATE: ___________ (CRITICAL SECTION FOR
Mu PEDESTAL)
X

OPERATIONS
_____________ TRANSFER FORCES
DATE: ___________
OPERATIONS
_____________ TRANSFER FORCES
DATE: ___________
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

BY DRAWING COMPLETION CERTIFICATE (DCC)


APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 11 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

PEDESTAL SHEAR DESIGN


b
ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

Pedestal Dimensions

b = 800 mm, width of pedestal


DESCRIPTION

h = 700 mm, depth of pedestal h


Y

dx = 730 mm, effective depth


X

dz = 630 mm, effective depth P2

Ag = 560000 mm2, gross area of pedestal


JO / EWO

cc = 50 mm, concrete cover


07/14/2021

l = 1.00 normal weight concrete


DATE

f'c = 28 MPa, concrete compressive strength


REV
NO.

fys = 414 MPa, rebar yield strength


A

DISCIPLINE
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 Transverse Longitudinal b = 20 mm Ø

PROJECT 1- 10 mm Ø hoops
ENGINEER
____________
DATE: ___________ 1- 10 mm Ø x - tie

2- 10 mm Ø y - tie
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021

CONSTRUCTION DESIGN FORCES (unit: kN)


AGENCY
FIRAS MOUSA
DATE: ___________
OPERATIONS Location Pu Vu L/C
_____________
DATE: ___________ X - direction 361.50 54.00 0.9D + Exa

Y - direction 591.50 24.00 0.9D + Eya


______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

BY DRAWING COMPLETION CERTIFICATE (DCC)


APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 12 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

SHEAR DESIGN:
ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

at X-direction ( Vu = 54 kN )

øVc = 0.75 ( 0.17 ) ( 1 + Pu 1000 / 14 Ag ) l (f'c)1/2 h dx / 1000 = 360.65 kN (Sec. 22.5.6.1, SBC 304)
DESCRIPTION

Shear carried by steel,Vs = (Vu - øVc) / 0.75 = na kN

Required Spacing, Sreq'd. = Av fys dy / Vs = na mm

Max. Allow. Spacing of ties/hoops ; (Sec. 25.7.2, SBC 304)

or Smax = 16・longitudinal bar = 320 mm


JO / EWO

or Smax = 48・hoop bar dia. = 480 mm


07/14/2021

or Smax = least dimension = 700 mm


DATE

Min. Spacing of ties/hoops = 4/3 dagg = 33 mm


REV
NO.

Therefore, space ties/hoops at 150 mm


A

DISCIPLINE
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 at Y-direction ( Vu = 24 kN )

PROJECT øVc = 0.75 ( 0.17 ) ( 1 + Pu 1000 / 14 Ag ) l (f'c)1/2 b dz / 1000 = 365.69 kN (Sec. 22.5.6.1, SBC 304)
ENGINEER
____________
DATE: ___________ Shear carried by steel,Vs = (Vu - øVc) / 0.75 = na kN

Required Spacing, Sreq'd. = Av fys dz / Vs = na mm


CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
Max. Allow. Spacing of ties/hoops ; (Sec. 25.7.2, SBC 304)

CONSTRUCTION or Smax = 16・longitudinal bar = 320 mm


AGENCY
FIRAS MOUSA
DATE: ___________
CONSTRUCTION
AGENCY
FIRAS MOUSA
DATE: ___________ or Smax = 48・hoop bar dia. = 480 mm

OPERATIONS or Smax = least dimension = 700 mm


_____________
DATE: ___________ Min. Spacing of ties/hoops = 4/3 dagg = 33 mm

Therefore, space ties/hoops at 150 mm


______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

Notes : 1. Axial load is compression if sign is positive, tension if otherwise.

2. ø = 0.75 (capacity reduction for shear).


BY DRAWING COMPLETION CERTIFICATE (DCC)
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A

3. Utilized framing is OMRF


REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 13 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

2.4 FOUNDATION DESIGN ground slab


(if any)
ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

Footing Name : F1
t

FOOTING GEOMETRY DW
h
SD
GWT
DESCRIPTION

D
LX = 2.2 m footing width along x-axis
T

LZ = 2.2 m footing width along z-axis


y
LX
T = 0.55 m footing thickness
x
SD = 0.95 m soil depth
JO / EWO

D = 1.5 m depth of foundation

lZ
DW
07/14/2021

= 3 m depth of water table eZ


DATE

LZ

lX = 0.9 m pedestal width along x-axis z eX


REV
NO.

lZ = 0.7 m pedestal width along z-axis x


A

lX
DISCIPLINE h = 0 m column height
ENGINEER LX
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 t = 0 mm ground slab thickness (assumed)

PROJECT eX = 0 m distance along x axis from the centroid of footing to centroid of pedestal
ENGINEER
____________
DATE: ___________ eZ = 0 m distance along z axis from the centroid of footing to centroid of pedestal

CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
CONSTANTS AND ALLOWABLE LIMITS
CONSTRUCTION gS = 18.22 kN/m3 unit weight of soil
AGENCY
FIRAS MOUSA
DATE: ___________ gW = 9.81 kN/m3 unit weight of water

OPERATIONS gC = 24 kN/m3 unit weight of concrete


_____________
DATE: ___________ qap = 300 kN/m2 allow. base pressure

qat = 150 kN/m2 allow. base pressure (temporary condtion)


______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

SFU = 1.2 min. safety factor against uplift

SFS = 1.5 ` min. safety factor against sliding

SFO = 1.5 min. safety factor against overturning


BY DRAWING COMPLETION CERTIFICATE (DCC)
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A

m = 0.4 coefficient of friction


REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 14 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

FOUNDATION WEIGHT
ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

WS = 72.87 kN imposed soil weight

WF = 63.89 kN footing weight


DESCRIPTION

WT = 136.8 kN total weight

SERVICE REACTIONS

GLOBAL REACTIONS (kN, kN-m)


JO / EWO

CONDITION LOAD COMBINATION


FX FY FZ MX MZ
07/14/2021

1 Max Fx SLC - 0.6D + 0.7Exb 25.50 256.36 0.00 0.00 38.27


DATE

2 Min Fx SLC - D + 0.7Exa -41.50 399.27 0.00 0.00 -62.28


REV
NO.

3 Max Fy SLC - D + 0.7Eyb -10.00 560.27 -10.50 15.76 -15.01


A

DISCIPLINE 4 Min Fy SLC - D + 0.7Eya -6.00 9.88 -3.50 5.25 -15.01


ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 5 Max Fz SLC - D + 0.7Eya -10.00 560.27 10.50 -15.76 -15.01

PROJECT 6 Min Fz SLC - 0.6D + 0.7Eyc -6.00 560.27 -10.50 15.76 -15.01
ENGINEER
____________
DATE: ___________ 7 Max Mx SLC - D + 0.7Eya -10.00 560.27 -10.50 15.76 -15.01

8 Min Mx SLC - D + 0.7Eyb -10.00 560.27 10.50 -15.76 -15.01


CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
9 Max My SLC - 0.6D + 0.7Exb -10.00 357.27 0.00 0.00 -15.01

CONSTRUCTION 10 Min My SLC - D + 0.7Exa -10.00 357.27 0.00 0.00 -15.01


AGENCY
FIRAS MOUSA
DATE: ___________ 11 Max Mz SLC - D 25.50 254.88 0.00 0.00 38.28

OPERATIONS 12 Min Mz SLC - D -41.50 396.79 0.00 0.00 -62.30


_____________
DATE: ___________
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

BY DRAWING COMPLETION CERTIFICATE (DCC)


APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 15 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM

FY
CERT

ABK

STABILITY CHECK
FX
base plate level
ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

SLIDING CHECK

FH = ( FX2 + FZ2 )1/2 maximum lateral force H


DESCRIPTION

RY = WT + FY - BF total vertical load

T
FS = mRY / FH factor of safety againts sliding
y

LX
x

UPLIFT CHECK
JO / EWO

UF = min. FY + BF critical uplift force

LX LZ (D - DW) gW
07/14/2021

where: BF =
DATE

FX
MX
note: if D < DW, then no bouyant force, BF
MZ LZ
REV
NO.

FS = (WT + FY) / UF factor of safety againts uplift


A

DISCIPLINE
ENGINEER x
FZ
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 OVERTURNING CHECK

LX
PROJECT OMX = FZ H + M X maximum overturning moment about x-axis
ENGINEER
____________
DATE: ___________ OMZ = FX H + M Z maximum overturning moment about y-axis

CERTIFIED
where: H = T+h
ABDULBASIT KHAN
DATE: 07/14/2021
RMX = (WT + FY - BF) (eZ' + LZ / 2) righting moment about x-axis

CONSTRUCTION RMZ = (WT + FY - BF) (eX' + LX / 2) righting moment about z-axis


AGENCY
FIRAS MOUSA
DATE: ___________ FS = RM / OM factor of safety againts overturning

OPERATIONS

_____________
DATE: ___________ BASE PRESSURE CHECK

e X' = (FX H + MZ) / (WT + FY) + eX eccentricity of load along x-axis from the centroid of footing
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

eZ ' = (FZ H + MX) / (WT + FY) + eZ eccentricity of load along z-axis from the centroid of footing
BY DRAWING COMPLETION CERTIFICATE (DCC)
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
16 OF 53 A
APPROVAL/C
NO.___
BY DRAWING
R

OF THIS D
THIS I
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 16 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

TABULATED SLIDING AND UPLIFT CHECK


ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

FORCES (kN) SLIDING (kN) UPLIFT (kN)

CONDITION
FX FY FZ WT FH RY FS Evaluation UF FS Evaluation
DESCRIPTION

1 Max Fx 25.50 256.36 0.00 136.76 25.50 393.12 6.17 > 1.50 , SAFE! n.a. n.a. n.a.

2 Min Fx -41.50 399.27 0.00 136.76 41.50 536.03 5.17 > 1.50 , SAFE! n.a. n.a. n.a.

3 Max Fy -10.00 560.27 -10.50 136.76 14.50 697.03 19.23 > 1.50 , SAFE! n.a. n.a. n.a.
JO / EWO

4 Min Fy -6.00 9.88 -3.50 136.76 6.95 146.64 8.44 > 1.50 , SAFE! n.a. n.a. n.a.
07/14/2021

5 Max Fz -10.00 560.27 10.50 136.76 14.50 697.03 19.23 > 1.50 , SAFE! n.a. n.a. n.a.
DATE

6 Min Fz -6.00 560.27 -10.50 136.76 12.09 697.03 23.06 > 1.50 , SAFE! n.a. n.a. n.a.
REV
NO.

7 Max Mx -10.00 560.27 -10.50 136.76 14.50 697.03 19.23 > 1.50 , SAFE! n.a. n.a. n.a.
A

DISCIPLINE 8 Min Mx -10.00 560.27 10.50 136.76 14.50 697.03 19.23 > 1.50 , SAFE! n.a. n.a. n.a.
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 9 Max My -10.00 357.27 0.00 136.76 10.00 494.03 19.76 > 1.50 , SAFE! n.a. n.a. n.a.

