Professional Documents
Culture Documents
PMT OPRNS
ABK
ENGG
OFFICE BUILDING
STRUCTURAL CALCULATION
07/14/2021
DATE
OF FOUNDATION
REV
NO.
DISCIPLINE
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021
PROJECT
ENGINEER
____________
DATE: ___________ DHAHRAN POD BUILDING 3098 NEW EXPANSION & NEW WAREHOUSE
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
CONSTRUCTION
AGENCY
FIRAS MOUSA
DATE: ___________
OPERATIONS
_____________
DATE: ___________
______________
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
1 OF 53 A
APPROVAL/C
NO.___
BY DRAWING
R
OF THIS D
THIS I
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 1 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
Table of Contents
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
ENGG
1 DESIGN BASIS
1.1 General
DESCRIPTION
CERTIFIED
2.3 Pedestal Design
ABDULBASIT KHAN
DATE: 07/14/2021
2.4 Foundation Design
OPERATIONS
_____________
DATE: ___________
______________
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
2 OF 53 A
APPROVAL/C
NO.___
BY DRAWING
R
OF THIS D
THIS I
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 2 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
1 DESIGN BASIS
ENGG
1.1 General
The objective of this document is to establish the engineering requirements of structural adequacy and serviceability of
the foundation. This Design Calculation Report covers the Analysis & Design of its foundation as described in subsequent
DESCRIPTION
This calculation shows analysis & design of pedestals and foundations of an office building. In analysis & design, the
JO / EWO
requirements of the Saudi Building Code and Saudi Aramco Standards are used. The reactions from the Steel Design are
utilized including the gravity and lateral loads imposed imposed on the structure
07/14/2021
DATE
DISCIPLINE
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 1.4 Design Criteria
CERTIFIED
SBC 303 2018 Saudi Soils and Foundation Code
ABDULBASIT KHAN
DATE: 07/14/2021
SBC 304 2018 Saudi Concrete Structures Code
OPERATIONS SAES – Q– 001 Criteria for Design and Construction of Concrete Structure
_____________
DATE: ___________ SAES – Q– 005 Concrete Foundation
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
BY DRAWING COMPLET
NO.___________
REVISION C
OF THIS DRAWING I
APPROVAL/CERTIFICA
THIS INDICATES
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 3 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
For details of Soil Bearing Capacity, please refer to Geotechnical File No. 2021/01
07/14/2021
DATE
CERTIFIED
1.4.5 Design Loads & Assumptions
ABDULBASIT KHAN
DATE: 07/14/2021
A. Dead Load
CONSTRUCTION Dead loads consist of the weight of all materials of construction incorporated into the building including but not limited to
AGENCY
FIRAS MOUSA walls, floors, roofs, ceilings, stairways, built-in partitions, finishes, cladding and other similarly architectural and structural
DATE: ___________ items, and fixed service equipment which was considered in the design of the Steel Structure.
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
NO.__________________
BY DRAWING COMPLETION CER
OF THIS DRAWING IS COVER
THIS INDICATES THAT RE
REVISION CERTIFIC
APPROVAL/CERTIFICATION RE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 4 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
qZ = 0.613 KZ KZt Kd V2
07/14/2021
SS = 0.082
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
S1 = 0.028
CONSTRUCTION Function of site class and mapped period maximum considered Earthquake Spectral Acceleration :
AGENCY
FIRAS MOUSA
DATE: ___________ Fa = 1.6
OPERATIONS Fv = 2.4
_____________
DATE: ___________ Site Coefficients and Adjusted Maximum Considered Earthquake Spectral Response Acceleration :
SMS = Fa SS = 0.1312
______________
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
SM1 = Fv S1 = 0.0672
______________________
DICATES THAT REV. NO. A
APPROVAL/CERTIFICATION REQUIREM
OF THIS DRAWING IS COVERED, FOR
NO.________________________
BY DRAWING COMPLETION CERTIFICAT
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 5 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
1. D
DATE
2. D+L
REV
NO.
3. D + 0.6W
A
DISCIPLINE 4. D + 0.7E
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 5. 0.6D + 0.6W
CERTIFIED
1. 1.4D
ABDULBASIT KHAN
DATE: 07/14/2021
2. 1.2D + 1.6L
CONSTRUCTION 3. 1.2D + W + L
AGENCY
FIRAS MOUSA
DATE: ___________ 4. 1.2D + E + L
OPERATIONS 5. 0.9D + W
_____________
DATE: ___________ 6. 0.9D + E
______________
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
_______________
THAT REV. NO. A
CERTIFICATE
BY DRAWING COMPLETION CERTIFICATE (DCC)
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 6 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
No. Load Case V (kN) H (kN) No. Load Case V (kN) H (kN)
DESCRIPTION
CERTIFIED
3 1.2D + L + W(+x) 422.00 -20.00 17 1.2D + L + Eyc 182.00 10.00
ABDULBASIT KHAN
DATE: 07/14/2021
4 1.2D + L + W(-x) 497.00 30.00 18 1.2D + L + Eyd 182.00 0.00
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 7 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
Pedestal Name : P1
Units : Metric
STEEL COLUMN
07/14/2021
Fz Fy x H Fx x H
A
CONSTRUCTION
AGENCY TOP OF FOOTING ∇
FIRAS MOUSA Z
DATE: ___________ (CRITICAL SECTION FOR
Mu PEDESTAL)
X
OPERATIONS
_____________ TRANSFER FORCES
DATE: ___________
______________
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
By:______
Control Nu
_________
DATE:____
VERIFICA
EDS
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 8 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
Pedestal Dimensions
DISCIPLINE
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 Transverse Longitudinal b = 20 mm Ø
PROJECT 1- 10 mm Ø hoops
ENGINEER
____________
DATE: ___________ 1- 10 mm Ø x - tie
