You are on page 1of 1

Construction of Salt Room at PepsiCo, Hattar

REQUEST FOR INSPECTION

Client: _____PepsiCo_____________________________ RFI NO: _____IBS/PH-MEP-00__

Consultant: ______KAA____________________________ Submission Date: _29-Nov-2019

Location: _____Construction of Salt Room___________ Inspection Date: ____________

Structure / Floor: __Plumbing Works Ground Floor____ Time: _____________________

Description of work Location / Floor Type/ Level / Ratio Quantity Dwg. No./ Ref

Pipe Laying Ground Floor Shop Drawing DR-01

Submitted by: _________IBS_______________________ Date: ________29-Nov-2019___

Project Manager / MEP Engineer (Ittefaq Building Solution):

__________________________________________________________________________________

Remarks by Consultant (Kashif Aslam Associates):


__________________________________________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________

Resident Engineer Signatures: ___________________________

You might also like