PROJECT 10 Min My -10.00 357.27 0.00 136.76 10.00 494.03 19.76 > 1.50 , SAFE! n.a. n.a. n.a.
ENGINEER
____________
DATE: ___________ 11 Max Mz 25.50 254.88 0.00 136.76 25.50 391.64 6.14 > 1.50 , SAFE! n.a. n.a. n.a.

12 Min Mz -41.50 396.79 0.00 136.76 41.50 533.55 5.14 > 1.50 , SAFE! n.a. n.a. n.a.
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021

CONSTRUCTION
AGENCY
FIRAS MOUSA
DATE: ___________

OPERATIONS

_____________
DATE: ___________
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

BY DRAWING COMPLETION CERTIFICATE (DCC)


APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
17 OF 53 A
APPROVAL/C
NO.___
BY DRAWING
R

OF THIS D
THIS I
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 17 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

TABULATED OVERTURNING CHECK


ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

FORCES (kN) OVERTURNING (m, kN-m)

CONDITION About x-axis About z-axis


FX FY FZ MX MZ WT Evaluation
DESCRIPTION

OMx RMx FS Omz RMz FS

1 Max Fx 25.50 256.36 0.00 0.00 38.27 136.76 0.00 432.43 n.a. 52.30 483.54 9.25 > 1.50 , SAFE!

2 Min Fx -41.50 399.27 0.00 0.00 -62.28 136.76 0.00 589.63 n.a. -39.46 675.40 17.12 > 1.50 , SAFE!

3 Max Fy -10.00 560.27 -10.50 15.76 -15.01 136.76 21.54 773.70 35.92 -9.51 787.64 82.82 > 1.50 , SAFE!
JO / EWO

4 Min Fy -6.00 9.88 -3.50 5.25 -15.01 136.76 7.18 164.24 22.87 -11.71 180.37 15.4 > 1.50 , SAFE!
07/14/2021

5 Max Fz -10.00 560.27 10.50 -15.76 -15.01 136.76 -9.99 773.70 77.45 -9.51 787.64 82.82 > 1.50 , SAFE!
DATE

6 Min Fz -6.00 560.27 -10.50 15.76 -15.01 136.76 21.54 773.70 35.92 -11.71 787.64 67.26 > 1.50 , SAFE!
REV
NO.

7 Max Mx -10.00 560.27 -10.50 15.76 -15.01 136.76 21.54 773.70 35.92 -9.51 787.64 82.82 > 1.50 , SAFE!
A

DISCIPLINE 8 Min Mx -10.00 560.27 10.50 -15.76 -15.01 136.76 -9.99 773.70 77.45 -9.51 787.64 82.82 > 1.50 , SAFE!
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 9 Max My -10.00 357.27 0.00 0.00 -15.01 136.76 0.00 543.43 n.a. -9.51 563.19 59.22 > 1.50 , SAFE!

PROJECT 10 Min My -10.00 357.27 0.00 0.00 -15.01 136.76 0.00 543.43 n.a. -9.51 563.19 59.22 > 1.50 , SAFE!
ENGINEER
____________
DATE: ___________ 11 Max Mz 25.50 254.88 0.00 0.00 38.28 136.76 0.00 430.80 n.a. 52.31 481.72 9.21 > 1.50 , SAFE!

12 Min Mz -41.50 396.79 0.00 0.00 -62.30 136.76 0.00 586.91 n.a. -39.48 672.27 17.03 > 1.50 , SAFE!
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021

CONSTRUCTION
AGENCY
FIRAS MOUSA
DATE: ___________

OPERATIONS

_____________
DATE: ___________
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

BY DRAWING COMPLETION CERTIFICATE (DCC)


APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
BY DRAWING COMPLET
NO.___________
REVISION C

OF THIS DRAWING I
APPROVAL/CERTIFICA
THIS INDICATES
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 18 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

TABULATED BASEPRESSURE CHECK


ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

BASE PRESSURE

CONDITION
A eX' qUmax X qUmin X MZ MRZ eZ' qUmax Z qUmin Z MX MRX
Evaluation Evaluation
(m2) (m) (kPa) (kPa) (kN-m) (kN-m) (m) (kPa) (kPa) (kN-m) (kN-m)
DESCRIPTION

1 Min Fy 4.84 0.133 110.68 51.76 - 0.00 SAFE! 0.000 81.22 81.22 - - SAFE!

2 Max Fz 4.84 -0.159 158.78 62.72 - - SAFE! 0.000 110.75 110.75 - - SAFE!

3 Min Fz 4.84 -0.029 155.40 132.62 - - SAFE! 0.014 149.51 138.52 - - SAFE!
JO / EWO

4 Max Mx 4.84 -0.125 40.63 19.97 - - SAFE! 0.023 32.20 28.40 - - SAFE!
07/14/2021

5 Min Mx 4.84 -0.029 155.40 132.62 - - SAFE! -0.014 149.51 138.52 - - SAFE!
DATE

6 Max My 4.84 -0.026 154.23 133.80 - - SAFE! 0.014 149.51 138.52 - - SAFE!
REV
NO.

7 Min My 4.84 -0.029 155.40 132.62 - - SAFE! 0.014 149.51 138.52 - - SAFE!
A

DISCIPLINE 8 Max Mz 4.84 -0.029 155.40 132.62 - - SAFE! -0.014 149.51 138.52 - - SAFE!
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 9 Min Mz 4.84 -0.042 113.76 90.38 - - SAFE! 0.000 102.07 102.07 - - SAFE!

PROJECT 10 0.00 4.84 -0.042 113.76 90.38 - - SAFE! 0.000 102.07 102.07 - - SAFE!
ENGINEER
____________
DATE: ___________ 11 0.00 4.84 0.134 110.49 51.35 - - SAFE! 0.000 80.92 80.92 - - SAFE!

12 0.00 4.84 -0.160 158.34 62.13 - - SAFE! 0.000 110.24 110.24 - - SAFE!
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021

CONSTRUCTION
AGENCY
FIRAS MOUSA
DATE: ___________

OPERATIONS

_____________
DATE: ___________
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

AWING COMPLETION CERTIFICATE (DCC)


OVAL/CERTIFICATION REQUIREMENTS,
THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
NO.__________________
BY DRAWING COMPLETION CER
OF THIS DRAWING IS COVER
THIS INDICATES THAT RE
REVISION CERTIFIC

APPROVAL/CERTIFICATION RE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 19 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

STRENGTH CHECK
ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

GEOMETRY AND PARAMETERS

cc = 75 mm concrete cover dX = 455 mm effective depth along x-dir


DESCRIPTION

f'c = 28 MPa concrete compressive strength dY = 455 mm effective depth along y-dir

fy = 414 MPa reinforcing steel yeild strength d = 455 mm least effective depth

ø = 0.9 moment reduction factor ρMAX = 0.0218

ø = 0.75 shear reduction factor


JO / EWO

07/14/2021

ULTIMATE REACTIONS
DATE

FUX FUY FUZ MUX MUZ


CONDITION LOAD COMBINATION
(kN) (kN) (kN) (kN-m) (kN-m)
REV
NO.

DISCIPLINE 1 Max Fx ULC - 1.2D + L + Exb 40.00 558.72 0.00 0.00 60.03
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 2 Min Fx ULC - 0.9D + Exa 54.00 381.54 0.00 0.00 -81.04

PROJECT 3 Max Fy ULC - 1.2D + L + Eyb 5.00 788.72 15.00 22.52 -7.50
ENGINEER
____________
DATE: ___________ 4 Min Fy ULC - 1.2D + L + Eya 9.00 29.31 5.00 7.51 -7.50

5 Max Fz ULC - 1.2D + L + Eya 5.00 788.72 15.00 -22.52 -7.50


CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
6 Min Fz ULC - 0.9D + Eyc 9.00 788.72 15.00 22.52 -7.50

CONSTRUCTION 7 Max Mx ULC - 1.2D + L + Eya 5.00 788.72 15.00 22.52 -7.50
AGENCY
FIRAS MOUSA
DATE: ___________ 8 Min Mx ULC - 1.2D + L + Eyb 5.00 788.72 15.00 -22.52 -7.50

OPERATIONS 9 Max My ULC - 1.2D + L + Exb 14.00 500.17 0.00 0.00 -21.01

_____________
DATE: ___________ 10 Min My ULC - 0.9D + Exa 14.00 500.17 0.00 0.00 -21.01

11 Max Mz ULC - 1.4D 40.00 555.75 0.00 0.00 60.04


______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

12 Min Mz ULC - 1.4D 54.00 379.31 0.00 0.00 -81.06


COMPLETION CERTIFICATE (DCC)
ERTIFICATION REQUIREMENTS,
AWING IS COVERED, FOR ALL

______________________
DICATES THAT REV. NO. A
VISION CERTIFICATE
THIS INDICATES THAT REV. NO. A

APPROVAL/CERTIFICATION REQUIREM
OF THIS DRAWING IS COVERED, FOR

NO.________________________
BY DRAWING COMPLETION CERTIFICAT
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 20 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

TABULATED MAXIMUM BASE PRESSURE


ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

ULTIMATE BASE PRESSURE

CONDITION
eX' qUmax X eZ' qUmax Z
(m) (kPa) (m) (kPa)
DESCRIPTION

1 Max Fx 0.118 204.88 0.000 155.00

2 Min Fx -0.099 150.35 0.000 118.39

3 Max Fy -0.005 205.28 0.033 220.74


JO / EWO

4 Min Fy -0.015 47.48 0.062 53.33


07/14/2021

5 Max Fz -0.005 205.28 -0.015 210.80


DATE

6 Min Fz -0.003 204.17 0.033 220.74


REV
NO.