2- 10 mm Ø y - tie
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
______________
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 9 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
SHEAR DESIGN:
ENGG
at X-direction ( Vu = 54 kN )
øVc = 0.75 ( 0.17 ) ( 1 + Pu 1000 / 14 Ag ) l (f'c)1/2 h dx / 1000 = 408.05 kN (Sec. 22.5.6.1, SBC 304)
DESCRIPTION
DISCIPLINE
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 at Y-direction ( Vu = 24 kN )
PROJECT øVc = 0.75 ( 0.17 ) ( 1 + Pu 1000 / 14 Ag ) l (f'c)1/2 b dz / 1000 = 408.19 kN (Sec. 22.5.6.1, SBC 304)
ENGINEER
____________
DATE: ___________ Shear carried by steel,Vs = (Vu - øVc) / 0.75 = na kN
CERTIFIED
Required Spacing, Sreq'd. = Av fys dz / Vs = na mm
ABDULBASIT KHAN
DATE: 07/14/2021
Max. Allow. Spacing of ties/hoops ; (Sec. 25.7.2, SBC 304)
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 10 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
ENGG
Pedestal Name : P2
Units : Metric
STEEL COLUMN
07/14/2021
Fz Fy x H Fx x H
A
CONSTRUCTION
AGENCY TOP OF FOOTING ∇
FIRAS MOUSA Z
DATE: ___________ (CRITICAL SECTION FOR
Mu PEDESTAL)
X
OPERATIONS
_____________ TRANSFER FORCES
DATE: ___________
OPERATIONS
_____________ TRANSFER FORCES
DATE: ___________
______________
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 11 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
Pedestal Dimensions
DISCIPLINE
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 Transverse Longitudinal b = 20 mm Ø
PROJECT 1- 10 mm Ø hoops
ENGINEER
____________
DATE: ___________ 1- 10 mm Ø x - tie
2- 10 mm Ø y - tie
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 12 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
SHEAR DESIGN:
ENGG
at X-direction ( Vu = 54 kN )
øVc = 0.75 ( 0.17 ) ( 1 + Pu 1000 / 14 Ag ) l (f'c)1/2 h dx / 1000 = 360.65 kN (Sec. 22.5.6.1, SBC 304)
DESCRIPTION
DISCIPLINE
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 at Y-direction ( Vu = 24 kN )
PROJECT øVc = 0.75 ( 0.17 ) ( 1 + Pu 1000 / 14 Ag ) l (f'c)1/2 b dz / 1000 = 365.69 kN (Sec. 22.5.6.1, SBC 304)
ENGINEER
____________
DATE: ___________ Shear carried by steel,Vs = (Vu - øVc) / 0.75 = na kN
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 13 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
Footing Name : F1
t
FOOTING GEOMETRY DW
h
SD
GWT
DESCRIPTION
D
LX = 2.2 m footing width along x-axis
T
lZ
DW
07/14/2021
LZ
lX
DISCIPLINE h = 0 m column height
ENGINEER LX
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 t = 0 mm ground slab thickness (assumed)
PROJECT eX = 0 m distance along x axis from the centroid of footing to centroid of pedestal
ENGINEER
____________
DATE: ___________ eZ = 0 m distance along z axis from the centroid of footing to centroid of pedestal
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
CONSTANTS AND ALLOWABLE LIMITS
CONSTRUCTION gS = 18.22 kN/m3 unit weight of soil
AGENCY
FIRAS MOUSA
DATE: ___________ gW = 9.81 kN/m3 unit weight of water
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 14 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
FOUNDATION WEIGHT
ENGG
SERVICE REACTIONS
PROJECT 6 Min Fz SLC - 0.6D + 0.7Eyc -6.00 560.27 -10.50 15.76 -15.01
ENGINEER
____________
DATE: ___________ 7 Max Mx SLC - D + 0.7Eya -10.00 560.27 -10.50 15.76 -15.01
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 15 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
FY
CERT
ABK
STABILITY CHECK
FX
base plate level
ENGG
SLIDING CHECK
T
FS = mRY / FH factor of safety againts sliding
y
LX
x
UPLIFT CHECK
JO / EWO
LX LZ (D - DW) gW
07/14/2021
where: BF =
DATE
FX
MX
note: if D < DW, then no bouyant force, BF
MZ LZ
REV
NO.
DISCIPLINE
ENGINEER x
FZ
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 OVERTURNING CHECK
LX
PROJECT OMX = FZ H + M X maximum overturning moment about x-axis
ENGINEER
____________
DATE: ___________ OMZ = FX H + M Z maximum overturning moment about y-axis
CERTIFIED
where: H = T+h
ABDULBASIT KHAN
DATE: 07/14/2021
RMX = (WT + FY - BF) (eZ' + LZ / 2) righting moment about x-axis
OPERATIONS
_____________
DATE: ___________ BASE PRESSURE CHECK
e X' = (FX H + MZ) / (WT + FY) + eX eccentricity of load along x-axis from the centroid of footing
______________
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
eZ ' = (FZ H + MX) / (WT + FY) + eZ eccentricity of load along z-axis from the centroid of footing
BY DRAWING COMPLETION CERTIFICATE (DCC)
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
16 OF 53 A
APPROVAL/C
NO.___
BY DRAWING
R
OF THIS D
THIS I
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 16 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
CONDITION
FX FY FZ WT FH RY FS Evaluation UF FS Evaluation
DESCRIPTION
1 Max Fx 25.50 256.36 0.00 136.76 25.50 393.12 6.17 > 1.50 , SAFE! n.a. n.a. n.a.
2 Min Fx -41.50 399.27 0.00 136.76 41.50 536.03 5.17 > 1.50 , SAFE! n.a. n.a. n.a.
3 Max Fy -10.00 560.27 -10.50 136.76 14.50 697.03 19.23 > 1.50 , SAFE! n.a. n.a. n.a.
JO / EWO
4 Min Fy -6.00 9.88 -3.50 136.76 6.95 146.64 8.44 > 1.50 , SAFE! n.a. n.a. n.a.
07/14/2021
5 Max Fz -10.00 560.27 10.50 136.76 14.50 697.03 19.23 > 1.50 , SAFE! n.a. n.a. n.a.
DATE
6 Min Fz -6.00 560.27 -10.50 136.76 12.09 697.03 23.06 > 1.50 , SAFE! n.a. n.a. n.a.
REV
NO.
7 Max Mx -10.00 560.27 -10.50 136.76 14.50 697.03 19.23 > 1.50 , SAFE! n.a. n.a. n.a.
A
DISCIPLINE 8 Min Mx -10.00 560.27 10.50 136.76 14.50 697.03 19.23 > 1.50 , SAFE! n.a. n.a. n.a.
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 9 Max My -10.00 357.27 0.00 136.76 10.00 494.03 19.76 > 1.50 , SAFE! n.a. n.a. n.a.
PROJECT 10 Min My -10.00 357.27 0.00 136.76 10.00 494.03 19.76 > 1.50 , SAFE! n.a. n.a. n.a.
ENGINEER
____________
DATE: ___________ 11 Max Mz 25.50 254.88 0.00 136.76 25.50 391.64 6.14 > 1.50 , SAFE! n.a. n.a. n.a.
