Submittal Title: Basement Floor Fire Water Tank Builder Work Discipline: Architectural Civil Electrical Mechanical HVAC Landscape ID Others (Specify here)
A = Approved (Work May Proceed)
B = Approved as Noted (Work May Proceed subject to incorporation of changes indicated) Overall Submittal Review Status: (c) C = Revise & Resubmit (Work Shall Not Proceed) D = Rejected N= Noted Initial review comments & responses are to remain within the re-submissions to keep a full review history within the same DRC until the "Review Status" states an "status A or B".
By Originator (Contractor / Sub- Reviewer
By Reviewer (Consultant/Client) Contractor) Response Document / Contractor Reference of Status SL# Rev. Reviewer Comments Drawing No. Response Compliance (Open/Closed) 1 MHCP6-ITCC-FF-FP-0008 00 - Provide the Firefighting water Pump materials submittals for approvals - Provide full furnished fire pump room shop drawings included all the details about pump concrete plinths, piping work and valves as per the civil defense requirement and pump manufacture instaurations. - The Fire water tank builder work is subject to approve the above mention submittals and not limited with.
Form No. 1999-FRM-C014, Rev. 0, 10/2018 Page 1 of 2
By Originator (Contractor / Sub- Reviewer By Reviewer (Consultant/Client) Contractor) Response Document / Contractor Reference of Status SL# Rev. Reviewer Comments Drawing No. Response Compliance (Open/Closed) 1 MHCP6-ITCC-FF-FP-0008 00 - Provide the fire tank effective water calculations as per the NFPA and Qatar civil defense requirements