7 Max Mx -0.005 205.28 0.033 220.74


A

DISCIPLINE 8 Min Mx -0.005 205.28 -0.015 210.80


ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 9 Max My -0.021 151.08 0.000 142.90

PROJECT 10 Min My -0.021 151.08 0.000 142.90


ENGINEER
____________
DATE: ___________ 11 Max Mz 0.118 204.07 0.000 154.38

12 Min Mz -0.100 150.09 0.000 117.93


CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021

CONSTRUCTION CHECK FOR PUNCHING SHEAR


AGENCY
FIRAS MOUSA
DATE: ___________ VU = qU(LX LZ - (lX + d/2)(lZ + d/2)) = 722.92 kN ultimate punching shear

OPERATIONS øVc = 0.75 Vc = 2896.28 kN punching shear capacity


_____________
DATE: ___________ øVc > VUP SAFE!
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

BY DRAWING COMPLETION CERTIFICATE (DCC)


APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
21 OF 53 A
APPROVAL/C
NO.___
BY DRAWING
R

OF THIS D
THIS I
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 21 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

CHECK FOR WIDE BEAM SHEAR


ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

X- Direction (at a dist."dX" from face) Z-Direction (at a dist."dZ" from face)

VUWX = qU [ ( LX / 2 + eX ) - dX ] LZ VUWZ = qU [ ( LZ / 2 + eZ ) - dZ ] LX
DESCRIPTION

= 313.23 kN = 313.23 kN

øVcx = ø 0.17 ( f'c )½ LZ dX / 1000 øVcz = ø 0.17 ( f'c )½ LX dZ / 1000

= 675.34 kN > VUX SAFE! = 675.34 kN > VUZ SAFE!


JO / EWO

CHECK FOR MINIMUM SHRINKAGE AND TEMPERATURE REQUIREMENT


07/14/2021

Along X- Direction Along Z- Direction


DATE

Astx = 0.0020 LZ T / 2 Astz = 0.0020 LX T / 2


REV
NO.

Astx = 1210 mm2 Astz = 1210 mm2


A

DISCIPLINE
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 provided, 12mm @ 100mm O.C. provided, 12mm @ 100mm O.C.

PROJECT Astxact = 2432 mm2 > Astx SAFE! Astzact = 2432 mm2 > Asty SAFE!
ENGINEER
____________
DATE: ___________

CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021

CONSTRUCTION
AGENCY
FIRAS MOUSA
DATE: ___________

OPERATIONS

_____________
DATE: ___________
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

BY DRAWING COMPLETION CERTIFICATE (DCC)


APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
BY DRAWING COMPLET
NO.___________
REVISION C

OF THIS DRAWING I
APPROVAL/CERTIFICA
THIS INDICATES
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 22 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

CHECK FOR MAIN REINFORCEMENT


ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

MUXdes = qU LZ LX12 / 2 MUZdes = qU LX LZ12 / 2

MUXdes = 335.44 kN.m ultimate design moment MUZdes = 310.05 kN.m ultimate design moment
DESCRIPTION

MUXdes = ø f'c LX d² ω ( 1 - 0.59 ω ) MUZdes = ø f'c LZ d² ω ( 1 - 0.59 ω )

ω = 0.0297 ω = 0.0275

ρ = ω f'c / fy ρ = ω f'c / fy
JO / EWO

ρ = 0.002 ρ = 0.0019
07/14/2021
DATE

ρMIN = 0.002 ρMIN = 0.002


REV
NO.

DISCIPLINE therefore use, therefore use,


ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 ρ = 0.002 < ρMAX SAFE! ρ = 0.002 < ρMAX SAFE!

PROJECT Asx = ρ LZ d Asz = ρ LX d


ENGINEER
____________
DATE: ___________ = 2002 mm2 = 2002 mm2

CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
20mm @ 130mm O.C. 20mm @ 130mm O.C.

CONSTRUCTION AsXact = 5268 mm2 > Asx SAFE! AsZact = 5268 mm2 > Asz SAFE!
AGENCY
FIRAS MOUSA
DATE: ___________

OPERATIONS

_____________
DATE: ___________
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

AWING COMPLETION CERTIFICATE (DCC)


OVAL/CERTIFICATION REQUIREMENTS,
THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
NO.__________________
BY DRAWING COMPLETION CER
OF THIS DRAWING IS COVER
THIS INDICATES THAT RE
REVISION CERTIFIC

APPROVAL/CERTIFICATION RE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 23 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

ground slab
(if any)
ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

Footing Name : F2
t

FOOTING GEOMETRY DW
h
SD
GWT

D
DESCRIPTION

LX = 2.1 m footing width along x-axis


T

LZ = 2.1 m footing width along z-axis


y LX
T = 0.5 m footing thickness
x
SD = 1.00 m soil depth
JO / EWO

D = 1.5 m depth of foundation

lZ
DW
07/14/2021

= 3 m depth of water table eZ


DATE

LZ

lX = 0.9 m pedestal width along x-axis z eX


REV
NO.

lZ = 0.7 m pedestal width along z-axis x


A

lX
DISCIPLINE h = 1.5 m pedestal height
ENGINEER LX
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 t = 0 mm ground slab thickness (assumed)

PROJECT eX = 0 m distance along x axis from the centroid of footing to centroid of pedestal
ENGINEER
____________
DATE: ___________ eZ = 0 m distance along z axis from the centroid of footing to centroid of pedestal

CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
CONSTANTS AND ALLOWABLE LIMITS

CONSTRUCTION gS = 18.22 kN/m3 unit weight of soil


AGENCY
FIRAS MOUSA
DATE: ___________ gW = 9.81 kN/m3 unit weight of water

OPERATIONS gC = 24 kN/m3 unit weight of concrete


_____________
DATE: ___________ qap = 300 kN/m2 allow. base pressure

qat = 150 kN/m2 allow. base pressure (temporary condtion)


______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

SFU = 1.2 min. safety factor against uplift

SFS = 1.5 ` min. safety factor against sliding

SFO = 1.5 min. safety factor against overturning


COMPLETION CERTIFICATE (DCC)
ERTIFICATION REQUIREMENTS,
AWING IS COVERED, FOR ALL

______________________
DICATES THAT REV. NO. A

m = 0.4 coefficient of friction


VISION CERTIFICATE
THIS INDICATES THAT REV. NO. A

APPROVAL/CERTIFICATION REQUIREM
OF THIS DRAWING IS COVERED, FOR

NO.________________________
BY DRAWING COMPLETION CERTIFICAT
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 24 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

FOUNDATION WEIGHT
ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

WS = 72.87 kN imposed soil weight

WF = 63.89 kN footing weight


DESCRIPTION

WT = 136.8 kN total weight

SERVICE REACTIONS

GLOBAL REACTIONS (kN, kN-m)


JO / EWO

CONDITION LOAD COMBINATION


FX FY FZ MX MZ
07/14/2021

1 Max Fx SLC - 0.6D + 0.7Exb 25.50 256.36 0.00 0.00 38.27


DATE

2 Min Fx SLC - D + 0.7Exa -41.50 399.27 0.00 0.00 -62.28


REV
NO.

3 Max Fy SLC - D + 0.7Eyb -10.00 560.27 -10.50 15.76 -15.01


A

DISCIPLINE 4 Min Fy SLC - D + 0.7Eya -6.00 9.88 -3.50 5.25 -15.01


ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 5 Max Fz SLC - D + 0.7Eya -10.00 560.27 10.50 -15.76 -15.01

PROJECT 6 Min Fz SLC - 0.6D + 0.7Eyc -6.00 560.27 -10.50 15.76 -15.01
ENGINEER
____________
DATE: ___________ 7 Max Mx SLC - D + 0.7Eya -10.00 560.27 -10.50 15.76 -15.01

CERTIFIED
8 Min Mx SLC - D + 0.7Eyb -10.00 560.27 10.50 -15.76 -15.01
ABDULBASIT KHAN
DATE: 07/14/2021
9 Max My SLC - 0.6D + 0.7Exb -10.00 357.27 0.00 0.00 -15.01

CONSTRUCTION 10 Min My SLC - D + 0.7Exa -10.00 357.27 0.00 0.00 -15.01


AGENCY
FIRAS MOUSA
DATE: ___________ 11 Max Mz SLC - D 25.50 254.88 0.00 0.00 38.28

OPERATIONS 12 Min Mz SLC - D -41.50 396.79 0.00 0.00 -62.30


_____________
DATE: ___________
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

TION CERTIFICATE (DCC)


TION REQUIREMENTS,
IS COVERED, FOR ALL

_______________
THAT REV. NO. A
CERTIFICATE
BY DRAWING COMPLETION CERTIFICATE (DCC)
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 25 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM

FY
CERT

ABK

STABILITY CHECK
FX
base plate level
ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

SLIDING CHECK

FH = ( FX2 + FZ2 )1/2 maximum lateral force H


DESCRIPTION

RY = WT + FY - BF total vertical load

T
FS = mRY / FH factor of safety againts sliding
y

LX
x

UPLIFT CHECK
JO / EWO

UF = min. FY + BF critical uplift force

LX LZ (D - DW) gW
07/14/2021

where: BF =
DATE

FX
MX
note: if D < DW, then no bouyant force, BF
MZ LZ
REV
NO.