12 Min Mz -41.50 396.79 0.00 136.76 41.50 533.55 5.14 > 1.50 , SAFE! n.a. n.a. n.a.
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
CONSTRUCTION
AGENCY
FIRAS MOUSA
DATE: ___________
OPERATIONS
_____________
DATE: ___________
______________
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
17 OF 53 A
APPROVAL/C
NO.___
BY DRAWING
R
OF THIS D
THIS I
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 17 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
1 Max Fx 25.50 256.36 0.00 0.00 38.27 136.76 0.00 432.43 n.a. 52.30 483.54 9.25 > 1.50 , SAFE!
2 Min Fx -41.50 399.27 0.00 0.00 -62.28 136.76 0.00 589.63 n.a. -39.46 675.40 17.12 > 1.50 , SAFE!
3 Max Fy -10.00 560.27 -10.50 15.76 -15.01 136.76 21.54 773.70 35.92 -9.51 787.64 82.82 > 1.50 , SAFE!
JO / EWO
4 Min Fy -6.00 9.88 -3.50 5.25 -15.01 136.76 7.18 164.24 22.87 -11.71 180.37 15.4 > 1.50 , SAFE!
07/14/2021
5 Max Fz -10.00 560.27 10.50 -15.76 -15.01 136.76 -9.99 773.70 77.45 -9.51 787.64 82.82 > 1.50 , SAFE!
DATE
6 Min Fz -6.00 560.27 -10.50 15.76 -15.01 136.76 21.54 773.70 35.92 -11.71 787.64 67.26 > 1.50 , SAFE!
REV
NO.
7 Max Mx -10.00 560.27 -10.50 15.76 -15.01 136.76 21.54 773.70 35.92 -9.51 787.64 82.82 > 1.50 , SAFE!
A
DISCIPLINE 8 Min Mx -10.00 560.27 10.50 -15.76 -15.01 136.76 -9.99 773.70 77.45 -9.51 787.64 82.82 > 1.50 , SAFE!
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 9 Max My -10.00 357.27 0.00 0.00 -15.01 136.76 0.00 543.43 n.a. -9.51 563.19 59.22 > 1.50 , SAFE!
PROJECT 10 Min My -10.00 357.27 0.00 0.00 -15.01 136.76 0.00 543.43 n.a. -9.51 563.19 59.22 > 1.50 , SAFE!
ENGINEER
____________
DATE: ___________ 11 Max Mz 25.50 254.88 0.00 0.00 38.28 136.76 0.00 430.80 n.a. 52.31 481.72 9.21 > 1.50 , SAFE!
12 Min Mz -41.50 396.79 0.00 0.00 -62.30 136.76 0.00 586.91 n.a. -39.48 672.27 17.03 > 1.50 , SAFE!
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
CONSTRUCTION
AGENCY
FIRAS MOUSA
DATE: ___________
OPERATIONS
_____________
DATE: ___________
______________
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
BY DRAWING COMPLET
NO.___________
REVISION C
OF THIS DRAWING I
APPROVAL/CERTIFICA
THIS INDICATES
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 18 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
BASE PRESSURE
CONDITION
A eX' qUmax X qUmin X MZ MRZ eZ' qUmax Z qUmin Z MX MRX
Evaluation Evaluation
(m2) (m) (kPa) (kPa) (kN-m) (kN-m) (m) (kPa) (kPa) (kN-m) (kN-m)
DESCRIPTION
1 Min Fy 4.84 0.133 110.68 51.76 - 0.00 SAFE! 0.000 81.22 81.22 - - SAFE!
2 Max Fz 4.84 -0.159 158.78 62.72 - - SAFE! 0.000 110.75 110.75 - - SAFE!
3 Min Fz 4.84 -0.029 155.40 132.62 - - SAFE! 0.014 149.51 138.52 - - SAFE!
JO / EWO
4 Max Mx 4.84 -0.125 40.63 19.97 - - SAFE! 0.023 32.20 28.40 - - SAFE!
07/14/2021
5 Min Mx 4.84 -0.029 155.40 132.62 - - SAFE! -0.014 149.51 138.52 - - SAFE!
DATE
6 Max My 4.84 -0.026 154.23 133.80 - - SAFE! 0.014 149.51 138.52 - - SAFE!
REV
NO.
7 Min My 4.84 -0.029 155.40 132.62 - - SAFE! 0.014 149.51 138.52 - - SAFE!
A
DISCIPLINE 8 Max Mz 4.84 -0.029 155.40 132.62 - - SAFE! -0.014 149.51 138.52 - - SAFE!
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 9 Min Mz 4.84 -0.042 113.76 90.38 - - SAFE! 0.000 102.07 102.07 - - SAFE!
PROJECT 10 0.00 4.84 -0.042 113.76 90.38 - - SAFE! 0.000 102.07 102.07 - - SAFE!
ENGINEER
____________
DATE: ___________ 11 0.00 4.84 0.134 110.49 51.35 - - SAFE! 0.000 80.92 80.92 - - SAFE!
12 0.00 4.84 -0.160 158.34 62.13 - - SAFE! 0.000 110.24 110.24 - - SAFE!
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
CONSTRUCTION
AGENCY
FIRAS MOUSA
DATE: ___________
OPERATIONS
_____________
DATE: ___________
______________
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
NO.__________________
BY DRAWING COMPLETION CER
OF THIS DRAWING IS COVER
THIS INDICATES THAT RE
REVISION CERTIFIC
APPROVAL/CERTIFICATION RE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 19 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
STRENGTH CHECK
ENGG
f'c = 28 MPa concrete compressive strength dY = 455 mm effective depth along y-dir
fy = 414 MPa reinforcing steel yeild strength d = 455 mm least effective depth
07/14/2021
ULTIMATE REACTIONS
DATE
DISCIPLINE 1 Max Fx ULC - 1.2D + L + Exb 40.00 558.72 0.00 0.00 60.03
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 2 Min Fx ULC - 0.9D + Exa 54.00 381.54 0.00 0.00 -81.04
PROJECT 3 Max Fy ULC - 1.2D + L + Eyb 5.00 788.72 15.00 22.52 -7.50
ENGINEER
____________
DATE: ___________ 4 Min Fy ULC - 1.2D + L + Eya 9.00 29.31 5.00 7.51 -7.50
CONSTRUCTION 7 Max Mx ULC - 1.2D + L + Eya 5.00 788.72 15.00 22.52 -7.50
AGENCY
FIRAS MOUSA
DATE: ___________ 8 Min Mx ULC - 1.2D + L + Eyb 5.00 788.72 15.00 -22.52 -7.50
OPERATIONS 9 Max My ULC - 1.2D + L + Exb 14.00 500.17 0.00 0.00 -21.01
_____________
DATE: ___________ 10 Min My ULC - 0.9D + Exa 14.00 500.17 0.00 0.00 -21.01
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
______________________
DICATES THAT REV. NO. A
VISION CERTIFICATE
THIS INDICATES THAT REV. NO. A
APPROVAL/CERTIFICATION REQUIREM
OF THIS DRAWING IS COVERED, FOR
NO.________________________
BY DRAWING COMPLETION CERTIFICAT
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 20 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
CONDITION
eX' qUmax X eZ' qUmax Z
(m) (kPa) (m) (kPa)
DESCRIPTION
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
21 OF 53 A
APPROVAL/C
NO.___
BY DRAWING
R
OF THIS D
THIS I
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 21 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
X- Direction (at a dist."dX" from face) Z-Direction (at a dist."dZ" from face)
VUWX = qU [ ( LX / 2 + eX ) - dX ] LZ VUWZ = qU [ ( LZ / 2 + eZ ) - dZ ] LX
DESCRIPTION
= 313.23 kN = 313.23 kN
DISCIPLINE
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 provided, 12mm @ 100mm O.C. provided, 12mm @ 100mm O.C.
