DOCUMENT REVIEW COMMENTS (DRC)

Project Name: CONSTRUCTION OF AL MESHAF HEALTH CENTERE (PACKAGE 6) Project No.: BA 2017 C 009 G

Submittal Reference: MHCHP6-ITCC-SHD-FF-0001 Revision: 00 Date: 07-03-2019


Submittal Title: Basement Floor Fire Water Tank Builder Work
Discipline: Architectural Civil Electrical Mechanical HVAC Landscape ID Others (Specify here)

A = Approved (Work May Proceed)


B = Approved as Noted (Work May Proceed subject to incorporation of changes indicated)
Overall Submittal Review Status: (c) C = Revise & Resubmit (Work Shall Not Proceed)
D = Rejected
N= Noted
 Initial review comments & responses are to remain within the re-submissions to keep a full review history within the same DRC until the "Review Status" states an "status A or B".

By Originator (Contractor / Sub- Reviewer


By Reviewer (Consultant/Client)
Contractor) Response
Document / Contractor Reference of Status
SL# Rev. Reviewer Comments
Drawing No. Response Compliance (Open/Closed)
1 MHCP6-ITCC-FF-FP-0008 00 - Provide the Firefighting water Pump
materials submittals for approvals
- Provide full furnished fire pump room shop
drawings included all the details about pump
concrete plinths, piping work and valves as
per the civil defense requirement and pump
manufacture instaurations.
- The Fire water tank builder work is subject to
approve the above mention submittals and
not limited with.

Form No. 1999-FRM-C014, Rev. 0, 10/2018 Page 1 of 2


By Originator (Contractor / Sub- Reviewer
By Reviewer (Consultant/Client)
Contractor) Response
Document / Contractor Reference of Status
SL# Rev. Reviewer Comments
Drawing No. Response Compliance (Open/Closed)
1 MHCP6-ITCC-FF-FP-0008 00 - Provide the fire tank effective water
calculations as per the NFPA and Qatar civil
defense requirements

Reviewed By: Name: Osama Ahmed Designation: Mechanical Engineer Signature & Date:

Responded By: Name: Designation: Signature & Date:

Form No. 1999-FRM-C014, Rev. 0, 10/2018 Page 2 of 2