FS = (WT + FY) / UF factor of safety againts uplift


A

DISCIPLINE
ENGINEER x
FZ
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 OVERTURNING CHECK

LX
PROJECT OMX = FZ H + M X maximum overturning moment about x-axis
ENGINEER
____________
DATE: ___________ OMZ = FX H + M Z maximum overturning moment about y-axis

CERTIFIED
where: H = T+h
ABDULBASIT KHAN
DATE: 07/14/2021
RMX = (WT + FY - BF) (eZ' + LZ / 2) righting moment about x-axis

CONSTRUCTION RMZ = (WT + FY - BF) (eX' + LX / 2) righting moment about z-axis


AGENCY
FIRAS MOUSA
DATE: ___________ FS = RM / OM factor of safety againts overturning

OPERATIONS
_____________
DATE: ___________ BASE PRESSURE CHECK

e X' = (FX H + MZ) / (WT + FY) + eX eccentricity of load along x-axis from the centroid of footing
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

eZ ' = (FZ H + MX) / (WT + FY) + eZ eccentricity of load along z-axis from the centroid of footing
BY DRAWING COMPLETION CERTIFICATE (DCC)
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 26 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

TABULATED SLIDING AND UPLIFT CHECK


ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

FORCES (kN) SLIDING (kN) UPLIFT (kN)

CONDITION
FX FY FZ WT FH RY FS Evaluation UF FS Evaluation
DESCRIPTION

1 Max Fx 25.50 256.36 0.00 136.76 25.50 136.76 5.93 > 1.50 , SAFE! n.a. n.a. n.a.

2 Min Fx -41.50 399.27 0.00 136.76 41.50 136.76 5.02 > 1.50 , SAFE! n.a. n.a. n.a.

3 Max Fy -10.00 560.27 -10.50 136.76 14.50 126.26 18.82 > 1.50 , SAFE! n.a. n.a. n.a.
JO / EWO

4 Min Fy -6.00 9.88 -3.50 136.76 6.95 133.26 7.58 > 1.50 , SAFE! n.a. n.a. n.a.
07/14/2021

5 Max Fz -10.00 560.27 10.50 136.76 14.50 147.26 18.82 > 1.50 , SAFE! n.a. n.a. n.a.
DATE

6 Min Fz -6.00 560.27 -10.50 136.76 12.09 126.26 22.57 > 1.50 , SAFE! n.a. n.a. n.a.
REV
NO.

7 Max Mx -10.00 560.27 -10.50 136.76 14.50 126.26 18.82 > 1.50 , SAFE! n.a. n.a. n.a.
A

DISCIPLINE 8 Min Mx -10.00 560.27 10.50 136.76 14.50 147.26 18.82 > 1.50 , SAFE! n.a. n.a. n.a.
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 9 Max My -10.00 357.27 0.00 136.76 10.00 136.76 19.16 > 1.50 , SAFE! n.a. n.a. n.a.

PROJECT 10 Min My -10.00 357.27 0.00 136.76 10.00 136.76 19.16 > 1.50 , SAFE! n.a. n.a. n.a.
ENGINEER
____________
DATE: ___________ 11 Max Mz 25.50 254.88 0.00 136.76 25.50 136.76 5.91 > 1.50 , SAFE! n.a. n.a. n.a.

12 Min Mz -41.50 396.79 0.00 136.76 41.50 136.76 5.00 > 1.50 , SAFE! n.a. n.a. n.a.
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021

CONSTRUCTION
AGENCY
FIRAS MOUSA
DATE: ___________

OPERATIONS
_____________
DATE: ___________
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
By:______
Control Nu
_________

DATE:____
VERIFICA
EDS

BY DRAWING COMPLETION CERTIFICATE (DCC)


APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 27 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

TABULATED OVERTURNING CHECK


ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

FORCES (kN) OVERTURNING (m, kN-m)

CONDITION About x-axis About z-axis


FX FY FZ MX MZ WT Evaluation
DESCRIPTION

OMx RMx FS Omz RMz FS

1 Max Fx 25.50 256.36 0.00 0.00 38.27 136.76 0.00 397.06 n.a. 89.27 487.81 5.46 > 1.50 , SAFE!

2 Min Fx -41.50 399.27 0.00 0.00 -62.28 136.76 0.00 547.11 n.a. 20.72 693.01 33.45 > 1.50 , SAFE!

3 Max Fy -10.00 560.27 -10.50 15.76 -15.01 136.76 36.76 722.98 19.67 4.99 750.27 150.35 > 1.50 , SAFE!
JO / EWO

4 Min Fy -6.00 9.88 -3.50 5.25 -15.01 136.76 12.25 139.57 11.39 -3.01 165.90 55.12 > 1.50 , SAFE!
07/14/2021

5 Max Fz -10.00 560.27 10.50 -15.76 -15.01 136.76 5.24 722.98 137.97 4.99 750.27 150.35 > 1.50 , SAFE!
DATE

6 Min Fz -6.00 560.27 -10.50 15.76 -15.01 136.76 36.76 722.98 19.67 -3.01 743.45 246.99 > 1.50 , SAFE!
REV
NO.

7 Max Mx -10.00 560.27 -10.50 15.76 -15.01 136.76 36.76 722.98 19.67 4.99 750.27 150.35 > 1.50 , SAFE!
A

DISCIPLINE 8 Min Mx -10.00 560.27 10.50 -15.76 -15.01 136.76 5.24 722.98 137.97 4.99 750.27 150.35 > 1.50 , SAFE!
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 9 Max My -10.00 357.27 0.00 0.00 -15.01 136.76 0.00 503.01 n.a. 4.99 536.55 107.53 > 1.50 , SAFE!

PROJECT 10 Min My -10.00 357.27 0.00 0.00 -15.01 136.76 0.00 503.01 n.a. 4.99 536.55 107.53 > 1.50 , SAFE!
ENGINEER
____________
DATE: ___________ 11 Max Mz 25.50 254.88 0.00 0.00 38.28 136.76 0.00 395.50 n.a. 89.28 485.90 5.44 > 1.50 , SAFE!

12 Min Mz -41.50 396.79 0.00 0.00 -62.30 136.76 0.00 544.51 n.a. 20.70 689.71 33.32 > 1.50 , SAFE!
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021

CONSTRUCTION
AGENCY
FIRAS MOUSA
DATE: ___________

OPERATIONS
_____________
DATE: ___________
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

BY DRAWING COMPLETION CERTIFICATE (DCC)


APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 28 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

TABULATED BASEPRESSURE CHECK


ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

BASE PRESSURE

CONDITION
A eX' qUmax X qUmin X MZ MRZ eZ' qUmax Z qUmin Z MX MRX
Evaluation Evaluation
(m2) (m) (kPa) (kPa) (kN-m) (kN-m) (m) (kPa) (kPa) (kN-m) (kN-m)
DESCRIPTION

1 Min Fy 4.41 0.236 143.57 27.93 - - SAFE! 0.000 85.75 85.75 - - SAFE!

2 Max Fz 4.41 -0.279 212.34 23.97 - - SAFE! 0.000 118.15 118.15 - - SAFE!

3 Min Fz 4.41 -0.051 177.20 132.13 - - SAFE! -0.008 158.20 151.13 - - SAFE!
JO / EWO

4 Max Mx 4.41 -0.205 47.34 12.37 - - SAFE! -0.013 30.97 28.75 - - SAFE!
07/14/2021

5 Min Mx 4.41 -0.051 177.20 132.13 - - SAFE! 0.008 158.20 151.13 - - SAFE!
DATE

6 Max My 4.41 -0.040 172.34 136.99 - - SAFE! -0.008 158.20 151.13 - - SAFE!
REV
NO.

7 Min My 4.41 -0.051 177.20 132.13 - - SAFE! -0.008 158.20 151.13 - - SAFE!
A

DISCIPLINE 8 Max Mz 4.41 -0.051 177.20 132.13 - - SAFE! 0.008 158.20 151.13 - - SAFE!
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 9 Min Mz 4.41 -0.073 131.29 85.97 - - SAFE! 0.000 108.63 108.63 - - SAFE!

PROJECT 10 0.00 4.41 -0.073 131.29 85.97 - - SAFE! 0.000 108.63 108.63 - - SAFE!
ENGINEER
____________
DATE: ___________ 11 0.00 4.41 0.237 143.25 27.58 - - SAFE! 0.000 85.41 85.41 - - SAFE!

12 0.00 4.41 -0.280 211.67 23.52 - - SAFE! 0.000 117.59 117.59 - - SAFE!
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021

CONSTRUCTION
AGENCY
FIRAS MOUSA
DATE: ___________

OPERATIONS
_____________
DATE: ___________
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

BY DRAWING COMPLETION CERTIFICATE (DCC)


APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 29 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

STRENGTH CHECK
ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

GEOMETRY AND PARAMETERS

cc = 75 mm concrete cover dX = 455 mm effective depth along x-dir


DESCRIPTION

f'c = 28 MPa concrete compressive strength dY = 455 mm effective depth along y-dir

fy = 414 MPa reinforcing steel yeild strength d = 455 mm least effective depth

ø = 0.9 moment reduction factor ρMAX = 0.0218

ø = 0.75 shear reduction factor


JO / EWO

07/14/2021

ULTIMATE REACTIONS
DATE

FUX FUY FUZ MUX MUZ


CONDITION LOAD COMBINATION
(kN) (kN) (kN) (kN-m) (kN-m)
REV
NO.