PROJECT Astxact = 2432 mm2 > Astx SAFE! Astzact = 2432 mm2 > Asty SAFE!
ENGINEER
____________
DATE: ___________
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
CONSTRUCTION
AGENCY
FIRAS MOUSA
DATE: ___________
OPERATIONS
_____________
DATE: ___________
______________
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
BY DRAWING COMPLET
NO.___________
REVISION C
OF THIS DRAWING I
APPROVAL/CERTIFICA
THIS INDICATES
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 22 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
MUXdes = 335.44 kN.m ultimate design moment MUZdes = 310.05 kN.m ultimate design moment
DESCRIPTION
ω = 0.0297 ω = 0.0275
ρ = ω f'c / fy ρ = ω f'c / fy
JO / EWO
ρ = 0.002 ρ = 0.0019
07/14/2021
DATE
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
20mm @ 130mm O.C. 20mm @ 130mm O.C.
CONSTRUCTION AsXact = 5268 mm2 > Asx SAFE! AsZact = 5268 mm2 > Asz SAFE!
AGENCY
FIRAS MOUSA
DATE: ___________
OPERATIONS
_____________
DATE: ___________
______________
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
NO.__________________
BY DRAWING COMPLETION CER
OF THIS DRAWING IS COVER
THIS INDICATES THAT RE
REVISION CERTIFIC
APPROVAL/CERTIFICATION RE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 23 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
ground slab
(if any)
ENGG
Footing Name : F2
t
FOOTING GEOMETRY DW
h
SD
GWT
D
DESCRIPTION
lZ
DW
07/14/2021
LZ
lX
DISCIPLINE h = 1.5 m pedestal height
ENGINEER LX
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 t = 0 mm ground slab thickness (assumed)
PROJECT eX = 0 m distance along x axis from the centroid of footing to centroid of pedestal
ENGINEER
____________
DATE: ___________ eZ = 0 m distance along z axis from the centroid of footing to centroid of pedestal
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
CONSTANTS AND ALLOWABLE LIMITS
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
______________________
DICATES THAT REV. NO. A
APPROVAL/CERTIFICATION REQUIREM
OF THIS DRAWING IS COVERED, FOR
NO.________________________
BY DRAWING COMPLETION CERTIFICAT
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 24 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
FOUNDATION WEIGHT
ENGG
SERVICE REACTIONS
PROJECT 6 Min Fz SLC - 0.6D + 0.7Eyc -6.00 560.27 -10.50 15.76 -15.01
ENGINEER
____________
DATE: ___________ 7 Max Mx SLC - D + 0.7Eya -10.00 560.27 -10.50 15.76 -15.01
CERTIFIED
8 Min Mx SLC - D + 0.7Eyb -10.00 560.27 10.50 -15.76 -15.01
ABDULBASIT KHAN
DATE: 07/14/2021
9 Max My SLC - 0.6D + 0.7Exb -10.00 357.27 0.00 0.00 -15.01
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
_______________
THAT REV. NO. A
CERTIFICATE
BY DRAWING COMPLETION CERTIFICATE (DCC)
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 25 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
FY
CERT
ABK
STABILITY CHECK
FX
base plate level
ENGG
SLIDING CHECK
T
FS = mRY / FH factor of safety againts sliding
y
LX
x
UPLIFT CHECK
JO / EWO
LX LZ (D - DW) gW
07/14/2021
where: BF =
DATE
FX
MX
note: if D < DW, then no bouyant force, BF
MZ LZ
REV
NO.
DISCIPLINE
ENGINEER x
FZ
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 OVERTURNING CHECK
LX
PROJECT OMX = FZ H + M X maximum overturning moment about x-axis
ENGINEER
____________
DATE: ___________ OMZ = FX H + M Z maximum overturning moment about y-axis
CERTIFIED
where: H = T+h
ABDULBASIT KHAN
DATE: 07/14/2021
RMX = (WT + FY - BF) (eZ' + LZ / 2) righting moment about x-axis
OPERATIONS
_____________
DATE: ___________ BASE PRESSURE CHECK
e X' = (FX H + MZ) / (WT + FY) + eX eccentricity of load along x-axis from the centroid of footing
______________
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
eZ ' = (FZ H + MX) / (WT + FY) + eZ eccentricity of load along z-axis from the centroid of footing
BY DRAWING COMPLETION CERTIFICATE (DCC)
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 26 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
CONDITION
FX FY FZ WT FH RY FS Evaluation UF FS Evaluation
DESCRIPTION
1 Max Fx 25.50 256.36 0.00 136.76 25.50 136.76 5.93 > 1.50 , SAFE! n.a. n.a. n.a.
2 Min Fx -41.50 399.27 0.00 136.76 41.50 136.76 5.02 > 1.50 , SAFE! n.a. n.a. n.a.
3 Max Fy -10.00 560.27 -10.50 136.76 14.50 126.26 18.82 > 1.50 , SAFE! n.a. n.a. n.a.
JO / EWO
4 Min Fy -6.00 9.88 -3.50 136.76 6.95 133.26 7.58 > 1.50 , SAFE! n.a. n.a. n.a.
07/14/2021
5 Max Fz -10.00 560.27 10.50 136.76 14.50 147.26 18.82 > 1.50 , SAFE! n.a. n.a. n.a.
DATE
6 Min Fz -6.00 560.27 -10.50 136.76 12.09 126.26 22.57 > 1.50 , SAFE! n.a. n.a. n.a.
REV
NO.
