Republic of the Philippines

Quezon City

CITY ENGINEERING DEPARTMENT


Civic Center Building B, Quezon City Hall Compound, Elliptical Road
Diliman, Central 1100 Quezon City
Trunkline: +63 2 8988 4242

Date:_____________

ACCEPTANCE INSPECTION REPORT

Contract ID No. :________________________________

Project Name and Location :________________________________

Contract Price (Original/Revised) :________________________________

Contractor :________________________________

Implementing Office :________________________________

Date of Inspection :________________________________

Findings: : (Provide here a narrative Report of the Inspectorate


Team’s Previous Acceptance Inspection Report(s),
Indicating defects/failures after the one-year Defects
Liability Period observed by the Inspectorate Team
and repair works done by the contractor. If the First
Acceptance Inspection Report (No. 1) shows no
defects/failures, use the Final Acceptance Inspection
Report form instead of this report form.)
Recommendation:

We, the undersigned members of the Inspectorate Team, conducted a joint inspection of the
above stated project after the one-year Defects liability Period and noted the following
defects/failures which must be repaired/corrected by the contractor in order to comply with the
approved Plans and Specifications of the Contract:

_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________

____________________________________
___________________________________
(Head, Implementing Division) (Assistant City Engineer for Operations)

____________________________
ATTY. MARK DALE DIAMOND P. PERRAL
City Engineer

Page 1 of 1 DPWH
DO_040_S15