DISCIPLINE 1 Max Fx ULC - 1.2D + L + Exb 40.00 558.72 0.00 0.00 60.03
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 2 Min Fx ULC - 0.9D + Exa 54.00 381.54 0.00 0.00 -81.04

PROJECT 3 Max Fy ULC - 1.2D + L + Eyb 5.00 788.72 15.00 22.52 -7.50
ENGINEER
____________
DATE: ___________ 4 Min Fy ULC - 1.2D + L + Eya 9.00 29.31 5.00 7.51 -7.50

5 Max Fz ULC - 1.2D + L + Eya 5.00 788.72 15.00 -22.52 -7.50


CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
6 Min Fz ULC - 0.9D + Eyc 9.00 788.72 15.00 22.52 -7.50

CONSTRUCTION 7 Max Mx ULC - 1.2D + L + Eya 5.00 788.72 15.00 22.52 -7.50
AGENCY
FIRAS MOUSA
DATE: ___________ 8 Min Mx ULC - 1.2D + L + Eyb 5.00 788.72 15.00 -22.52 -7.50

OPERATIONS 9 Max My ULC - 1.2D + L + Exb 14.00 500.17 0.00 0.00 -21.01

_____________
DATE: ___________
OPERATIONS
_____________
DATE: ___________ 10 Min My ULC - 0.9D + Exa 14.00 500.17 0.00 0.00 -21.01

11 Max Mz ULC - 1.4D 40.00 555.75 0.00 0.00 60.04


______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

12 Min Mz ULC - 1.4D 54.00 379.31 0.00 0.00 -81.06


BY DRAWING COMPLETION CERTIFICATE (DCC)
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 30 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

TABULATED MAXIMUM BASE PRESSURE


ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

ULTIMATE BASE PRESSURE

CONDITION
eX' qUmax X eZ' qUmax Z
(m) (kPa) (m) (kPa)
DESCRIPTION

1 Max Fx 0.206 262.68 0.000 165.36

2 Min Fx 0.054 144.49 0.000 125.18

3 Max Fy 0.003 219.38 0.058 253.56


JO / EWO

4 Min Fy 0.069 54.24 0.116 60.33


07/14/2021

5 Max Fz 0.003 219.38 0.008 222.48


DATE

6 Min Fz 0.012 224.97 0.058 253.56


REV
NO.

7 Max Mx 0.003 219.38 0.058 253.56


A

DISCIPLINE 8 Min Mx 0.003 219.38 0.008 222.48


ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 9 Max My 0.011 156.86 0.000 152.08

PROJECT 10 Min My 0.011 156.86 0.000 152.08


ENGINEER
____________
DATE: ___________ 11 Max Mz 0.207 262.08 0.000 164.68

12 Min Mz 0.054 143.91 0.000 124.67


CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021

CONSTRUCTION CHECK FOR PUNCHING SHEAR


AGENCY
FIRAS MOUSA
DATE: ___________ VU = qU(LX LZ - (lX + d/2)(lZ + d/2)) = 722.92 kN ultimate punching shear
OPERATIONS øVc = 0.75 Vc = 2896.28 kN punching shear capacity
_____________
DATE: ___________ øVc > VUP SAFE!
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

BY DRAWING COMPLETION CERTIFICATE (DCC)


APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 31 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

CHECK FOR WIDE BEAM SHEAR


ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

X- Direction (at a dist."dX" from face) Z-Direction (at a dist."dZ" from face)

VUWX = qU [ ( LX / 2 + eX ) - dX ] LZ VUWZ = qU [ ( LZ / 2 + eZ ) - dZ ] LX
DESCRIPTION

= 355.8 kN = 355.8 kN

øVcx = ø 0.17 ( f'c )½ LZ dX / 1000 øVcz = ø 0.17 ( f'c )½ LX dZ / 1000

= 573.8 kN > VUX SAFE! = 573.8 kN > VUZ SAFE!


JO / EWO

CHECK FOR MINIMUM SHRINKAGE AND TEMPERATURE REQUIREMENT


07/14/2021

Along X- Direction Along Z- Direction


DATE

Astx = 0.0020 LZ T / 2 Astz = 0.0020 LX T / 2


REV
NO.

Astx = 1050 mm2 Astz = 1050 mm2


A

DISCIPLINE
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 provided, 12mm @ 150mm O.C. provided, 12mm @ 150mm O.C.

PROJECT Astxact = 1583 mm2 > Astx SAFE! Astzact = 1583 mm2 > Asty SAFE!
ENGINEER
____________
DATE: ___________

CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021

CONSTRUCTION
AGENCY
FIRAS MOUSA
DATE: ___________
CONSTRUCTION
AGENCY
FIRAS MOUSA
DATE: ___________

OPERATIONS

_____________
DATE: ___________
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

BY DRAWING COMPLETION CERTIFICATE (DCC)


APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 32 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

CHECK FOR MAIN REINFORCEMENT


ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

MUXdes = qU LZ LX2 / 2 MUZdes = qU LX LZ2 / 2

MUXdes = 437.88 kN.m ultimate design moment MUZdes = 328.03 kN.m ultimate design moment
DESCRIPTION

MUXdes = ø f'c LX d² ω ( 1 - 0.59 ω ) MUZdes = ø f'c LZ d² ω ( 1 - 0.59 ω )

ω = 0.052 ω = 0.0387

ρ = ω f'c / fy ρ = ω f'c / fy
JO / EWO

ρ = 0.004 ρ = 0.0026
07/14/2021
DATE

ρMIN = 0.002 ρMIN = 0.002


REV
NO.

DISCIPLINE therefore use, therefore use,


ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 ρ = 0.004 < ρMAX SAFE! ρ = 0.003 < ρMAX SAFE!

PROJECT Asx = ρ LZ d Asz = ρ LX d


ENGINEER
____________
DATE: ___________ = 2977 mm2 = 2211 mm2

CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
20mm @ 150mm O.C. 20mm @ 150mm O.C.
CONSTRUCTION AsXact = 4398 mm2 > Asx SAFE! AsZact = 4398 mm2 > Asz SAFE!
AGENCY
FIRAS MOUSA
DATE: ___________

OPERATIONS

_____________
DATE: ___________
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

BY DRAWING COMPLETION CERTIFICATE (DCC)


APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 33 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

ground slab
(if any)
ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

Footing Name : F3
t

FOOTING GEOMETRY DW
h
SD
GWT
DESCRIPTION

D
LX = 2.0 m footing width along x-axis
T

LZ = 2.0 m footing width along z-axis


y LX
T = 0.45 m footing thickness
x
SD = 1.05 m soil depth
JO / EWO

D = 1.5 m depth of foundation

lZ
DW
07/14/2021

= 3 m depth of water table eZ


DATE

LZ

lX = 0.9 m pedestal width along x-axis z eX


REV
NO.

lZ = 0.7 m pedestal width along z-axis x


A

lX
DISCIPLINE h = 1.5 m pedestal height
ENGINEER LX
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 t = 0 mm ground slab thickness (assumed)

PROJECT eX = 0 m distance along x axis from the centroid of footing to centroid of pedestal
ENGINEER
____________
DATE: ___________ eZ = 0 m distance along z axis from the centroid of footing to centroid of pedestal

CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
CONSTANTS AND ALLOWABLE LIMITS

CONSTRUCTION gS = 18.22 kN/m3 unit weight of soil


AGENCY
FIRAS MOUSA
DATE: ___________ gW = 9.81 kN/m3 unit weight of water

OPERATIONS gC = 24 kN/m3 unit weight of concrete


_____________
DATE: ___________ qap = 300 kN/m2 allow. base pressure

qat = 150 kN/m2 allow. base pressure (temporary condtion)


______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

SFU = 1.2 min. safety factor against uplift

SFS = 1.5 ` min. safety factor against sliding

SFO = 1.5 min. safety factor against overturning


BY DRAWING COMPLETION CERTIFICATE (DCC)
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A

m = 0.4 coefficient of friction


REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 34 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

FOUNDATION WEIGHT
ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

WS = 72.87 kN imposed soil weight

WF = 63.89 kN footing weight


DESCRIPTION

WT = 136.8 kN total weight

SERVICE REACTIONS

GLOBAL REACTIONS (kN, kN-m)


JO / EWO

CONDITION LOAD COMBINATION


FX FY FZ MX MZ
07/14/2021

1 Max Fx SLC - 0.6D + 0.7Exb 25.50 256.36 0.00 0.00 38.27


DATE

2 Min Fx SLC - D + 0.7Exa -41.50 399.27 0.00 0.00 -62.28


REV
NO.

3 Max Fy SLC - D + 0.7Eyb -10.00 560.27 -10.50 15.76 -15.01


A

DISCIPLINE 4 Min Fy SLC - D + 0.7Eya -6.00 9.88 -3.50 5.25 -15.01


ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 5 Max Fz SLC - D + 0.7Eya -10.00 560.27 10.50 -15.76 -15.01

PROJECT 6 Min Fz SLC - 0.6D + 0.7Eyc -6.00 560.27 -10.50 15.76 -15.01
ENGINEER
____________
DATE: ___________ 7 Max Mx SLC - D + 0.7Eya -10.00 560.27 -10.50 15.76 -15.01
CERTIFIED
8 Min Mx SLC - D + 0.7Eyb -10.00 560.27 10.50 -15.76 -15.01
ABDULBASIT KHAN
DATE: 07/14/2021
9 Max My SLC - 0.6D + 0.7Exb -10.00 357.27 0.00 0.00 -15.01

CONSTRUCTION 10 Min My SLC - D + 0.7Exa -10.00 357.27 0.00 0.00 -15.01


AGENCY
FIRAS MOUSA
DATE: ___________ 11 Max Mz SLC - D 25.50 254.88 0.00 0.00 38.28

OPERATIONS 12 Min Mz SLC - D -41.50 396.79 0.00 0.00 -62.30


_____________
DATE: ___________
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

BY DRAWING COMPLETION CERTIFICATE (DCC)


APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 35 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM

FY
CERT

ABK

STABILITY CHECK
FX
base plate level
ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

SLIDING CHECK

FH = ( FX2 + FZ2 )1/2 maximum lateral force H


DESCRIPTION

RY = WT + FY - BF total vertical load

T
FS = mRY / FH factor of safety againts sliding
y

LX
x

UPLIFT CHECK
JO / EWO

UF = min. FY + BF critical uplift force

LX LZ (D - DW) gW
07/14/2021

where: BF =
DATE

FX
MX
note: if D < DW, then no bouyant force, BF
MZ LZ
REV
NO.