7 Max Mx -10.00 560.27 -10.50 136.76 14.50 126.26 18.82 > 1.50 , SAFE! n.a. n.a. n.a.
A
DISCIPLINE 8 Min Mx -10.00 560.27 10.50 136.76 14.50 147.26 18.82 > 1.50 , SAFE! n.a. n.a. n.a.
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 9 Max My -10.00 357.27 0.00 136.76 10.00 136.76 19.16 > 1.50 , SAFE! n.a. n.a. n.a.
PROJECT 10 Min My -10.00 357.27 0.00 136.76 10.00 136.76 19.16 > 1.50 , SAFE! n.a. n.a. n.a.
ENGINEER
____________
DATE: ___________ 11 Max Mz 25.50 254.88 0.00 136.76 25.50 136.76 5.91 > 1.50 , SAFE! n.a. n.a. n.a.
12 Min Mz -41.50 396.79 0.00 136.76 41.50 136.76 5.00 > 1.50 , SAFE! n.a. n.a. n.a.
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
CONSTRUCTION
AGENCY
FIRAS MOUSA
DATE: ___________
OPERATIONS
_____________
DATE: ___________
______________
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
By:______
Control Nu
_________
DATE:____
VERIFICA
EDS
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 27 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
1 Max Fx 25.50 256.36 0.00 0.00 38.27 136.76 0.00 397.06 n.a. 89.27 487.81 5.46 > 1.50 , SAFE!
2 Min Fx -41.50 399.27 0.00 0.00 -62.28 136.76 0.00 547.11 n.a. 20.72 693.01 33.45 > 1.50 , SAFE!
3 Max Fy -10.00 560.27 -10.50 15.76 -15.01 136.76 36.76 722.98 19.67 4.99 750.27 150.35 > 1.50 , SAFE!
JO / EWO
4 Min Fy -6.00 9.88 -3.50 5.25 -15.01 136.76 12.25 139.57 11.39 -3.01 165.90 55.12 > 1.50 , SAFE!
07/14/2021
5 Max Fz -10.00 560.27 10.50 -15.76 -15.01 136.76 5.24 722.98 137.97 4.99 750.27 150.35 > 1.50 , SAFE!
DATE
6 Min Fz -6.00 560.27 -10.50 15.76 -15.01 136.76 36.76 722.98 19.67 -3.01 743.45 246.99 > 1.50 , SAFE!
REV
NO.
7 Max Mx -10.00 560.27 -10.50 15.76 -15.01 136.76 36.76 722.98 19.67 4.99 750.27 150.35 > 1.50 , SAFE!
A
DISCIPLINE 8 Min Mx -10.00 560.27 10.50 -15.76 -15.01 136.76 5.24 722.98 137.97 4.99 750.27 150.35 > 1.50 , SAFE!
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 9 Max My -10.00 357.27 0.00 0.00 -15.01 136.76 0.00 503.01 n.a. 4.99 536.55 107.53 > 1.50 , SAFE!
PROJECT 10 Min My -10.00 357.27 0.00 0.00 -15.01 136.76 0.00 503.01 n.a. 4.99 536.55 107.53 > 1.50 , SAFE!
ENGINEER
____________
DATE: ___________ 11 Max Mz 25.50 254.88 0.00 0.00 38.28 136.76 0.00 395.50 n.a. 89.28 485.90 5.44 > 1.50 , SAFE!
12 Min Mz -41.50 396.79 0.00 0.00 -62.30 136.76 0.00 544.51 n.a. 20.70 689.71 33.32 > 1.50 , SAFE!
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
CONSTRUCTION
AGENCY
FIRAS MOUSA
DATE: ___________
OPERATIONS
_____________
DATE: ___________
______________
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
______________
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 28 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
BASE PRESSURE
CONDITION
A eX' qUmax X qUmin X MZ MRZ eZ' qUmax Z qUmin Z MX MRX
Evaluation Evaluation
(m2) (m) (kPa) (kPa) (kN-m) (kN-m) (m) (kPa) (kPa) (kN-m) (kN-m)
DESCRIPTION
1 Min Fy 4.41 0.236 143.57 27.93 - - SAFE! 0.000 85.75 85.75 - - SAFE!
2 Max Fz 4.41 -0.279 212.34 23.97 - - SAFE! 0.000 118.15 118.15 - - SAFE!
3 Min Fz 4.41 -0.051 177.20 132.13 - - SAFE! -0.008 158.20 151.13 - - SAFE!
JO / EWO
4 Max Mx 4.41 -0.205 47.34 12.37 - - SAFE! -0.013 30.97 28.75 - - SAFE!
07/14/2021
5 Min Mx 4.41 -0.051 177.20 132.13 - - SAFE! 0.008 158.20 151.13 - - SAFE!
DATE
6 Max My 4.41 -0.040 172.34 136.99 - - SAFE! -0.008 158.20 151.13 - - SAFE!
REV
NO.
7 Min My 4.41 -0.051 177.20 132.13 - - SAFE! -0.008 158.20 151.13 - - SAFE!
A
DISCIPLINE 8 Max Mz 4.41 -0.051 177.20 132.13 - - SAFE! 0.008 158.20 151.13 - - SAFE!
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 9 Min Mz 4.41 -0.073 131.29 85.97 - - SAFE! 0.000 108.63 108.63 - - SAFE!
PROJECT 10 0.00 4.41 -0.073 131.29 85.97 - - SAFE! 0.000 108.63 108.63 - - SAFE!
ENGINEER
____________
DATE: ___________ 11 0.00 4.41 0.237 143.25 27.58 - - SAFE! 0.000 85.41 85.41 - - SAFE!
12 0.00 4.41 -0.280 211.67 23.52 - - SAFE! 0.000 117.59 117.59 - - SAFE!
