Professional Documents
Culture Documents
Quezon City
Date:_____________
Contractor :________________________________
We, the undersigned members of the Inspectorate Team, conducted a joint inspection of the
above stated project after the one-year Defects liability Period and noted the following
defects/failures which must be repaired/corrected by the contractor in order to comply with the
approved Plans and Specifications of the Contract:
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
____________________________________
___________________________________
(Head, Implementing Division) (Assistant City Engineer for Operations)
____________________________
ATTY. MARK DALE DIAMOND P. PERRAL
City Engineer
Page 1 of 1 DPWH
DO_040_S15