FS = (WT + FY) / UF factor of safety againts uplift


A

DISCIPLINE
ENGINEER x
FZ
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 OVERTURNING CHECK

LX
PROJECT OMX = FZ H + M X maximum overturning moment about x-axis
ENGINEER
____________
DATE: ___________
PROJECT
ENGINEER
____________
DATE: ___________ OMZ = FX H + M Z maximum overturning moment about y-axis

CERTIFIED
where: H = T+h
ABDULBASIT KHAN
DATE: 07/14/2021
RMX = (WT + FY - BF) (eZ' + LZ / 2) righting moment about x-axis

CONSTRUCTION RMZ = (WT + FY - BF) (eX' + LX / 2) righting moment about z-axis


AGENCY
FIRAS MOUSA
DATE: ___________ FS = RM / OM factor of safety againts overturning

OPERATIONS

_____________
DATE: ___________ BASE PRESSURE CHECK

e X' = (FX H + MZ) / (WT + FY) + eX eccentricity of load along x-axis from the centroid of footing
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

eZ ' = (FZ H + MX) / (WT + FY) + eZ eccentricity of load along z-axis from the centroid of footing
BY DRAWING COMPLETION CERTIFICATE (DCC)
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 36 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

TABULATED SLIDING AND UPLIFT CHECK


ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

FORCES (kN) SLIDING (kN) UPLIFT (kN)

CONDITION
FX FY FZ WT FH RY FS Evaluation UF FS Evaluation
DESCRIPTION

1 Max Fx 25.50 256.36 0.00 136.76 25.50 364.03 5.71 > 1.50 , SAFE! n.a. n.a. n.a.

2 Min Fx -41.50 399.27 0.00 136.76 41.50 506.94 4.89 > 1.50 , SAFE! n.a. n.a. n.a.

3 Max Fy -10.00 560.27 -10.50 136.76 14.50 667.94 18.43 > 1.50 , SAFE! n.a. n.a. n.a.
JO / EWO

4 Min Fy -6.00 9.88 -3.50 136.76 6.95 117.55 6.77 > 1.50 , SAFE! n.a. n.a. n.a.
07/14/2021

5 Max Fz -10.00 560.27 10.50 136.76 14.50 667.94 18.43 > 1.50 , SAFE! n.a. n.a. n.a.
DATE

6 Min Fz -6.00 560.27 -10.50 136.76 12.09 667.94 22.10 > 1.50 , SAFE! n.a. n.a. n.a.
REV
NO.

7 Max Mx -10.00 560.27 -10.50 136.76 14.50 667.94 18.43 > 1.50 , SAFE! n.a. n.a. n.a.
A

DISCIPLINE 8 Min Mx -10.00 560.27 10.50 136.76 14.50 667.94 18.43 > 1.50 , SAFE! n.a. n.a. n.a.
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 9 Max My -10.00 357.27 0.00 136.76 10.00 464.94 18.60 > 1.50 , SAFE! n.a. n.a. n.a.
PROJECT 10 Min My -10.00 357.27 0.00 136.76 10.00 464.94 18.60 > 1.50 , SAFE! n.a. n.a. n.a.
ENGINEER
____________
DATE: ___________ 11 Max Mz 25.50 254.88 0.00 136.76 25.50 362.55 5.69 > 1.50 , SAFE! n.a. n.a. n.a.

12 Min Mz -41.50 396.79 0.00 136.76 41.50 504.46 4.86 > 1.50 , SAFE! n.a. n.a. n.a.
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021

CONSTRUCTION
AGENCY
FIRAS MOUSA
DATE: ___________

OPERATIONS

_____________
DATE: ___________
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

BY DRAWING COMPLETION CERTIFICATE (DCC)


APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 37 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

TABULATED OVERTURNING CHECK


ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

FORCES (kN) OVERTURNING (m, kN-m)

CONDITION About x-axis About z-axis


FX FY FZ MX MZ WT Evaluation
DESCRIPTION

OMx RMx FS Omz RMz FS

1 Max Fx 25.50 256.36 0.00 0.00 38.27 136.76 0.00 364.03 n.a. 88.00 451.40 5.13 > 1.50 , SAFE!

2 Min Fx -41.50 399.27 0.00 0.00 -62.28 136.76 0.00 506.94 n.a. 18.65 648.88 34.79 > 1.50 , SAFE!

3 Max Fy -10.00 560.27 -10.50 15.76 -15.01 136.76 36.24 674.62 18.62 4.49 701.34 156.2 > 1.50 , SAFE!
JO / EWO

4 Min Fy -6.00 9.88 -3.50 5.25 -15.01 136.76 12.08 118.73 9.83 -3.31 144.59 43.68 > 1.50 , SAFE!
07/14/2021

5 Max Fz -10.00 560.27 10.50 -15.76 -15.01 136.76 4.72 674.62 142.93 4.49 701.34 156.2 > 1.50 , SAFE!
DATE

6 Min Fz -6.00 560.27 -10.50 15.76 -15.01 136.76 36.24 674.62 18.62 -3.31 694.66 209.87 > 1.50 , SAFE!
REV
NO.

7 Max Mx -10.00 560.27 -10.50 15.76 -15.01 136.76 36.24 674.62 18.62 4.49 701.34 156.2 > 1.50 , SAFE!
A

DISCIPLINE 8 Min Mx -10.00 560.27 10.50 -15.76 -15.01 136.76 4.72 674.62 142.93 4.49 701.34 156.2 > 1.50 , SAFE!
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021
DISCIPLINE
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 9 Max My -10.00 357.27 0.00 0.00 -15.01 136.76 0.00 464.94 n.a. 4.49 497.49 110.8 > 1.50 , SAFE!

PROJECT 10 Min My -10.00 357.27 0.00 0.00 -15.01 136.76 0.00 464.94 n.a. 4.49 497.49 110.8 > 1.50 , SAFE!
ENGINEER
____________
DATE: ___________ 11 Max Mz 25.50 254.88 0.00 0.00 38.28 136.76 0.00 362.55 n.a. 88.01 449.56 5.11 > 1.50 , SAFE!

12 Min Mz -41.50 396.79 0.00 0.00 -62.30 136.76 0.00 504.46 n.a. 18.63 645.71 34.66 > 1.50 , SAFE!
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021

CONSTRUCTION
AGENCY
FIRAS MOUSA
DATE: ___________

OPERATIONS

_____________
DATE: ___________
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

BY DRAWING COMPLETION CERTIFICATE (DCC)


APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 38 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

TABULATED BASEPRESSURE CHECK


ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

BASE PRESSURE

CONDITION
A eX' qUmax X qUmin X MZ MRZ eZ' qUmax Z qUmin Z MX MRX
Evaluation Evaluation
(m2) (m) (kPa) (kPa) (kN-m) (kN-m) (m) (kPa) (kPa) (kN-m) (kN-m)
DESCRIPTION

1 Min Fy 4.00 0.242 157.08 24.94 - - SAFE! 0.000 91.01 91.01 - - SAFE!

2 Max Fz 4.00 -0.282 233.95 19.52 - - SAFE! 0.000 126.74 126.74 - - SAFE!

3 Min Fz 4.00 -0.052 193.03 140.94 - - SAFE! -0.007 170.49 163.48 - - SAFE!
JO / EWO

4 Max Mx 4.00 -0.227 49.40 9.37 - - SAFE! -0.013 30.53 28.24 - - SAFE!
07/14/2021

5 Min Mx 4.00 -0.052 193.03 140.94 - - SAFE! 0.007 170.49 163.48 - - SAFE!
DATE

6 Max My 4.00 -0.040 187.02 146.95 - - SAFE! -0.007 170.49 163.48 - - SAFE!
REV
NO.

7 Min My 4.00 -0.052 193.03 140.94 - - SAFE! -0.007 170.49 163.48 - - SAFE!
A
DISCIPLINE 8 Max Mz 4.00 -0.052 193.03 140.94 - - SAFE! 0.007 170.49 163.48 - - SAFE!
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 9 Min Mz 4.00 -0.074 142.04 90.43 - - SAFE! 0.000 116.24 116.24 - - SAFE!

PROJECT 10 0.00 4.00 -0.074 142.04 90.43 - - SAFE! 0.000 116.24 116.24 - - SAFE!
ENGINEER
____________
DATE: ___________ 11 0.00 4.00 0.243 156.71 24.56 - - SAFE! 0.000 90.64 90.64 - - SAFE!

12 0.00 4.00 -0.284 233.56 18.67 - - SAFE! 0.000 126.12 126.12 - - SAFE!
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021

CONSTRUCTION
AGENCY
FIRAS MOUSA
DATE: ___________

OPERATIONS
_____________
DATE: ___________
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

BY DRAWING COMPLETION CERTIFICATE (DCC)


APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 39 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

STRENGTH CHECK
ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

GEOMETRY AND PARAMETERS

cc = 75 mm concrete cover dX = 455 mm effective depth along x-dir


DESCRIPTION

f'c = 28 MPa concrete compressive strength dY = 455 mm effective depth along y-dir

fy = 414 MPa reinforcing steel yeild strength d = 455 mm least effective depth

ø = 0.9 moment reduction factor ρMAX = 0.0218

ø = 0.75 shear reduction factor


JO / EWO

07/14/2021

ULTIMATE REACTIONS
DATE

FUX FUY FUZ MUX MUZ


CONDITION LOAD COMBINATION
(kN) (kN) (kN) (kN-m) (kN-m)
FUX FUY FUZ MUX MUZ
CONDITION LOAD COMBINATION
(kN) (kN) (kN) (kN-m) (kN-m)
REV
NO.