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
CONSTRUCTION
AGENCY
FIRAS MOUSA
DATE: ___________
OPERATIONS
_____________
DATE: ___________
______________
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 29 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
STRENGTH CHECK
ENGG
f'c = 28 MPa concrete compressive strength dY = 455 mm effective depth along y-dir
fy = 414 MPa reinforcing steel yeild strength d = 455 mm least effective depth
07/14/2021
ULTIMATE REACTIONS
DATE
DISCIPLINE 1 Max Fx ULC - 1.2D + L + Exb 40.00 558.72 0.00 0.00 60.03
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 2 Min Fx ULC - 0.9D + Exa 54.00 381.54 0.00 0.00 -81.04
PROJECT 3 Max Fy ULC - 1.2D + L + Eyb 5.00 788.72 15.00 22.52 -7.50
ENGINEER
____________
DATE: ___________ 4 Min Fy ULC - 1.2D + L + Eya 9.00 29.31 5.00 7.51 -7.50
CONSTRUCTION 7 Max Mx ULC - 1.2D + L + Eya 5.00 788.72 15.00 22.52 -7.50
AGENCY
FIRAS MOUSA
DATE: ___________ 8 Min Mx ULC - 1.2D + L + Eyb 5.00 788.72 15.00 -22.52 -7.50
OPERATIONS 9 Max My ULC - 1.2D + L + Exb 14.00 500.17 0.00 0.00 -21.01
_____________
DATE: ___________
OPERATIONS
_____________
DATE: ___________ 10 Min My ULC - 0.9D + Exa 14.00 500.17 0.00 0.00 -21.01
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 30 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
CONDITION
eX' qUmax X eZ' qUmax Z
(m) (kPa) (m) (kPa)
DESCRIPTION
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 31 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
X- Direction (at a dist."dX" from face) Z-Direction (at a dist."dZ" from face)
VUWX = qU [ ( LX / 2 + eX ) - dX ] LZ VUWZ = qU [ ( LZ / 2 + eZ ) - dZ ] LX
DESCRIPTION
= 355.8 kN = 355.8 kN
DISCIPLINE
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 provided, 12mm @ 150mm O.C. provided, 12mm @ 150mm O.C.
PROJECT Astxact = 1583 mm2 > Astx SAFE! Astzact = 1583 mm2 > Asty SAFE!
ENGINEER
____________
DATE: ___________
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
CONSTRUCTION
AGENCY
FIRAS MOUSA
DATE: ___________
CONSTRUCTION
AGENCY
FIRAS MOUSA
DATE: ___________
OPERATIONS
_____________
DATE: ___________
______________
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 32 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
MUXdes = 437.88 kN.m ultimate design moment MUZdes = 328.03 kN.m ultimate design moment
DESCRIPTION
ω = 0.052 ω = 0.0387
ρ = ω f'c / fy ρ = ω f'c / fy
JO / EWO
ρ = 0.004 ρ = 0.0026
07/14/2021
DATE
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
20mm @ 150mm O.C. 20mm @ 150mm O.C.
CONSTRUCTION AsXact = 4398 mm2 > Asx SAFE! AsZact = 4398 mm2 > Asz SAFE!
AGENCY
FIRAS MOUSA
DATE: ___________
OPERATIONS
_____________
DATE: ___________
______________
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 33 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
ground slab
(if any)
ENGG
Footing Name : F3
t
FOOTING GEOMETRY DW
h
SD
GWT
DESCRIPTION
D
LX = 2.0 m footing width along x-axis
T
lZ
DW
07/14/2021
LZ
lX
DISCIPLINE h = 1.5 m pedestal height
ENGINEER LX
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 t = 0 mm ground slab thickness (assumed)
PROJECT eX = 0 m distance along x axis from the centroid of footing to centroid of pedestal
ENGINEER
____________
DATE: ___________ eZ = 0 m distance along z axis from the centroid of footing to centroid of pedestal
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
CONSTANTS AND ALLOWABLE LIMITS
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 34 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
FOUNDATION WEIGHT
ENGG
SERVICE REACTIONS
PROJECT 6 Min Fz SLC - 0.6D + 0.7Eyc -6.00 560.27 -10.50 15.76 -15.01
ENGINEER
____________
DATE: ___________ 7 Max Mx SLC - D + 0.7Eya -10.00 560.27 -10.50 15.76 -15.01
CERTIFIED
8 Min Mx SLC - D + 0.7Eyb -10.00 560.27 10.50 -15.76 -15.01
ABDULBASIT KHAN
DATE: 07/14/2021
9 Max My SLC - 0.6D + 0.7Exb -10.00 357.27 0.00 0.00 -15.01
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 35 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
FY
CERT
ABK
STABILITY CHECK
FX
base plate level
ENGG
SLIDING CHECK
T
FS = mRY / FH factor of safety againts sliding
y
LX
x
UPLIFT CHECK
JO / EWO
LX LZ (D - DW) gW
07/14/2021
where: BF =
DATE
FX
MX
note: if D < DW, then no bouyant force, BF
MZ LZ
REV
NO.
DISCIPLINE
ENGINEER x
FZ
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 OVERTURNING CHECK
LX
PROJECT OMX = FZ H + M X maximum overturning moment about x-axis
ENGINEER
____________
DATE: ___________
PROJECT
ENGINEER
____________
DATE: ___________ OMZ = FX H + M Z maximum overturning moment about y-axis
CERTIFIED
where: H = T+h
ABDULBASIT KHAN
DATE: 07/14/2021
RMX = (WT + FY - BF) (eZ' + LZ / 2) righting moment about x-axis
OPERATIONS
_____________
DATE: ___________ BASE PRESSURE CHECK
e X' = (FX H + MZ) / (WT + FY) + eX eccentricity of load along x-axis from the centroid of footing
______________
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
eZ ' = (FZ H + MX) / (WT + FY) + eZ eccentricity of load along z-axis from the centroid of footing
BY DRAWING COMPLETION CERTIFICATE (DCC)
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 36 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
CONDITION
FX FY FZ WT FH RY FS Evaluation UF FS Evaluation
DESCRIPTION
1 Max Fx 25.50 256.36 0.00 136.76 25.50 364.03 5.71 > 1.50 , SAFE! n.a. n.a. n.a.
2 Min Fx -41.50 399.27 0.00 136.76 41.50 506.94 4.89 > 1.50 , SAFE! n.a. n.a. n.a.
3 Max Fy -10.00 560.27 -10.50 136.76 14.50 667.94 18.43 > 1.50 , SAFE! n.a. n.a. n.a.
JO / EWO
4 Min Fy -6.00 9.88 -3.50 136.76 6.95 117.55 6.77 > 1.50 , SAFE! n.a. n.a. n.a.
07/14/2021
5 Max Fz -10.00 560.27 10.50 136.76 14.50 667.94 18.43 > 1.50 , SAFE! n.a. n.a. n.a.
DATE
6 Min Fz -6.00 560.27 -10.50 136.76 12.09 667.94 22.10 > 1.50 , SAFE! n.a. n.a. n.a.
REV
NO.
7 Max Mx -10.00 560.27 -10.50 136.76 14.50 667.94 18.43 > 1.50 , SAFE! n.a. n.a. n.a.
A
DISCIPLINE 8 Min Mx -10.00 560.27 10.50 136.76 14.50 667.94 18.43 > 1.50 , SAFE! n.a. n.a. n.a.