A
DISCIPLINE 1 Max Fx ULC - 1.2D + L + Exb 40.00 558.72 0.00 0.00 60.03
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 2 Min Fx ULC - 0.9D + Exa 54.00 381.54 0.00 0.00 -81.04

PROJECT 3 Max Fy ULC - 1.2D + L + Eyb 5.00 788.72 15.00 22.52 -7.50
ENGINEER
____________
DATE: ___________ 4 Min Fy ULC - 1.2D + L + Eya 9.00 29.31 5.00 7.51 -7.50

5 Max Fz ULC - 1.2D + L + Eya 5.00 788.72 15.00 -22.52 -7.50


CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
6 Min Fz ULC - 0.9D + Eyc 9.00 788.72 15.00 22.52 -7.50

CONSTRUCTION 7 Max Mx ULC - 1.2D + L + Eya 5.00 788.72 15.00 22.52 -7.50
AGENCY
FIRAS MOUSA
DATE: ___________ 8 Min Mx ULC - 1.2D + L + Eyb 5.00 788.72 15.00 -22.52 -7.50

OPERATIONS 9 Max My ULC - 1.2D + L + Exb 14.00 500.17 0.00 0.00 -21.01

_____________
DATE: ___________ 10 Min My ULC - 0.9D + Exa 14.00 500.17 0.00 0.00 -21.01

11 Max Mz ULC - 1.4D 40.00 555.75 0.00 0.00 60.04


______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

12 Min Mz ULC - 1.4D 54.00 379.31 0.00 0.00 -81.06


BY DRAWING COMPLETION CERTIFICATE (DCC)
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 40 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

TABULATED MAXIMUM BASE PRESSURE


ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

ULTIMATE BASE PRESSURE

CONDITION
eX' qUmax X eZ' qUmax Z
(m) (kPa) (m) (kPa)
DESCRIPTION

1 Max Fx 0.207 287.51 0.000 177.36

2 Min Fx 0.050 153.03 0.000 133.07

3 Max Fy 0.003 236.98 0.058 275.73


JO / EWO

4 Min Fy 0.073 54.87 0.126 62.03


07/14/2021

5 Max Fz 0.003 236.98 0.008 240.50


DATE
07/14/2021
DATE

6 Min Fz 0.011 242.62 0.058 275.73


REV
NO.

7 Max Mx 0.003 236.98 0.058 275.73


A

DISCIPLINE 8 Min Mx 0.003 236.98 0.008 240.50


ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 9 Max My 0.010 167.61 0.000 162.73

PROJECT 10 Min My 0.010 167.61 0.000 162.73


ENGINEER
____________
DATE: ___________ 11 Max Mz 0.208 286.83 0.000 176.62

12 Min Mz 0.050 152.39 0.000 132.51


CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021

CONSTRUCTION CHECK FOR PUNCHING SHEAR


AGENCY
FIRAS MOUSA
DATE: ___________ VU = qU(LX LZ - (lX + d/2)(lZ + d/2)) = 769.37 kN ultimate punching shear

OPERATIONS øVc = 0.75 Vc = 1929.15 kN punching shear capacity


_____________
DATE: ___________ øVc > VUP SAFE!
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

BY DRAWING COMPLETION CERTIFICATE (DCC)


APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 41 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

CHECK FOR WIDE BEAM SHEAR


ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

X- Direction (at a dist."dX" from face) Z-Direction (at a dist."dZ" from face)

VUWX = qU [ ( LX / 2 + eX ) - dX ] LZ VUWZ = qU [ ( LZ / 2 + eZ ) - dZ ] LX
DESCRIPTION

= 370.89 kN = 370.89 kN

øVcx = ø 0.17 ( f'c )½ LZ dX / 1000 øVcz = ø 0.17 ( f'c )½ LX dZ / 1000

= 479.01 kN > VUX SAFE! = 479.01 kN > VUZ SAFE!


JO / EWO

CHECK FOR MINIMUM SHRINKAGE AND TEMPERATURE REQUIREMENT


07/14/2021 Along X- Direction Along Z- Direction
DATE

Astx = 0.0020 LZ T / 2 Astz = 0.0020 LX T / 2


REV
NO.

Astx = 900 mm2 Astz = 900 mm2


A

DISCIPLINE
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 provided, 12mm @ 150mm O.C. provided, 12mm @ 150mm O.C.

PROJECT Astxact = 1583 mm2 > Astx SAFE! Astzact = 1583 mm2 > Asty SAFE!
ENGINEER
____________
DATE: ___________

CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021

CONSTRUCTION
AGENCY
FIRAS MOUSA
DATE: ___________

OPERATIONS
_____________
DATE: ___________
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

BY DRAWING COMPLETION CERTIFICATE (DCC)


APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 42 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

CHECK FOR MAIN REINFORCEMENT


ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

MUXdes = qU LZ LX2 / 2 MUZdes = qU LX LZ2 / 2

MUXdes = 420.94 kN.m ultimate design moment MUZdes = 309.81 kN.m ultimate design moment
DESCRIPTION

MUXdes = ø f'c LX d² ω ( 1 - 0.59 ω ) MUZdes = ø f'c LZ d² ω ( 1 - 0.59 ω )

ω = 0.052 ω = 0.0387

ρ = ω f'c / fy ρ = ω f'c / fy
JO / EWO
19-20640-000
JO / EWO

07/14/2021 ρ = 0.005 ρ = 0.0034


DATE

ρMIN = 0.002 ρMIN = 0.002


REV
NO.

DISCIPLINE therefore use, therefore use,


ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 ρ = 0.005 < ρMAX SAFE! ρ = 0.003 < ρMAX SAFE!

PROJECT Asx = ρ LZ d Asz = ρ LX d


ENGINEER
____________
DATE: ___________ = 3337 mm2 = 2414 mm2

CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
20mm @ 150mm O.C. 20mm @ 150mm O.C.

CONSTRUCTION AsXact = 4189 mm2 > Asx SAFE! AsZact = 4189 mm2 > Asz SAFE!
AGENCY
FIRAS MOUSA
DATE: ___________

OPERATIONS
_____________
DATE: ___________
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

BY DRAWING COMPLETION CERTIFICATE (DCC)


APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 43 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

Footing Name : F4
ENGG

ISSUED FOR CONSTRUCTION ABK

FOOTING GEOMETRY

LX = 3.5 m footing width along x-axis


DESCRIPTION

LZ = 3.5 m footing width along z-axis

T = 0.45 m footing thickness

SD = 1.05 m soil depth


19-20640-0002 D = 1.5 m depth of foundation
JO / EWO

DW = 3 m depth of water table

lX
07/14/2021

= 0.9 m pedestal width along x-axis


DATE

lZ = 0.7 m pedestal width along z-axis


REV
NO.

h = 1.5 m pedestal height


A

DISCIPLINE t = 0 mm ground slab thickness (assumed)


ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 eX = 1.4 m distance along x axis from the centroid of footing to centroid of pedestal

PROJECT eZ = -1.3 m distance along z axis from the centroid of footing to centroid of pedestal
ENGINEER
____________
DATE: ___________

CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021

CONSTRUCTION
AGENCY
FIRAS MOUSA
DATE: ___________

OPERATIONS
_____________
DATE: ___________
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

BY DRAWING COMPLETION CERTIFICATE (DCC)


APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 44 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

BASE PRESSURE CHECK


ENGG

ISSUED FOR CONSTRUCTION ABK


DESCRIPTION
DESC

19-20640-0002 ISSUED FOR


JO / EWO

07/14/2021
DATE
REV
NO.

DISCIPLINE
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021

PROJECT
ENGINEER
____________
DATE: ___________

CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021

CONSTRUCTION Allowable Base Pressure = 300 kPa


AGENCY
FIRAS MOUSA
DATE: ___________ Actual Base Pressure = 285.4 kPa

OPERATIONS Results = passed


_____________
DATE: ___________
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

BY DRAWING COMPLETION CERTIFICATE (DCC)


APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 45 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

PUNCHING SHEAR CHECK


ENGG

ISSUED FOR CONSTRUCTION ABK


DESCRIPTION
19-20640-0002 ISSUED FOR CONSTR
DESCRIPTION
JO / EWO

07/14/2021
DATE
REV
NO.

DISCIPLINE
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021

PROJECT
ENGINEER
____________
DATE: ___________

CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021

CONSTRUCTION
AGENCY
FIRAS MOUSA
DATE: ___________

OPERATIONS
_____________
DATE: ___________
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

BY DRAWING COMPLETION CERTIFICATE (DCC)


APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 46 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

FLEXURAL REINFORCEMENT REQUIRED


ENGG

ED FOR CONSTRUCTION ABK


DESCRIPTION
19-20640-0002 ISSUED FOR CONSTRUCTIO
DESCRIPTION
JO / EWO

07/14/2021
DATE
REV
NO.

DISCIPLINE
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021

PROJECT
ENGINEER
____________
DATE: ___________

CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021

CONSTRUCTION Reinforcement provided along Layer A


AGENCY
FIRAS MOUSA
DATE: ___________ Top Bars = 12mmØ @ 150mm O.C.

OPERATIONS Bottom Bars = 20mmØ @ 150mm O.C.


_____________
DATE: ___________
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

BY DRAWING COMPLETION CERTIFICATE (DCC)


APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 47 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

FLEXURAL REINFORCEMENT REQUIRED


ENGG

ABK
19-20640-0002 ISSUED FOR CONSTRUCTION
DESCRIPTION
JO / EWO

07/14/2021
DATE
REV
NO.