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 9 Max My -10.00 357.27 0.00 136.76 10.00 464.94 18.60 > 1.50 , SAFE! n.a. n.a. n.a.
PROJECT 10 Min My -10.00 357.27 0.00 136.76 10.00 464.94 18.60 > 1.50 , SAFE! n.a. n.a. n.a.
ENGINEER
____________
DATE: ___________ 11 Max Mz 25.50 254.88 0.00 136.76 25.50 362.55 5.69 > 1.50 , SAFE! n.a. n.a. n.a.
12 Min Mz -41.50 396.79 0.00 136.76 41.50 504.46 4.86 > 1.50 , SAFE! n.a. n.a. n.a.
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
CONSTRUCTION
AGENCY
FIRAS MOUSA
DATE: ___________
OPERATIONS
_____________
DATE: ___________
______________
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 37 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
1 Max Fx 25.50 256.36 0.00 0.00 38.27 136.76 0.00 364.03 n.a. 88.00 451.40 5.13 > 1.50 , SAFE!
2 Min Fx -41.50 399.27 0.00 0.00 -62.28 136.76 0.00 506.94 n.a. 18.65 648.88 34.79 > 1.50 , SAFE!
3 Max Fy -10.00 560.27 -10.50 15.76 -15.01 136.76 36.24 674.62 18.62 4.49 701.34 156.2 > 1.50 , SAFE!
JO / EWO
4 Min Fy -6.00 9.88 -3.50 5.25 -15.01 136.76 12.08 118.73 9.83 -3.31 144.59 43.68 > 1.50 , SAFE!
07/14/2021
5 Max Fz -10.00 560.27 10.50 -15.76 -15.01 136.76 4.72 674.62 142.93 4.49 701.34 156.2 > 1.50 , SAFE!
DATE
6 Min Fz -6.00 560.27 -10.50 15.76 -15.01 136.76 36.24 674.62 18.62 -3.31 694.66 209.87 > 1.50 , SAFE!
REV
NO.
7 Max Mx -10.00 560.27 -10.50 15.76 -15.01 136.76 36.24 674.62 18.62 4.49 701.34 156.2 > 1.50 , SAFE!
A
DISCIPLINE 8 Min Mx -10.00 560.27 10.50 -15.76 -15.01 136.76 4.72 674.62 142.93 4.49 701.34 156.2 > 1.50 , SAFE!
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021
DISCIPLINE
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 9 Max My -10.00 357.27 0.00 0.00 -15.01 136.76 0.00 464.94 n.a. 4.49 497.49 110.8 > 1.50 , SAFE!
PROJECT 10 Min My -10.00 357.27 0.00 0.00 -15.01 136.76 0.00 464.94 n.a. 4.49 497.49 110.8 > 1.50 , SAFE!
ENGINEER
____________
DATE: ___________ 11 Max Mz 25.50 254.88 0.00 0.00 38.28 136.76 0.00 362.55 n.a. 88.01 449.56 5.11 > 1.50 , SAFE!
12 Min Mz -41.50 396.79 0.00 0.00 -62.30 136.76 0.00 504.46 n.a. 18.63 645.71 34.66 > 1.50 , SAFE!
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
CONSTRUCTION
AGENCY
FIRAS MOUSA
DATE: ___________
OPERATIONS
_____________
DATE: ___________
______________
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 38 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
BASE PRESSURE
CONDITION
A eX' qUmax X qUmin X MZ MRZ eZ' qUmax Z qUmin Z MX MRX
Evaluation Evaluation
(m2) (m) (kPa) (kPa) (kN-m) (kN-m) (m) (kPa) (kPa) (kN-m) (kN-m)
DESCRIPTION
1 Min Fy 4.00 0.242 157.08 24.94 - - SAFE! 0.000 91.01 91.01 - - SAFE!
2 Max Fz 4.00 -0.282 233.95 19.52 - - SAFE! 0.000 126.74 126.74 - - SAFE!
3 Min Fz 4.00 -0.052 193.03 140.94 - - SAFE! -0.007 170.49 163.48 - - SAFE!
JO / EWO
4 Max Mx 4.00 -0.227 49.40 9.37 - - SAFE! -0.013 30.53 28.24 - - SAFE!
07/14/2021
5 Min Mx 4.00 -0.052 193.03 140.94 - - SAFE! 0.007 170.49 163.48 - - SAFE!
DATE
6 Max My 4.00 -0.040 187.02 146.95 - - SAFE! -0.007 170.49 163.48 - - SAFE!
REV
NO.
7 Min My 4.00 -0.052 193.03 140.94 - - SAFE! -0.007 170.49 163.48 - - SAFE!
A
DISCIPLINE 8 Max Mz 4.00 -0.052 193.03 140.94 - - SAFE! 0.007 170.49 163.48 - - SAFE!
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 9 Min Mz 4.00 -0.074 142.04 90.43 - - SAFE! 0.000 116.24 116.24 - - SAFE!
PROJECT 10 0.00 4.00 -0.074 142.04 90.43 - - SAFE! 0.000 116.24 116.24 - - SAFE!
ENGINEER
____________
DATE: ___________ 11 0.00 4.00 0.243 156.71 24.56 - - SAFE! 0.000 90.64 90.64 - - SAFE!
12 0.00 4.00 -0.284 233.56 18.67 - - SAFE! 0.000 126.12 126.12 - - SAFE!
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
CONSTRUCTION
AGENCY
FIRAS MOUSA
DATE: ___________
OPERATIONS
_____________
DATE: ___________
______________
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 39 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
STRENGTH CHECK
ENGG
f'c = 28 MPa concrete compressive strength dY = 455 mm effective depth along y-dir
fy = 414 MPa reinforcing steel yeild strength d = 455 mm least effective depth
07/14/2021
ULTIMATE REACTIONS
DATE
A
DISCIPLINE 1 Max Fx ULC - 1.2D + L + Exb 40.00 558.72 0.00 0.00 60.03
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 2 Min Fx ULC - 0.9D + Exa 54.00 381.54 0.00 0.00 -81.04
PROJECT 3 Max Fy ULC - 1.2D + L + Eyb 5.00 788.72 15.00 22.52 -7.50
ENGINEER
____________
DATE: ___________ 4 Min Fy ULC - 1.2D + L + Eya 9.00 29.31 5.00 7.51 -7.50
CONSTRUCTION 7 Max Mx ULC - 1.2D + L + Eya 5.00 788.72 15.00 22.52 -7.50
AGENCY
FIRAS MOUSA
DATE: ___________ 8 Min Mx ULC - 1.2D + L + Eyb 5.00 788.72 15.00 -22.52 -7.50
OPERATIONS 9 Max My ULC - 1.2D + L + Exb 14.00 500.17 0.00 0.00 -21.01
_____________
DATE: ___________ 10 Min My ULC - 0.9D + Exa 14.00 500.17 0.00 0.00 -21.01
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 40 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
CONDITION
eX' qUmax X eZ' qUmax Z
(m) (kPa) (m) (kPa)
DESCRIPTION
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 41 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
X- Direction (at a dist."dX" from face) Z-Direction (at a dist."dZ" from face)
VUWX = qU [ ( LX / 2 + eX ) - dX ] LZ VUWZ = qU [ ( LZ / 2 + eZ ) - dZ ] LX
DESCRIPTION
= 370.89 kN = 370.89 kN
DISCIPLINE
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 provided, 12mm @ 150mm O.C. provided, 12mm @ 150mm O.C.