DISCIPLINE
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021

PROJECT
ENGINEER
____________
DATE: ___________

CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021

CONSTRUCTION Reinforcement provided along Layer B


AGENCY
FIRAS MOUSA
DATE: ___________ Top Bars = 12mmØ @ 150mm O.C.

OPERATIONS Bottom Bars = 20mmØ @ 150mm O.C.


_____________
DATE: ___________
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

BY DRAWING COMPLETION CERTIFICATE (DCC)


APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 48 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM

2.5 GRADE BEAM DESIGN


CERT

ABK

Perimeter Wall Loads


ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK Perimeter Wall Load calculation

h = 4.00 m height of wall


DESCRIPTION

γCMU = 2.25 kPa unit weight of cmu

wCMU = 9.00 kN/m line load due to cmu

lbeam = 8.20 m beam length


JO / EWO

Beam Design
07/14/2021

MU,SUPPORT = 63.88 kN.m ultimate moment at support


DATE

MU,MIDSPAN = 44.71 kN.m ultimate moment at midspan


REV
NO.

VU = 65.44 kN ultimate shear


A

DISCIPLINE TU = 0.00 kN.m ultimate torsional moment


ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 fc ' = 28 MPa concrete strength

PROJECT fy = 414 MPa rebar yield strength


ENGINEER
____________
DATE: ___________ b = 200 mm beam width

D = 500 mm beam depth


CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
Es = 200000 MPa young's modulus of steel

CONSTRUCTION Strength Check


AGENCY
FIRAS MOUSA
DATE: ___________ at support

OPERATIONS MU,SUPPORT = Ø fc' bd2 w (1-0.59w)


_____________
DATE: ___________ w = 0.0616

ρ = w fc' / fy = 0.00
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

β = 0.85 if fc' < 30 Mpa = 0.85

0.85-0.008(fc' - 30)if fc' > 30MPa

ρb (0.85 fc'
= β 600) / (fy (600 + fy) = 0.03
BY DRAWING COMPLETION CERTIFICATE (DCC)
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A

ρmin = 1.4 / fy = 0.00


REVISION CERTIFICATE

ρmax = 0.75 ρb = 0.02 > reinforce


ρ for tension only

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 49 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK
AS = ρbd = 385.08 mm2 required area of steel
ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

a = AS fy / (0.85 fc' b) = 33.492 mm

c = a/β = 39.403 mm
DESCRIPTION

εy = fy / Es = 0.0021

εs = 0.003 (d-c) / c = 0.03

εs > εy tension steel yields


JO / EWO

07/14/2021

ATOTAL = 628.32 mm2 ok


DATE

at midspan
REV
NO.

MU,MIDSPAN = Ø fc' bd2 w (1-0.59w)


A

DISCIPLINE w = 0.04
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 ρ = w fc' / fy = 0.0029

PROJECT β = 0.85 if fc' < 30 Mpa = 0.85


ENGINEER
____________
DATE: ___________ 0.85-0.008(fc' - 30)if fc' >30MPa

ρb = (0.85 fc' β 600) / (fy (600 + fy) = 0.0289


CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
ρmin = 1.4 / fy = 0.00

CONSTRUCTION ρmax = 0.75 ρb = 0.022 > ρ reinforce for tension only


AGENCY
FIRAS MOUSA
DATE: ___________ AS = ρbd = 312.46 mm2 required area of steel

OPERATIONS a = AS fy / (0.85 fc' b) = 27.176 mm


_____________
DATE: ___________ c = a/β = 31.972 mm

εy = fy / Es = 0.00
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

εs = 0.003 (d-c) / c = 0.04

εs > εy tension steel yields


BY DRAWING COMPLETION CERTIFICATE (DCC)
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A

ATOTAL = 628.32 mm2 ok


REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 50 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
OPRNS

SAUDI ARABIAN OIL COMPANY


PMT

FM
CERT

ABK

Web Reinforcement
ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

VCA = (0.16 √fC' + 17 ρw Vu d / Mu) b = 81328 N

VCB = (0.16 √fC' + 17 ρw ) b d = 83541 N


DESCRIPTION

VCC = 0.29 √fC' b d = 1E+05 N

VC = 81.33 kN section shear capacity

Ø (VC + 0.66 √fC' b d) 3E+05 > VU cross-section is good


JO / EWO

07/14/2021

check if stirups is required:


DATE

(Ø VC) / 2 = 30.50 kN
REV
NO.

VU > (Ø VC) / 2 stirrups required


A

DISCIPLINE
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 VS = (VU - ØVC) / Ø = 5.92 kN

PROJECT AV = 10 = 157.08 mm2 stirrups provided


ENGINEER
____________
DATE: ___________ Spacing of stirrups

S = Av fy d / Vs = 5,075 mm
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021

CONSTRUCTION Maximum spacing of stirrups


AGENCY
FIRAS MOUSA
DATE: ___________ Vc = 1/3 fC' 0.5 b d = 163 kN

OPERATIONS VS < 1/3 fC' 0.5 b d


_____________
DATE: ___________

S = 231 mm 200 mm
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

Distance where stirrups is required = 924 mm. from ends to center


BY DRAWING COMPLETION CERTIFICATE (DCC)
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 51 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

FM
SAUDI ARABIAN OIL COMPANY
CERT

ABK

Torsional Reinforcement
ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

Acp = bD = 0.1 m2 area enclosed by outside perimeter of section


DESCRIPTION

Aoh = (b - cc - tieØ / 2) (D - cc - tieØ / 2) = 0.0687 m2 area enclosed by centerline of closed tie

Ao = 0.85 Aoh = 0.0584 m2 gross area enclosed by torsional flow path

Pcp = 2 (b + D) = 1.4 m outside perimeter of concrete cross section

Ph = 2 ((b - cc - tieØ / 2) + (D - cc - tieØ / 2)) = 0.756 m perimeter of centerline of outermost closed torsional reinf.
JO / EWO

ØTcr = Ø 0.33 √ fC' (Acp2 / Pcp) = 9.3546 kN.m > TU no need to design for torsion
07/14/2021

ØTth = Ø 0.083 √ fC' (Acp2 / Pcp) = 2.3528 kN.m > TU


DATE

Tn = TU / Ø = 0 kN.m nominal torsional moment


REV
NO.

DISCIPLINE fv = VU / b d = 708.18 kPa


ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 fvt = TU Ph / 1.7 Aoh2 = 0 kPa

PROJECT
ENGINEER
____________
DATE: ___________ L1 = VC / b d = 0.8802 MPa

L2 = 0.66 √ fC' = 3.4924 MPa


CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021

CONSTRUCTION √ (fv2 + fvt2) = = 708.18 kPa


AGENCY
FIRAS MOUSA
DATE: ___________ Ø (L1+L2) = = 3279 kPa

OPERATIONS

_____________
DATE: ___________ √ (fv2 + fvt2) < Ø (L1+L2) ok, therefore section is large enough
______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

BY DRAWING COMPLETION CERTIFICATE (DCC)


APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 52 OF 53 A
T

APPRO
OF T

N
BY DRA
52 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS

SAUDI ARABIAN OIL COMPANY


FM
CERT

ABK

Torsional Tie area / spacing


ENGG

19-20640-0002 ISSUED FOR CONSTRUCTION ABK

Ta = Av / s + 2 At / s = 0.0216 mm2 / mm torsional tie area

S = 2 As / (Av / s + 2 At / s) = 7276 mm torsional tie spacing


DESCRIPTION

Smax = min (Ph / 8, 300) = 90 mm minimum torsional tie spacing

use S = = mm spacing provided

Torsional longitudinal reinforcement

Al = At / s Ph (fyt / fy) cot2 Ø = torsional


mm2longitudinal reinforcement
JO / EWO

Al,min1 = 0.42 √ fC' Acp / fyt - At / s Ph fyt / fy minimum


= 536.82
torsional
mm2 longitudinal reinforcement 1
07/14/2021

Al,min2 = 0.42 √ fC' Acp / fyt - 0.175 b / fyt Ph fyt / fy = 472.91 mm2
DATE

use Al,min = = 0.00 mm2 minimum


minimum torsional longitudinal reinforcement 2
REV
NO.

DISCIPLINE Summary of Reinforcement Required


ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 Longitudinal

PROJECT Top bars (@ supports) Bottom bars (@ supports)


ENGINEER
____________
DATE: ___________ Use 3 20 mm Ø bar ; Use 3 20 mm Ø bar

ATOTAL = 942 mm2 ATOTAL = 942 mm2


CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
Top bars (@ midspan) ; Bottom bars (@ midspan)

CONSTRUCTION Use 3 20 mm Ø bar Use 3 20 mm Ø bar


AGENCY
FIRAS MOUSA
DATE: ___________ ATOTAL = 942 mm2 ATOTAL = 942 mm2

OPERATIONS

_____________
DATE: ___________ Web Reinforcement

Min. Spacing = 200 mm 10 mm Ø bar


______________

DATE:_________
Control Number
By:__________
VERIFICATION
EDSD

Max. Spacing = 200 mm 10 mm Ø bar

Side Bars

Use 0 0 mm Ø bar in each side


BY DRAWING COMPLETION CERTIFICATE (DCC)
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

NO._________________________
THIS INDICATES THAT REV. NO. A

ATOTAL = 0 mm2 no need to design for torsion


REVISION CERTIFICATE

OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
BY DRAWING COM
OF THIS DRAWI

NO._______
REVISI

APPROVAL/CERTI
THIS INDIC
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 53 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
STEEL COLUMN

∇ TOP OF BASE PLATE


Fx

Z
Fz

REACTION
-Fz

-Fx TOP OF BASE PLATE ∇

TOP OF FOOTING ∇
Z
(CRITICAL SECTION FOR
Mu PEDESTAL)
X

TRANSFER FORCES