PROJECT Astxact = 1583 mm2 > Astx SAFE! Astzact = 1583 mm2 > Asty SAFE!
ENGINEER
____________
DATE: ___________
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
CONSTRUCTION
AGENCY
FIRAS MOUSA
DATE: ___________
OPERATIONS
_____________
DATE: ___________
______________
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 42 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
MUXdes = 420.94 kN.m ultimate design moment MUZdes = 309.81 kN.m ultimate design moment
DESCRIPTION
ω = 0.052 ω = 0.0387
ρ = ω f'c / fy ρ = ω f'c / fy
JO / EWO
19-20640-000
JO / EWO
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
20mm @ 150mm O.C. 20mm @ 150mm O.C.
CONSTRUCTION AsXact = 4189 mm2 > Asx SAFE! AsZact = 4189 mm2 > Asz SAFE!
AGENCY
FIRAS MOUSA
DATE: ___________
OPERATIONS
_____________
DATE: ___________
______________
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 43 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
Footing Name : F4
ENGG
FOOTING GEOMETRY
lX
07/14/2021
PROJECT eZ = -1.3 m distance along z axis from the centroid of footing to centroid of pedestal
ENGINEER
____________
DATE: ___________
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
CONSTRUCTION
AGENCY
FIRAS MOUSA
DATE: ___________
OPERATIONS
_____________
DATE: ___________
______________
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 44 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
07/14/2021
DATE
REV
NO.
DISCIPLINE
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021
PROJECT
ENGINEER
____________
DATE: ___________
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 45 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
07/14/2021
DATE
REV
NO.
DISCIPLINE
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021
PROJECT
ENGINEER
____________
DATE: ___________
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
CONSTRUCTION
AGENCY
FIRAS MOUSA
DATE: ___________
OPERATIONS
_____________
DATE: ___________
______________
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 46 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
07/14/2021
DATE
REV
NO.
DISCIPLINE
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021
PROJECT
ENGINEER
____________
DATE: ___________
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 47 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
ABK
19-20640-0002 ISSUED FOR CONSTRUCTION
DESCRIPTION
JO / EWO
07/14/2021
DATE
REV
NO.
DISCIPLINE
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021
PROJECT
ENGINEER
____________
DATE: ___________
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 48 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
Beam Design
07/14/2021
ρ = w fc' / fy = 0.00
______________
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
ρb (0.85 fc'
= β 600) / (fy (600 + fy) = 0.03
BY DRAWING COMPLETION CERTIFICATE (DCC)
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL
NO._________________________
THIS INDICATES THAT REV. NO. A
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 49 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
AS = ρbd = 385.08 mm2 required area of steel
ENGG
c = a/β = 39.403 mm
DESCRIPTION
εy = fy / Es = 0.0021
07/14/2021
at midspan
REV
NO.
DISCIPLINE w = 0.04
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 ρ = w fc' / fy = 0.0029
εy = fy / Es = 0.00
______________
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 50 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
OPRNS
FM
CERT
ABK
Web Reinforcement
ENGG
07/14/2021
(Ø VC) / 2 = 30.50 kN
REV
NO.
DISCIPLINE
ENGINEER
RYAN JOSEPH S.
QUEBRAR
DATE: 07/14/2021 VS = (VU - ØVC) / Ø = 5.92 kN
S = Av fy d / Vs = 5,075 mm
CERTIFIED
ABDULBASIT KHAN
DATE: 07/14/2021
S = 231 mm 200 mm
______________
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 51 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
FM
SAUDI ARABIAN OIL COMPANY
CERT
ABK
Torsional Reinforcement
ENGG
Ph = 2 ((b - cc - tieØ / 2) + (D - cc - tieØ / 2)) = 0.756 m perimeter of centerline of outermost closed torsional reinf.
JO / EWO
ØTcr = Ø 0.33 √ fC' (Acp2 / Pcp) = 9.3546 kN.m > TU no need to design for torsion
07/14/2021
PROJECT
ENGINEER
____________
DATE: ___________ L1 = VC / b d = 0.8802 MPa
OPERATIONS
_____________
DATE: ___________ √ (fv2 + fvt2) < Ø (L1+L2) ok, therefore section is large enough
______________
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
NO._________________________
THIS INDICATES THAT REV. NO. A
REVISION CERTIFICATE
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 52 OF 53 A
T
APPRO
OF T
N
BY DRA
52 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
xxxx-x-xxx [Issue Date: xx xxxxxx 2021, Revision # x]
PMT OPRNS
ABK
Al,min2 = 0.42 √ fC' Acp / fyt - 0.175 b / fyt Ph fyt / fy = 472.91 mm2
DATE
OPERATIONS
_____________
DATE: ___________ Web Reinforcement
DATE:_________
Control Number
By:__________
VERIFICATION
EDSD
Side Bars
NO._________________________
THIS INDICATES THAT REV. NO. A
OFFICE BUILDING DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
BY DRAWING COM
OF THIS DRAWI
NO._______
REVISI
APPROVAL/CERTI
THIS INDIC
STRUCTURAL CALCULATION OF FOUNDATION DOC
H31 A CALST001
Dhahran POD Building 3098 NEW EXPANSION & NEW WAREHOUSE 53 OF 53 A
DHAHRAN SAUDI ARABIA JO / EWO : 19-20640-0002
STEEL COLUMN
Z
Fz
REACTION
-Fz
TOP OF FOOTING ∇
Z
(CRITICAL SECTION FOR
Mu PEDESTAL)
X
TRANSFER FORCES